Skip to content
Gridcensus

Datacenter Sites in JAY, Indiana

JAY has 35 scored datacenter candidate sites averaging 50.4/100 DC Readiness, with a catalogued aggregate of 300 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

35
Candidate sites
50.4/100
Avg DC Readiness
300 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in JAY

Site-selection context for JAY

Yessales_tax_exemption
Datacenter tax incentive
11.90¢/kWh
Commercial electricity
8.44¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$10,478
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

By site type

Top datacenter sites in JAY

Top datacenter sites in JAY
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN124048Substation-Adjacent138 kV100 MW3.8 yrs53.9
UNKNOWN124110Substation-Adjacent138 kV100 MW3.8 yrs53.9
TYSON FOODS, INC., MEXICAN ORIGINAL (TORTILLA MANUFACTURING)Manufacturing——3.5 yrs50.8
S.D.P. MANUFACTURING, INC. (MACHINE SHOPS)Manufacturing——3.5 yrs50.8
F.C.C. INDIANA, INC. (MOTOR VEHICLE TRANSMISSION AND POWER TRAIN PARTS MANUFACTURING)Manufacturing——3.5 yrs50.8
PENNVILLE CUSTOM CABINETRY (WOOD KITCHEN CABINET AND COUNTERTOP MANUFACTURING)Manufacturing——3.5 yrs50.8
FULLENKAMP MACHINE & MFG., INC. (SPECIAL DIE AND TOOL, DIE SET, JIG, AND FIXTURE MANUFACTURING)Manufacturing——3.5 yrs50.8
SAINT-GOBAIN CONTAINERS, INC. (GLASS CONTAINER MANUFACTURING)Manufacturing——3.5 yrs50.8
ALPHABET, INC., PORTLAND DIV. (OTHER ELECTRONIC COMPONENT MANUFACTURING)Manufacturing——3.5 yrs50.8
PATRIOT PAINT CO., INC. (PAINT AND COATING MANUFACTURING)Manufacturing——3.5 yrs50.8
FISHER PACKING CO. (MEAT PROCESSED FROM CARCASSES)Manufacturing——3.5 yrs50.8
PIER-MAC PLASTICS, INC. (ALL OTHER PLASTICS PRODUCT MANUFACTURING)Manufacturing——3.5 yrs50.8
DAYTON PROGRESS CORP. (MACHINE SHOPS)Manufacturing——3.5 yrs50.8
GRAPHIC PRINTING CO., INC. (NOT AVAILABLE)Manufacturing——3.5 yrs50.8
MOSEY MFG. CO., INC. (ALL OTHER MOTOR VEHICLE PARTS MANUFACTURING)Manufacturing——3.5 yrs50.8
PORTLAND FORGE (IRON AND STEEL MILLS)Manufacturing——3.5 yrs50.8
W & M MFG., INC. (ELECTROPLATING, PLATING, POLISHING, ANODIZING AND COLORING)Manufacturing——3.5 yrs50.8
JOYCE DAYTON CORP., PORTLAND DIV. (MACHINE SHOPS)Manufacturing——3.5 yrs50.7
PERFORMANCE TOOL, INC. (SPECIAL DIE AND TOOL, DIE SET, JIG, AND FIXTURE MANUFACTURING)Manufacturing——3.5 yrs50.7
JAY PRODUCTS (ALL OTHER MOTOR VEHICLE PARTS MANUFACTURING)Manufacturing——3.5 yrs50.7
HARTZELL FAN, INC. (INDUSTRIAL AND COMMERCIAL FAN AND BLOWER MANUFACTURING)Manufacturing——3.5 yrs50.7
COCA-COLA BOTTLING CO. OF PORTLAND, INC. (FLAVORING SYRUP AND CONCENTRATE MANUFACTURING)Manufacturing——3.5 yrs50.7
MOSER ENGINEERING, INC. (MOTOR VEHICLE TRANSMISSION AND POWER TRAIN PARTS MANUFACTURING)Manufacturing——3.5 yrs50.7
MARS PET CARE CO. (DOG AND CAT FOOD MANUFACTURING)Manufacturing——3.5 yrs50.7
ACCELERATED CURING, INC. (PAINT AND COATING MANUFACTURING)Manufacturing——3.5 yrs50.7

JAY datacenter FAQ

How many datacenter sites are in JAY?
35 scored datacenter candidate sites, averaging 50.4/100 DC Readiness.
Does JAY offer datacenter tax incentives?
Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
What is the natural-hazard risk in JAY?
FEMA's National Risk Index rates JAY as "Relatively Moderate" (score 32).
What are industrial electricity rates in JAY?
Average industrial electricity is 8.44¢/kWh and commercial is 11.90¢/kWh in JAY.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for JAY, Indiana. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.