Datacenter Sites in PUTNAM, Indiana

PUTNAM has 35 scored datacenter candidate sites averaging 52.6/100 DC Readiness, with a catalogued aggregate of 950 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

PUTNAM, Indiana has 35 scored datacenter candidate sites averaging 52.6/100 DC Readiness, roughly in line with the Indiana average of 53.8. It ranks 68th of 91 Indiana counties by number of sites and 60th by average score. The top-scoring site is OZ Putnam at 59.0/100.

35
Candidate sites
52.6/100
Avg DC Readiness
950 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in PUTNAM

Site-selection context for PUTNAM

Yessales_tax_exemption
Datacenter tax incentive
11.22¢/kWh
Commercial electricity
8.78¢/kWh
Industrial electricity
8
Fiber providers
Low
Water stress
$8,265
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

How does PUTNAM compare with other counties in Indiana?

By number of scored sites, PUTNAM ranks 68th of the 91 Indiana counties with a county page, holding 0.4% of the state's 8,629 sites. Its average DC Readiness of 52.6/100 ranks 60th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1101st-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 6 score 55 or higher.

What types of datacenter sites are in PUTNAM?

Manufacturing sites are the most common (17, 49% of the county's inventory), followed by industrial (6) and greenfield (5). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in PUTNAM?

Industrial electricity averages 8.78¢/kWh and commercial 11.22¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (32). WRI water stress is low. 8 fiber providers report service in the county. The climate runs 1,000 cooling degree days a year with a mean temperature of 52°F. Land is valued around $8,265 an acre.

By site type

Top datacenter sites in PUTNAM

Top datacenter sites in PUTNAM
SiteTypeVoltageCapacityQueue waitScore
OZ PutnamGreenfield——3.0 yrs59.0
Greenfield (EDWARDSPORT STATION IGCC - AMO)Greenfield345 kV600 MW3.0 yrs57.8
UNKNOWN124568Substation-Adjacent138 kV100 MW3.0 yrs57.7
TAP138308Substation-Adjacent138 kV100 MW3.0 yrs57.4
EC Coal Putnam CountyGreenfield——3.0 yrs57.0
UNKNOWN124612Substation-Adjacent69 kV50 MW3.0 yrs55.2
Farmer's MarketIndustrial——3.0 yrs52.5
Former Ice HouseIndustrial——3.0 yrs52.5
EC Coal Putnam CountyGreenfield——3.0 yrs52.4
Former Midway MotelIndustrial——3.0 yrs52.3
MARTIN MARIETTA AGGREGATES (CUT STONE AND STONE PRODUCT MANUFACTURING)Manufacturing——3.0 yrs52.3
PUTNAM PLASTICS, INC. (PLASTICS BAG MANUFACTURING)Manufacturing——3.0 yrs52.3
DIXIE CHOPPER, MAGIC CIRCLE CORP. (NOT AVAILABLE)Manufacturing——3.0 yrs52.1
LIBERTY INDUSTRIES, INC. (TRUCK TRAILER MANUFACTURING)Manufacturing——3.0 yrs52.1
Mine SiteFormer Mine——3.0 yrs52.0
Mine SiteFormer Mine——3.0 yrs52.0
Greenfield (UNKNOWN124571 - TAP161553)Greenfield138 kV100 MW3.0 yrs51.8
BANNER GRAPHIC, INC. (NOT AVAILABLE)Manufacturing——3.0 yrs51.4
Bainbridge Auto SalesIndustrial——3.0 yrs51.4
Radiator ShopIndustrial——3.0 yrs51.4
BUZZI UNICEM USA, MIDWEST DIV. (CEMENT MANUFACTURING)Manufacturing——3.0 yrs51.4
CHIYODA USA CORP. (NOT AVAILABLE)Manufacturing——3.0 yrs51.3
CROWN EQUIPMENT CORP. (INDUSTRIAL TRUCK, TRACTOR, TRAILER, AND STACKER MACHINERY MANUFACTURING)Manufacturing——3.0 yrs51.3
CO-ALLIANCE, LLP (FERTILIZER (MIXING ONLY) MANUFACTURING)Manufacturing——3.0 yrs51.3
HEARTLAND AUTOMOTIVE, LLC (MOTOR VEHICLE SEATING AND INTERIOR TRIM MANUFACTURING)Manufacturing——3.0 yrs51.3

Every scored site in PUTNAM

All 35 sites, best first.

PUTNAM datacenter FAQ

How many datacenter sites are in PUTNAM?

35 scored datacenter candidate sites, averaging 52.6/100 DC Readiness. That is the 68th-most of 91 Indiana counties with five or more sites.

What is the highest-scoring datacenter site in PUTNAM?

OZ Putnam scores 59.0/100 DC Readiness, the highest of the 35 scored sites in PUTNAM (a greenfield site).

Does PUTNAM offer datacenter tax incentives?

Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

What is the natural-hazard risk in PUTNAM?

FEMA's National Risk Index rates PUTNAM as "Relatively Moderate" (score 32).

What are industrial electricity rates in PUTNAM?

Average industrial electricity is 8.78¢/kWh and commercial is 11.22¢/kWh in PUTNAM.

More in Indiana

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in PUTNAM, Indiana”, https://gridcensus.com/datacenter-sites/indiana/putnam (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for PUTNAM, Indiana is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.