Noble County has 116 scored datacenter candidate sites averaging 53.5/100 DC Readiness, with a catalogued aggregate of 1,700 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

Noble County, Indiana has 116 scored datacenter candidate sites averaging 53.5/100 DC Readiness, roughly in line with the Indiana average of 53.8. It ranks 17th of 91 Indiana counties by number of sites and 39th by average score. The top-scoring site is LIGONIER at 62.7/100.

116
Candidate sites
53.5/100
Avg DC Readiness
1,700 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Noble County

Site-selection context for Noble County

Yessales_tax_exemption
Datacenter tax incentive
14.32¢/kWh
Commercial electricity
8.47¢/kWh
Industrial electricity
10
Fiber providers
Low
Water stress
$9,064
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

How does Noble County compare with other counties in Indiana?

By number of scored sites, Noble County ranks 17th of the 91 Indiana counties with a county page, holding 1.3% of the state's 8,629 sites. Its average DC Readiness of 53.5/100 ranks 39th in the state and is roughly in line with the national average of 53.0. Nationally it has the 269th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 36 score 55 or higher.

What types of datacenter sites are in Noble County?

Manufacturing sites are the most common (88, 76% of the county's inventory), followed by substation-adjacent (17) and industrial (9). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Noble County?

Industrial electricity averages 8.47¢/kWh and commercial 14.32¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (32). WRI water stress is low. 10 fiber providers report service in the county. The climate runs 1,000 cooling degree days a year with a mean temperature of 52°F. Land is valued around $9,064 an acre.

By site type

Top datacenter sites in Noble County

Top datacenter sites in Noble County
SiteTypeVoltageCapacityQueue waitScore
LIGONIERSubstation-Adjacent138 kV100 MW3.0 yrs62.7
GUARDIANSubstation-Adjacent138 kV100 MW3.0 yrs62.6
UNKNOWN123174Substation-Adjacent138 kV100 MW3.0 yrs60.9
UNKNOWN122654Substation-Adjacent138 kV100 MW3.0 yrs60.4
UNKNOWN122655Substation-Adjacent138 kV100 MW3.0 yrs59.2
UNKNOWN151132Substation-Adjacent138 kV100 MW3.0 yrs58.7
ALBIONSubstation-Adjacent138 kV100 MW3.0 yrs58.7
TAP160237Substation-Adjacent138 kV100 MW3.0 yrs58.7
TAP160648Substation-Adjacent138 kV100 MW3.0 yrs58.4
LAOTTOSubstation-Adjacent138 kV100 MW3.0 yrs58.4
EGESubstation-Adjacent138 kV100 MW3.0 yrs58.2
KENDALLVILLESubstation-Adjacent138 kV100 MW3.0 yrs57.4
UNKNOWN123167Substation-Adjacent138 kV100 MW3.0 yrs57.4
TAP141268Substation-Adjacent138 kV100 MW3.0 yrs57.3
TAP160236Substation-Adjacent138 kV100 MW3.0 yrs57.3
BRC RUBBER & PLASTICS, INC. (RUBBER PRODUCT MANUFACTURING FOR MECHANICAL USE)Manufacturing——3.0 yrs56.5
JELD-WEN, INC. (METAL WINDOW AND DOOR MANUFACTURING)Manufacturing——3.0 yrs56.5
STAR OF THE WEST MILLING CO. (FLOUR MILLING)Manufacturing——3.0 yrs56.5
VIBRACOUSTIC NORTH AMERICA (GASOLINE ENGINE AND ENGINE PARTS MANUFACTURING)Manufacturing——3.0 yrs56.4
SUPERIOR SAMPLE CO., INC. (TRADEBINDING AND RELATED WORK)Manufacturing——3.0 yrs56.4
TENNECO, INC. (GASOLINE ENGINE AND ENGINE PARTS MANUFACTURING)Manufacturing——3.0 yrs56.4
MILLENNIUM INDUSTRIES (ALL OTHER MOTOR VEHICLE PARTS MANUFACTURING)Manufacturing——3.0 yrs56.4
SROUFE HEALTHCARE PRODUCTS, LLC (SURGICAL APPLIANCE AND SUPPLIES MANUFACTURING)Manufacturing——3.0 yrs56.4
RIVERSIDE MFG., INC. (OTHER ELECTRONIC COMPONENT MANUFACTURING)Manufacturing——3.0 yrs56.4
ROYAL IMPRINTS, INC. (OTHER COMMERCIAL PRINTING)Manufacturing——3.0 yrs56.4

Every scored site in Noble County

All 116 sites, best first.

Noble County datacenter FAQ

How many datacenter sites are in Noble County?

116 scored datacenter candidate sites, averaging 53.5/100 DC Readiness. That is the 17th-most of 91 Indiana counties with five or more sites.

What is the highest-scoring datacenter site in Noble County?

LIGONIER scores 62.7/100 DC Readiness, the highest of the 116 scored sites in Noble County (a substation-adjacent site).

Does Noble County offer datacenter tax incentives?

Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

What is the natural-hazard risk in Noble County?

FEMA's National Risk Index rates Noble County as "Relatively Moderate" (score 32).

What are industrial electricity rates in Noble County?

Average industrial electricity is 8.47¢/kWh and commercial is 14.32¢/kWh in Noble County.

More in Indiana

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Noble County, Indiana”, https://gridcensus.com/datacenter-sites/indiana/noble-county (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Noble County, Indiana is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.