Datacenter Sites in SHELBY, Indiana

SHELBY has 70 scored datacenter candidate sites averaging 53.8/100 DC Readiness, with a catalogued aggregate of 2,200 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

SHELBY, Indiana has 70 scored datacenter candidate sites averaging 53.8/100 DC Readiness, roughly in line with the Indiana average of 53.8. It ranks 37th of 91 Indiana counties by number of sites and 33rd by average score. The top-scoring site is Substation-Adjacent site · 01ea50e7 at 64.1/100.

70
Candidate sites
53.8/100
Avg DC Readiness
2,200 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in SHELBY

Site-selection context for SHELBY

Yessales_tax_exemption
Datacenter tax incentive
12.24¢/kWh
Commercial electricity
8.70¢/kWh
Industrial electricity
14
Fiber providers
Low
Water stress
$10,164
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

How does SHELBY compare with other counties in Indiana?

By number of scored sites, SHELBY ranks 37th of the 91 Indiana counties with a county page, holding 0.8% of the state's 8,604 sites. Its average DC Readiness of 53.8/100 ranks 33rd in the state and is roughly in line with the national average of 53.0. Nationally it has the 538th-largest site inventory of 2,943 counties with five or more sites. 0 sites score 70 or higher and 14 score 55 or higher.

What types of datacenter sites are in SHELBY?

Manufacturing sites are the most common (48, 69% of the county's inventory), followed by substation-adjacent (14) and federal excess (3). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in SHELBY?

Industrial electricity averages 8.70¢/kWh and commercial 12.24¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (32). WRI water stress is low. 14 fiber providers report service in the county. The climate runs 1,000 cooling degree days a year with a mean temperature of 52°F. Land is valued around $10,164 an acre.

By site type

Top datacenter sites in SHELBY

Top datacenter sites in SHELBY
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN125086Substation-Adjacent345 kV600 MW3.0 yrs64.1
GWYNNEVILLESubstation-Adjacent345 kV600 MW3.0 yrs63.9
TAP138338Substation-Adjacent138 kV100 MW3.0 yrs59.6
UNKNOWN125094Substation-Adjacent138 kV100 MW3.0 yrs59.5
TAP138337Substation-Adjacent138 kV100 MW3.0 yrs59.5
UNKNOWN125091Substation-Adjacent138 kV100 MW3.0 yrs58.4
UNKNOWN125092Substation-Adjacent138 kV100 MW3.0 yrs58.3
UNKNOWN125087Substation-Adjacent138 kV100 MW3.0 yrs58.2
TAP139023Substation-Adjacent69 kV50 MW3.0 yrs57.7
UNKNOWN125084Substation-Adjacent69 kV50 MW3.0 yrs57.6
TAP160325Substation-Adjacent69 kV50 MW3.0 yrs57.6
FAIRLANDSubstation-Adjacent69 kV50 MW3.0 yrs57.6
UNKNOWN125229Substation-Adjacent69 kV50 MW3.0 yrs57.3
TAP138336Substation-Adjacent69 kV50 MW3.0 yrs55.7
BROOKFIELD SAND & GRAVEL, INC. (CUT STONE AND STONE PRODUCT MANUFACTURING)Manufacturing——3.0 yrs54.0
Greenfield (TAP138976 - UNKNOWN177259)Greenfield138 kV100 MW3.0 yrs53.7
M P L CORP. (CUT STONE AND STONE PRODUCT MANUFACTURING)Manufacturing——3.0 yrs53.5
JUPITER COIL COATERS (METAL COATING, ENGRAVING (EXCEPT JEWELRY AND SILVERWARE), AND ALLIED SERVICES TO MANUFACTURERS)Manufacturing——3.0 yrs53.5
KLOSTERMAN BAKERY, INC. (COMMERCIAL BAKERIES)Manufacturing——3.0 yrs53.3
FREUDENBERG-NOK SPECIAL SEALING PRODUCTS (ALL OTHER RUBBER PRODUCT MANUFACTURING)Manufacturing——3.0 yrs53.2
SHELBYVILLE INDIANAFederal Excess——3.0 yrs53.2
MERIDIAN AUTOMOTIVE SYSTEMS, INC. (AUTOMOBILE MANUFACTURING)Manufacturing——3.0 yrs53.1
BUNGE NORTH AMERICA, INC. (SOYBEAN PROCESSING)Manufacturing——3.0 yrs53.1
Mine SiteFormer Mine——3.0 yrs53.1
PARK 100 FOODS, INC. (SPECIALTY CANNING)Manufacturing——3.0 yrs53.1

Every scored site in SHELBY

All 70 sites, best first.

SHELBY datacenter FAQ

How many datacenter sites are in SHELBY?

70 scored datacenter candidate sites, averaging 53.8/100 DC Readiness. That is the 37th-most of 91 Indiana counties with five or more sites.

What is the highest-scoring datacenter site in SHELBY?

Substation-Adjacent site · 01ea50e7 scores 64.1/100 DC Readiness, the highest of the 70 scored sites in SHELBY (a substation-adjacent site).

Does SHELBY offer datacenter tax incentives?

Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

What is the natural-hazard risk in SHELBY?

FEMA's National Risk Index rates SHELBY as "Relatively Moderate" (score 32).

What are industrial electricity rates in SHELBY?

Average industrial electricity is 8.70¢/kWh and commercial is 12.24¢/kWh in SHELBY.

More in Indiana

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 22, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in SHELBY, Indiana”, https://gridcensus.com/datacenter-sites/indiana/shelby (data as of November 22, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for SHELBY, Indiana is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.