Datacenter Sites in HARRISON, Indiana
HARRISON has 41 scored datacenter candidate sites averaging 53.3/100 DC Readiness, with a catalogued aggregate of 1,150 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.
41
Candidate sites
53.3/100
Avg DC Readiness
1,150 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
Site-selection context for HARRISON
Yessales_tax_exemption
Datacenter tax incentive
12.07¢/kWh
Commercial electricity
10.17¢/kWh
Industrial electricity
3
Fiber providers
Low
Water stress
$5,877
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp
Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
By site type
Top datacenter sites in HARRISON
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| HE RAMSEY | Substation-Adjacent | 345 kV | 600 MW | 3.8 yrs | 62.6 |
| EC Coal Harrison County | Greenfield | — | — | 3.0 yrs | 56.3 |
| UNKNOWN130728 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 56.2 |
| TAP138405 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 56.2 |
| UNKNOWN169413 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 55.8 |
| TAP169421 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 54.8 |
| UNKNOWN125454 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 54.8 |
| CORYDON | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 54.8 |
| TAP169420 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 54.7 |
| TAP169423 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 54.6 |
| TAP140174 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 54.4 |
| UNKNOWN169416 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 54.3 |
| TAP169415 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 54.2 |
| CHILD CRAFT INDUSTRIES, INC. (NONUPHOLSTERED WOOD HOUSEHOLD FURNITURE MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 53.5 |
| DARAMIC, INC. (ALL OTHER RUBBER PRODUCT MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 53.5 |
| BLUE RIVER INDUSTRIES (ALL OTHER MISCELLANEOUS WOOD PRODUCT MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 53.5 |
| TYSON FOODS, INC. (POULTRY PROCESSING) | Manufacturing | — | — | 3.5 yrs | 53.5 |
| O'BANNON PUBLISHING CO., INC. (OTHER COMMERCIAL PRINTING) | Manufacturing | — | — | 3.5 yrs | 53.5 |
| LUCAS OIL PRODUCTS, INC. (NOT AVAILABLE) | Manufacturing | — | — | 3.5 yrs | 53.5 |
| THORN-ORWICK (OTHER CONCRETE PRODUCT MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 53.5 |
| ICON METAL FORMING, LLC (METAL STAMPING) | Manufacturing | — | — | 3.5 yrs | 53.5 |
| SCHMIDT CABINET CO., INC. (WOOD KITCHEN CABINET AND COUNTERTOP MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 53.4 |
| CORYDON STONE & ASPHALT, INC. (CUT STONE AND STONE PRODUCT MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 53.4 |
| CORYDON MACHINE TOOL CO., INC. (SPECIAL DIE AND TOOL, DIE SET, JIG, AND FIXTURE MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 53.4 |
| ROMAN MARBLENE CO., INC. (NOT AVAILABLE) | Manufacturing | — | — | 3.5 yrs | 53.3 |
HARRISON datacenter FAQ
- How many datacenter sites are in HARRISON?
- 41 scored datacenter candidate sites, averaging 53.3/100 DC Readiness.
- Does HARRISON offer datacenter tax incentives?
- Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
- What is the natural-hazard risk in HARRISON?
- FEMA's National Risk Index rates HARRISON as "Relatively Moderate" (score 32).
- What are industrial electricity rates in HARRISON?
- Average industrial electricity is 10.17¢/kWh and commercial is 12.07¢/kWh in HARRISON.
Dataset updated . Screening estimates derived from public data sources.