Datacenter Sites in PORTER, Indiana
PORTER has 118 scored datacenter candidate sites averaging 53.1/100 DC Readiness, with a catalogued aggregate of 4,041 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.
118
Candidate sites
53.1/100
Avg DC Readiness
4,041 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
Site-selection context for PORTER
Yessales_tax_exemption
Datacenter tax incentive
15.80¢/kWh
Commercial electricity
7.94¢/kWh
Industrial electricity
8
Fiber providers
Low
Water stress
$9,579
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp
Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
By site type
Top datacenter sites in PORTER
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| Bailly | Brownfield | 138 kV | 641 MW | 3.8 yrs | 64.8 |
| DUNE ACRES | Substation-Adjacent | 345 kV | 600 MW | 3.8 yrs | 62.0 |
| TOWER ROAD | Substation-Adjacent | 345 kV | 600 MW | 3.8 yrs | 61.9 |
| BABCOCK | Substation-Adjacent | 345 kV | 600 MW | 3.8 yrs | 61.7 |
| EC Near Bailly | Greenfield | — | — | 3.0 yrs | 59.3 |
| UNKNOWN122715 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 56.4 |
| UNKNOWN122712 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 56.4 |
| UNKNOWN122722 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 56.3 |
| TAP138188 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 56.3 |
| UNKNOWN122718 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 56.3 |
| UNKNOWN128021 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 56.1 |
| UNKNOWN128023 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 56.1 |
| EC Near Bailly | Greenfield | — | — | 3.0 yrs | 56.1 |
| UNKNOWN122737 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 56.0 |
| UNKNOWN123031 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 56.0 |
| TAP138189 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 55.9 |
| Greenfield (DUNE ACRES - MICHIGAN CITY) | Greenfield | 345 kV | 600 MW | 3.8 yrs | 55.6 |
| EC Coal Porter County | Greenfield | — | — | 3.0 yrs | 55.6 |
| EC Near Bailly | Greenfield | — | — | 3.0 yrs | 53.8 |
| MONOSOL, LLC (PLASTICS PACKAGING FILM AND SHEET (INCLUDING LAMINATED) MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 52.9 |
| PRECOAT METALS (PAINT AND COATING MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 52.8 |
| UNITED STATES STEEL CORP., MIDWEST PLT. (ROLLED STEEL SHAPE MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 52.8 |
| CENTRAL COIL PROCESSING, LLC (ROLLED STEEL SHAPE MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 52.8 |
| AMERICAN IRON OXIDE, CO. (NOT AVAILABLE) | Manufacturing | — | — | 3.5 yrs | 52.8 |
| BETA STEEL CORP. (NOT AVAILABLE) | Manufacturing | — | — | 3.5 yrs | 52.7 |
PORTER datacenter FAQ
- How many datacenter sites are in PORTER?
- 118 scored datacenter candidate sites, averaging 53.1/100 DC Readiness.
- Does PORTER offer datacenter tax incentives?
- Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
- What is the natural-hazard risk in PORTER?
- FEMA's National Risk Index rates PORTER as "Relatively Moderate" (score 32).
- What are industrial electricity rates in PORTER?
- Average industrial electricity is 7.94¢/kWh and commercial is 15.80¢/kWh in PORTER.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for PORTER, Indiana. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.