Howard County has 96 scored datacenter candidate sites averaging 51.9/100 DC Readiness, with a catalogued aggregate of 2,800 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

Howard County, Indiana has 96 scored datacenter candidate sites averaging 51.9/100 DC Readiness, roughly in line with the Indiana average of 53.8. It ranks 25th of 91 Indiana counties by number of sites and 77th by average score. The top-scoring site is GREENTOWN at 66.0/100.

96
Candidate sites
51.9/100
Avg DC Readiness
2,800 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Howard County

Site-selection context for Howard County

Yessales_tax_exemption
Datacenter tax incentive
10.22¢/kWh
Commercial electricity
7.96¢/kWh
Industrial electricity
9
Fiber providers
Low
Water stress
$5,875
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

How does Howard County compare with other counties in Indiana?

By number of scored sites, Howard County ranks 25th of the 91 Indiana counties with a county page, holding 1.1% of the state's 8,629 sites. Its average DC Readiness of 51.9/100 ranks 77th in the state and is roughly in line with the national average of 53.0. Nationally it has the 341st-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 9 score 55 or higher.

What types of datacenter sites are in Howard County?

Manufacturing sites are the most common (44, 46% of the county's inventory), followed by industrial (40) and substation-adjacent (7). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Howard County?

Industrial electricity averages 7.96¢/kWh and commercial 10.22¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (32). WRI water stress is low. 9 fiber providers report service in the county. The climate runs 1,000 cooling degree days a year with a mean temperature of 52°F. Land is valued around $5,875 an acre.

By site type

Top datacenter sites in Howard County

Top datacenter sites in Howard County
SiteTypeVoltageCapacityQueue waitScore
GREENTOWNSubstation-Adjacent765 kV1,000 MW3.0 yrs66.0
Kokomo Wind Farm (Continental Steel )Brownfield—0 MW3.0 yrs63.9
KOKOMO HIGHLAND PARKSubstation-Adjacent230 kV300 MW3.0 yrs61.6
UNKNOWN123983Substation-Adjacent230 kV300 MW3.0 yrs60.7
KOKOMO WEBSTER STREETSubstation-Adjacent230 kV300 MW3.0 yrs60.7
NEW LONDONSubstation-Adjacent230 kV300 MW3.0 yrs60.6
UNKNOWN128127Substation-Adjacent138 kV100 MW3.0 yrs57.7
TAP138980Substation-Adjacent138 kV100 MW3.0 yrs57.7
OZ HowardGreenfield——3.0 yrs55.5
Greenfield (GREENTOWN - PERU)Greenfield230 kV300 MW3.0 yrs54.2
HEWITT MOLDING CO. (INDUSTRIAL MOLD MANUFACTURING)Manufacturing——3.0 yrs51.6
HOLLINGSWORTH LUMBER (SAWMILLS)Manufacturing——3.0 yrs51.5
CHRYSLER, LLC, KOKOMO TRANSMISSION PLT. (MECHANICAL POWER TRANSMISSION EQUIPMENT MANUFACTURING)Manufacturing——3.0 yrs51.5
Former Russiaville RestaurantIndustrial——3.0 yrs51.5
DELPHI ELECTRONICS & SAFETY (AUDIO AND VIDEO EQUIPMENT MANUFACTURING)Manufacturing——3.0 yrs51.5
CAVERT WIRE CO., INC. (NOT AVAILABLE)Manufacturing——3.0 yrs51.5
FUNCTIONAL DEVICES, INC. (INSTRUMENTS & RELATED PRODUCTS MFG FOR MEASURING, DISPLAYING, CONTROLLING INDUSTRIAL PROCESS VARIABLES)Manufacturing——3.0 yrs51.5
Former Continental Baking CompanyIndustrial——3.0 yrs51.5
CSI ELECTRONICS (BARE PRINTED CIRCUIT BOARD MANUFACTURING)Manufacturing——3.0 yrs51.4
CHRYSLER, LLC, KOKOMO CASTING OPERS. (ALUMINUM DIE-CASTING FOUNDRIES)Manufacturing——3.0 yrs51.4
FDL, INC. (WOOD OFFICE FURNITURE MANUFACTURING)Manufacturing——3.0 yrs51.4
Hulce's SupermarketIndustrial——3.0 yrs51.4
KOKOMO SPRING CO., INC. (SPRING (HEAVY GAUGE) MANUFACTURING)Manufacturing——3.0 yrs51.4
STEPHENS MACHINE, INC. (MACHINE SHOPS)Manufacturing——3.0 yrs51.4
BONA VISTA PROGRAMS, INC. (ALL OTHER PLASTICS PRODUCT MANUFACTURING)Manufacturing——3.0 yrs51.4

Every scored site in Howard County

All 96 sites, best first.

Howard County datacenter FAQ

How many datacenter sites are in Howard County?

96 scored datacenter candidate sites, averaging 51.9/100 DC Readiness. That is the 25th-most of 91 Indiana counties with five or more sites.

What is the highest-scoring datacenter site in Howard County?

GREENTOWN scores 66.0/100 DC Readiness, the highest of the 96 scored sites in Howard County (a substation-adjacent site).

Does Howard County offer datacenter tax incentives?

Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

What is the natural-hazard risk in Howard County?

FEMA's National Risk Index rates Howard County as "Relatively Moderate" (score 32).

What are industrial electricity rates in Howard County?

Average industrial electricity is 7.96¢/kWh and commercial is 10.22¢/kWh in Howard County.

More in Indiana

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Howard County, Indiana”, https://gridcensus.com/datacenter-sites/indiana/howard-county (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Howard County, Indiana is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.