Skip to content
Gridcensus

Datacenter Sites in FAYETTE, Indiana

FAYETTE has 47 scored datacenter candidate sites averaging 52.7/100 DC Readiness, with a catalogued aggregate of 650 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

47
Candidate sites
52.7/100
Avg DC Readiness
650 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in FAYETTE

Site-selection context for FAYETTE

Yessales_tax_exemption
Datacenter tax incentive
12.15¢/kWh
Commercial electricity
8.34¢/kWh
Industrial electricity
6
Fiber providers
Low
Water stress
$9,205
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

By site type

Top datacenter sites in FAYETTE

Top datacenter sites in FAYETTE
SiteTypeVoltageCapacityQueue waitScore
EC Near ConnersvilleGreenfield——3.0 yrs58.4
UNKNOWN125259Substation-Adjacent138 kV100 MW3.8 yrs57.4
EC Near ConnersvilleGreenfield——3.0 yrs56.5
EC Near ConnersvilleGreenfield——3.0 yrs56.3
EC Near ConnersvilleGreenfield——3.0 yrs55.6
EC Near ConnersvilleGreenfield——3.0 yrs55.4
EC Near ConnersvilleGreenfield——3.0 yrs55.3
EC Near ConnersvilleGreenfield——3.0 yrs55.3
EC Near ConnersvilleGreenfield——3.0 yrs54.9
EC Near ConnersvilleGreenfield——3.0 yrs54.8
UNKNOWN125247Substation-Adjacent69 kV50 MW3.8 yrs53.5
UNKNOWN155716Substation-Adjacent69 kV50 MW3.8 yrs53.4
UNKNOWN125262Substation-Adjacent69 kV50 MW3.8 yrs53.4
TAP140271Substation-Adjacent69 kV50 MW3.8 yrs53.4
TAP155720Substation-Adjacent69 kV50 MW3.8 yrs53.4
UNKNOWN125261Substation-Adjacent69 kV50 MW3.8 yrs53.4
UNKNOWN124879Substation-Adjacent69 kV50 MW3.8 yrs53.2
UNKNOWN157766Substation-Adjacent69 kV50 MW3.8 yrs53.2
UNKNOWN125256Substation-Adjacent69 kV50 MW3.8 yrs53.0
TAP155721Substation-Adjacent69 kV50 MW3.8 yrs52.9
TAP155722Substation-Adjacent69 kV50 MW3.8 yrs52.5
COMMERCIAL PRINTING SERVICES (OTHER COMMERCIAL PRINTING)Manufacturing——3.5 yrs52.2
ACHIEVA RESOURCES, INC. (ALL OTHER PLASTICS PRODUCT MANUFACTURING)Manufacturing——3.5 yrs52.2
H & E MACHINE (MACHINE SHOPS)Manufacturing——3.5 yrs52.2
CROWN EQUIPMENT CORP. (NOT AVAILABLE)Manufacturing——3.5 yrs52.2

FAYETTE datacenter FAQ

How many datacenter sites are in FAYETTE?
47 scored datacenter candidate sites, averaging 52.7/100 DC Readiness.
Does FAYETTE offer datacenter tax incentives?
Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
What is the natural-hazard risk in FAYETTE?
FEMA's National Risk Index rates FAYETTE as "Relatively Moderate" (score 32).
What are industrial electricity rates in FAYETTE?
Average industrial electricity is 8.34¢/kWh and commercial is 12.15¢/kWh in FAYETTE.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for FAYETTE, Indiana. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.