JACKSON has 50 scored datacenter candidate sites averaging 54.5/100 DC Readiness, with a catalogued aggregate of 700 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

JACKSON, Indiana has 50 scored datacenter candidate sites averaging 54.5/100 DC Readiness, roughly in line with the Indiana average of 53.8. It ranks 54th of 91 Indiana counties by number of sites and 23rd by average score. The top-scoring site is Substation-Adjacent site · d0c0cd47 at 60.8/100.

50
Candidate sites
54.5/100
Avg DC Readiness
700 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in JACKSON

Site-selection context for JACKSON

Yessales_tax_exemption
Datacenter tax incentive
12.34¢/kWh
Commercial electricity
9.41¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$6,958
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

How does JACKSON compare with other counties in Indiana?

By number of scored sites, JACKSON ranks 54th of the 91 Indiana counties with a county page, holding 0.6% of the state's 8,629 sites. Its average DC Readiness of 54.5/100 ranks 23rd in the state and is roughly in line with the national average of 53.0. Nationally it has the 757th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 8 score 55 or higher.

What types of datacenter sites are in JACKSON?

Manufacturing sites are the most common (41, 82% of the county's inventory), followed by substation-adjacent (8) and industrial (1). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in JACKSON?

Industrial electricity averages 9.41¢/kWh and commercial 12.34¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (32). WRI water stress is low. 5 fiber providers report service in the county. The climate runs 1,000 cooling degree days a year with a mean temperature of 52°F. Land is valued around $6,958 an acre.

By site type

Top datacenter sites in JACKSON

Top datacenter sites in JACKSON
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN125319Substation-Adjacent138 kV100 MW3.0 yrs60.8
SEYMOURSubstation-Adjacent138 kV100 MW3.0 yrs60.8
TAP169428Substation-Adjacent138 kV100 MW3.0 yrs60.7
UNKNOWN128073Substation-Adjacent138 kV100 MW3.0 yrs59.8
UNKNOWN128072Substation-Adjacent138 kV100 MW3.0 yrs59.8
TAP140172Substation-Adjacent138 kV100 MW3.0 yrs59.2
UNKNOWN125508Substation-Adjacent69 kV50 MW3.0 yrs56.2
UNKNOWN125507Substation-Adjacent69 kV50 MW3.0 yrs55.9
AISIN U.S.A. MFG., INC. (AUTOMOBILE MANUFACTURING)Manufacturing——3.0 yrs54.5
JLM PHARMATECH, INC. (PHARMACEUTICAL PREPARATION MANUFACTURING)Manufacturing——3.0 yrs54.5
CUMMINS INDUSTRIAL CENTER (GASOLINE ENGINE AND ENGINE PARTS MANUFACTURING)Manufacturing——3.0 yrs54.5
84 LUMBER CO. (TRUSS MANUFACTURING)Manufacturing——3.0 yrs54.5
SEYMOUR TUBING, INC. (IRON AND STEEL PIPE AND TUBE MANUFACTURING FROM PURCHASED STEEL)Manufacturing——3.0 yrs54.5
SEYMOUR MFG. CO., INC. (MACHINE TOOL (METAL CUTTING TYPES) MANUFACTURING)Manufacturing——3.0 yrs54.5
EXCEL MFG., INC. (MACHINE SHOPS)Manufacturing——3.0 yrs54.5
CROWN SUPPLY CO., INC. (WOOD KITCHEN CABINET AND COUNTERTOP MANUFACTURING)Manufacturing——3.0 yrs54.5
CUMMINS-KOMATSU ENGINE CO. (GASOLINE ENGINE AND ENGINE PARTS MANUFACTURING)Manufacturing——3.0 yrs54.5
KOBELCO METAL POWDER OF AMERICA, INC. (SECONDARY SMELTING, REFINING, AND ALLOYING OF NONFERROUS METAL (EXCEPT COPPER AND ALUMINUM))Manufacturing——3.0 yrs54.5
KING INDUSTRIAL CORP. (SPECIAL DIE AND TOOL, DIE SET, JIG, AND FIXTURE MANUFACTURING)Manufacturing——3.0 yrs54.4
HOME PRODUCTS INTERNATIONAL, INC. (NOT AVAILABLE)Manufacturing——3.0 yrs54.4
TRIBUNE, THE (OTHER COMMERCIAL PRINTING)Manufacturing——3.0 yrs54.4
GRAESSLE-MERCER CO., INC. (OTHER COMMERCIAL PRINTING)Manufacturing——3.0 yrs54.4
ISCO SYSTEMS OF NORTH AMERICA (WOOD CONTAINER AND PALLET MANUFACTURING)Manufacturing——3.0 yrs53.6
JACKSON-JENNINGS CO-OP (H Q) (NOT AVAILABLE)Manufacturing——3.0 yrs53.6
PREFERRED TOOL CO., INC. (INDUSTRIAL MOLD MANUFACTURING)Manufacturing——3.0 yrs53.5

Every scored site in JACKSON

All 50 sites, best first.

JACKSON datacenter FAQ

How many datacenter sites are in JACKSON?

50 scored datacenter candidate sites, averaging 54.5/100 DC Readiness. That is the 54th-most of 91 Indiana counties with five or more sites.

What is the highest-scoring datacenter site in JACKSON?

Substation-Adjacent site · d0c0cd47 scores 60.8/100 DC Readiness, the highest of the 50 scored sites in JACKSON (a substation-adjacent site).

Does JACKSON offer datacenter tax incentives?

Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

What is the natural-hazard risk in JACKSON?

FEMA's National Risk Index rates JACKSON as "Relatively Moderate" (score 32).

What are industrial electricity rates in JACKSON?

Average industrial electricity is 9.41¢/kWh and commercial is 12.34¢/kWh in JACKSON.

More in Indiana

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in JACKSON, Indiana”, https://gridcensus.com/datacenter-sites/indiana/jackson (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for JACKSON, Indiana is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.