Knox County has 83 scored datacenter candidate sites averaging 50.8/100 DC Readiness, with a catalogued aggregate of 1,400 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.
83
Candidate sites
50.8/100
Avg DC Readiness
1,400 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
Site-selection context for Knox County
Yessales_tax_exemption
Datacenter tax incentive
12.03¢/kWh
Commercial electricity
8.94¢/kWh
Industrial electricity
4
Fiber providers
Low
Water stress
$8,068
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp
Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
By site type
Top datacenter sites in Knox County
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| WHEATLAND STATION | Substation-Adjacent | 345 kV | 600 MW | 3.8 yrs | 60.6 |
| OZ Knox | Greenfield | — | — | 3.0 yrs | 57.2 |
| EC Near Edwardsport | Greenfield | — | — | 3.0 yrs | 55.8 |
| EC Coal Knox County | Greenfield | — | — | 3.0 yrs | 55.7 |
| EC Coal Knox County | Greenfield | — | — | 3.0 yrs | 55.1 |
| EC Near Edwardsport | Greenfield | — | — | 3.0 yrs | 54.9 |
| UNKNOWN125549 | Substation-Adjacent | 161 kV | 100 MW | 3.8 yrs | 54.9 |
| EC Near Edwardsport | Greenfield | — | — | 3.0 yrs | 54.9 |
| UNKNOWN125552 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 54.8 |
| UNKNOWN125548 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 54.8 |
| UNKNOWN160096 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 54.8 |
| TAP169398 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 54.7 |
| EC Coal Knox County | Greenfield | — | — | 3.0 yrs | 54.6 |
| UNKNOWN156857 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 54.5 |
| EC Near Edwardsport | Greenfield | — | — | 3.0 yrs | 54.5 |
| EC Near Edwardsport | Greenfield | — | — | 3.0 yrs | 54.4 |
| EC Near Edwardsport | Greenfield | — | — | 3.0 yrs | 54.4 |
| EC Coal Knox County | Greenfield | — | — | 3.0 yrs | 53.7 |
| EC Coal Knox County | Greenfield | — | — | 3.0 yrs | 53.2 |
| UNKNOWN127991 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 52.4 |
| UNKNOWN127993 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 52.4 |
| TAP160291 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 52.4 |
| UNKNOWN158596 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 52.2 |
| DUMES, INC. (SECONDARY SMELTING, REFINING, AND ALLOYING OF NONFERROUS METAL (EXCEPT COPPER AND ALUMINUM)) | Manufacturing | — | — | 3.5 yrs | 51.2 |
| BABB LUMBER CO., INC. (WOOD PRESERVATION) | Manufacturing | — | — | 3.5 yrs | 51.2 |
Knox County datacenter FAQ
- How many datacenter sites are in Knox County?
- 83 scored datacenter candidate sites, averaging 50.8/100 DC Readiness.
- Does Knox County offer datacenter tax incentives?
- Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
- What is the natural-hazard risk in Knox County?
- FEMA's National Risk Index rates Knox County as "Relatively Moderate" (score 32).
- What are industrial electricity rates in Knox County?
- Average industrial electricity is 8.94¢/kWh and commercial is 12.03¢/kWh in Knox County.