Datacenter Sites in KOSCIUSKO, Indiana

KOSCIUSKO has 129 scored datacenter candidate sites averaging 52.5/100 DC Readiness, with a catalogued aggregate of 8,600 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

129
Candidate sites
52.5/100
Avg DC Readiness
8,600 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating

Site-selection context for KOSCIUSKO

Yessales_tax_exemption
Datacenter tax incentive
15.57¢/kWh
Commercial electricity
8.57¢/kWh
Industrial electricity
14
Fiber providers
Low
Water stress
$8,605
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

By site type

Top datacenter sites in KOSCIUSKO

Top datacenter sites in KOSCIUSKO
SiteTypeVoltageCapacityQueue waitScore
MERIDIANSubstation-Adjacent345 kV600 MW3.0 yrs71.0
LEESBURGSubstation-Adjacent345 kV600 MW3.0 yrs70.6
Greenfield (MERIDIAN - TWIN BRANCH (345 KV)Greenfield345 kV600 MW3.0 yrs67.7
Greenfield (HIPLE - LEESBURG)Greenfield345 kV600 MW3.0 yrs66.3
Greenfield (SORENSON - DUMONT)Greenfield765 kV1,000 MW3.0 yrs66.3
TAP138970Substation-Adjacent138 kV100 MW3.0 yrs65.4
Greenfield (MERIDIAN - TWIN BRANCH (345 KV)Greenfield345 kV600 MW3.0 yrs65.3
RABERSubstation-Adjacent138 kV100 MW3.0 yrs65.1
Greenfield (LEESBURG - BURR OAK)Greenfield345 kV600 MW3.0 yrs65.1
Greenfield (MERIDIAN - TWIN BRANCH (345 KV)Greenfield345 kV600 MW3.0 yrs64.8
Greenfield (SORENSON - DUMONT)Greenfield765 kV1,000 MW3.0 yrs64.7
UNKNOWN122870Substation-Adjacent138 kV100 MW3.0 yrs64.4
Greenfield (DEEDSVILLE 345KV - LEESBURG)Greenfield345 kV600 MW3.0 yrs64.4
Greenfield (SORENSON - DUMONT)Greenfield765 kV1,000 MW3.0 yrs62.1
UNKNOWN122871Substation-Adjacent138 kV100 MW3.0 yrs60.2
Greenfield (UNKNOWN122873 - LEESBURG)Greenfield138 kV100 MW3.0 yrs59.8
Greenfield (UNKNOWN122873 - RABER)Greenfield138 kV100 MW3.0 yrs59.6
Greenfield (UNKNOWN122871 - LEESBURG)Greenfield138 kV100 MW3.0 yrs59.5
UNKNOWN122873Substation-Adjacent138 kV100 MW3.0 yrs53.9
LAND O' LAKES PURINA FEED, LLC (OTHER ANIMAL FOOD MANUFACTURING)Manufacturing52.5
BROCK GRAIN SYSTEMS (NOT AVAILABLE)Manufacturing52.4
DEKKO TECHNOLOGIES, INC. (HEATING EQUIPMENT (EXCEPT WARM AIR FURNACES) MANUFACTURING)Manufacturing52.3
CTB, INC. (FARM MACHINERY AND EQUIPMENT MANUFACTURING)Manufacturing52.3
SELLERS MFG., INC. (SECONDARY SMELTING AND ALLOYING OF ALUMINUM)Manufacturing52.3
GROUP DEKKO, INC. (ALL OTHER PLASTICS PRODUCT MANUFACTURING)Manufacturing52.3

KOSCIUSKO datacenter FAQ

How many datacenter sites are in KOSCIUSKO?
129 scored datacenter candidate sites, averaging 52.5/100 DC Readiness.
Does KOSCIUSKO offer datacenter tax incentives?
Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
What is the natural-hazard risk in KOSCIUSKO?
FEMA's National Risk Index rates KOSCIUSKO as "Relatively Moderate" (score 32).
What are industrial electricity rates in KOSCIUSKO?
Average industrial electricity is 8.57¢/kWh and commercial is 15.57¢/kWh in KOSCIUSKO.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for KOSCIUSKO, Indiana. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.