Datacenter Sites in MARTIN, Indiana
MARTIN has 25 scored datacenter candidate sites averaging 51.7/100 DC Readiness, with a catalogued aggregate of 550 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.
25
Candidate sites
51.7/100
Avg DC Readiness
550 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
Site-selection context for MARTIN
Yessales_tax_exemption
Datacenter tax incentive
13.32¢/kWh
Commercial electricity
9.10¢/kWh
Industrial electricity
2
Fiber providers
Low
Water stress
$5,972
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp
Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
By site type
Top datacenter sites in MARTIN
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| EC Coal Martin County | Greenfield | — | — | 3.0 yrs | 55.6 |
| UNKNOWN125592 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 54.8 |
| UNKNOWN125590 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 54.6 |
| EC Coal Martin County | Greenfield | — | — | 3.0 yrs | 54.6 |
| TAP139960 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 54.3 |
| EC Coal Martin County | Greenfield | — | — | 3.0 yrs | 54.0 |
| TAP138352 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 53.6 |
| UNKNOWN127539 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 53.6 |
| UNKNOWN127540 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 53.5 |
| TAP160267 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 52.4 |
| UNKNOWN173482 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 52.4 |
| NAVAL SURFACE WARFARE CENTER, CRANE DIV. (INDUSTRIAL PATTERN MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 52.4 |
| CRANE ARMY AMMUNITION ACTIVITY (AMMUNITION (EXCEPT SMALL ARMS) MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 52.3 |
| PERFECT FIT INDUSTRIES, INC. (OTHER HOUSEHOLD TEXTILE PRODUCT MILLS) | Manufacturing | — | — | 3.5 yrs | 51.2 |
| LOUGHMILLER MACHINE TOOL & DESIGN (SPECIAL DIE AND TOOL, DIE SET, JIG, AND FIXTURE MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 51.2 |
| NATIONAL GYPSUM CO. (GYPSUM PRODUCT MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 51.2 |
| OLD PATHS TRACT SOCIETY (OTHER COMMERCIAL PRINTING) | Manufacturing | — | — | 3.5 yrs | 51.1 |
| UNITED STATES GYPSUM CO. (GYPSUM PRODUCT MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 50.3 |
| Mine Site | Former Mine | — | — | 3.8 yrs | 49.6 |
| Mine Site | Former Mine | — | — | 3.8 yrs | 48.5 |
| 504 Park Street | Industrial | — | — | 3.8 yrs | 48.5 |
| Former Nu Tap Tavern | Industrial | — | — | 3.8 yrs | 48.5 |
| Mine Site | Former Mine | — | — | 3.8 yrs | 48.4 |
| Mine Site | Former Mine | — | — | 3.8 yrs | 48.3 |
| Mine Site | Former Mine | — | — | 3.8 yrs | 48.2 |
MARTIN datacenter FAQ
- How many datacenter sites are in MARTIN?
- 25 scored datacenter candidate sites, averaging 51.7/100 DC Readiness.
- Does MARTIN offer datacenter tax incentives?
- Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
- What is the natural-hazard risk in MARTIN?
- FEMA's National Risk Index rates MARTIN as "Relatively Moderate" (score 32).
- What are industrial electricity rates in MARTIN?
- Average industrial electricity is 9.10¢/kWh and commercial is 13.32¢/kWh in MARTIN.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for MARTIN, Indiana. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.