Datacenter Sites in STEUBEN, Indiana

STEUBEN has 75 scored datacenter candidate sites averaging 53.3/100 DC Readiness, with a catalogued aggregate of 350 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

STEUBEN, Indiana has 75 scored datacenter candidate sites averaging 53.3/100 DC Readiness, roughly in line with the Indiana average of 53.8. It ranks 33rd of 91 Indiana counties by number of sites and 40th by average score. The top-scoring site is OZ Steuben at 62.3/100.

75
Candidate sites
53.3/100
Avg DC Readiness
350 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in STEUBEN

Site-selection context for STEUBEN

Yessales_tax_exemption
Datacenter tax incentive
14.96¢/kWh
Commercial electricity
7.37¢/kWh
Industrial electricity
10
Fiber providers
Low
Water stress
$8,158
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

How does STEUBEN compare with other counties in Indiana?

By number of scored sites, STEUBEN ranks 33rd of the 91 Indiana counties with a county page, holding 0.9% of the state's 8,629 sites. Its average DC Readiness of 53.3/100 ranks 40th in the state and is roughly in line with the national average of 53.0. Nationally it has the 476th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 7 score 55 or higher.

What types of datacenter sites are in STEUBEN?

Manufacturing sites are the most common (60, 80% of the county's inventory), followed by substation-adjacent (6) and former mine (4). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in STEUBEN?

Industrial electricity averages 7.37¢/kWh and commercial 14.96¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (32). WRI water stress is low. 10 fiber providers report service in the county. The climate runs 1,000 cooling degree days a year with a mean temperature of 52°F. Land is valued around $8,158 an acre.

By site type

Top datacenter sites in STEUBEN

Top datacenter sites in STEUBEN
SiteTypeVoltageCapacityQueue waitScore
OZ SteubenGreenfield——3.0 yrs62.3
UNKNOWN123179Substation-Adjacent138 kV100 MW3.0 yrs58.9
UNKNOWN123178Substation-Adjacent69 kV50 MW3.0 yrs58.1
OTTERSubstation-Adjacent69 kV50 MW3.0 yrs57.8
ANGOLASubstation-Adjacent69 kV50 MW3.0 yrs56.9
UNKNOWN123181Substation-Adjacent69 kV50 MW3.0 yrs56.8
UNKNOWN160240Substation-Adjacent69 kV50 MW3.0 yrs56.5
MILLER POULTRY (POULTRY PROCESSING)Manufacturing——3.0 yrs53.8
GRANTCO MFG., INC. (ALL OTHER PLASTICS PRODUCT MANUFACTURING)Manufacturing——3.0 yrs53.6
DIVERSAPACK, LLC (ALL OTHER PLASTICS PRODUCT MANUFACTURING)Manufacturing——3.0 yrs53.6
KEMCO INTERNATIONAL, INC. (PETROLEUM LUBRICATING OIL AND GREASE MANUFACTURING)Manufacturing——3.0 yrs53.6
QUALITY CONVERTERS, INC. (ALL OTHER MOTOR VEHICLE PARTS MANUFACTURING)Manufacturing——3.0 yrs53.6
MADSEN WIRE PRODUCTS, LLC (OTHER FABRICATED WIRE PRODUCT MANUFACTURING)Manufacturing——3.0 yrs53.6
HUDSON INDUSTRIES, INC. (METAL STAMPING)Manufacturing——3.0 yrs53.2
COLD HEADING CO. (BOLT, NUT, SCREW, RIVET, AND WASHER MANUFACTURING)Manufacturing——3.0 yrs53.2
UNIVERTICAL CORP. (BARE PRINTED CIRCUIT BOARD MANUFACTURING)Manufacturing——3.0 yrs53.0
STEFFY WOOD PRODUCTS, INC. (NONUPHOLSTERED WOOD HOUSEHOLD FURNITURE MANUFACTURING)Manufacturing——3.0 yrs53.0
LOMONT HOLDINGS CO., INC. (CANVAS AND RELATED PRODUCT MILLS)Manufacturing——3.0 yrs53.0
METAL SPINNERS, INC. (ALL OTHER MISCELLANEOUS FABRICATED METAL PRODUCT MANUFACTURING)Manufacturing——3.0 yrs53.0
ANGOLA WIRE PRODUCTS, INC. (OTHER FABRICATED WIRE PRODUCT MANUFACTURING)Manufacturing——3.0 yrs53.0
Mine SiteFormer Mine——3.0 yrs53.0
TENNECO, INC. (ALL OTHER RUBBER PRODUCT MANUFACTURING)Manufacturing——3.0 yrs53.0
Mine SiteFormer Mine——3.0 yrs53.0
R.R. DONNELLEY & SONS CO. (MANIFOLD BUSINESS FORM PRINTING)Manufacturing——3.0 yrs53.0
E.J. BROOKS ANGOLA (HARDWARE MANUFACTURING)Manufacturing——3.0 yrs52.9

Every scored site in STEUBEN

All 75 sites, best first.

STEUBEN datacenter FAQ

How many datacenter sites are in STEUBEN?

75 scored datacenter candidate sites, averaging 53.3/100 DC Readiness. That is the 33rd-most of 91 Indiana counties with five or more sites.

What is the highest-scoring datacenter site in STEUBEN?

OZ Steuben scores 62.3/100 DC Readiness, the highest of the 75 scored sites in STEUBEN (a greenfield site).

Does STEUBEN offer datacenter tax incentives?

Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

What is the natural-hazard risk in STEUBEN?

FEMA's National Risk Index rates STEUBEN as "Relatively Moderate" (score 32).

What are industrial electricity rates in STEUBEN?

Average industrial electricity is 7.37¢/kWh and commercial is 14.96¢/kWh in STEUBEN.

More in Indiana

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in STEUBEN, Indiana”, https://gridcensus.com/datacenter-sites/indiana/steuben (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for STEUBEN, Indiana is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.