Datacenter Sites in DEARBORN, Indiana

DEARBORN has 48 scored datacenter candidate sites averaging 56.2/100 DC Readiness, with a catalogued aggregate of 1,950 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

DEARBORN, Indiana has 48 scored datacenter candidate sites averaging 56.2/100 DC Readiness, roughly in line with the Indiana average of 53.8. It ranks 56th of 91 Indiana counties by number of sites and 8th by average score. The top-scoring site is Substation-Adjacent site · 9ddda36b at 71.1/100.

48
Candidate sites
56.2/100
Avg DC Readiness
1,950 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in DEARBORN

Site-selection context for DEARBORN

Yessales_tax_exemption
Datacenter tax incentive
12.03¢/kWh
Commercial electricity
8.31¢/kWh
Industrial electricity
11
Fiber providers
Low
Water stress
$6,735
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

How does DEARBORN compare with other counties in Indiana?

By number of scored sites, DEARBORN ranks 56th of the 91 Indiana counties with a county page, holding 0.6% of the state's 8,629 sites. Its average DC Readiness of 56.2/100 ranks 8th in the state and is roughly in line with the national average of 53.0. Nationally it has the 793rd-largest site inventory of 2,964 counties with five or more sites. One site scores 70 or higher and 18 score 55 or higher.

What types of datacenter sites are in DEARBORN?

Manufacturing sites are the most common (19, 40% of the county's inventory), followed by substation-adjacent (10) and greenfield (9). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in DEARBORN?

Industrial electricity averages 8.31¢/kWh and commercial 12.03¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (32). WRI water stress is low. 11 fiber providers report service in the county. The climate runs 1,000 cooling degree days a year with a mean temperature of 52°F. Land is valued around $6,735 an acre.

By site type

Top datacenter sites in DEARBORN

Top datacenter sites in DEARBORN
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN124886Substation-Adjacent345 kV600 MW3.0 yrs71.1
MIAMISubstation-Adjacent345 kV600 MW5.2 yrs68.3
EC Near Tanners CreekGreenfield——3.0 yrs60.0
UNKNOWN137579Substation-Adjacent138 kV100 MW3.0 yrs59.9
TAP173564Substation-Adjacent138 kV100 MW3.0 yrs59.8
UNKNOWN125321Substation-Adjacent138 kV100 MW3.0 yrs59.7
EC Near Tanners CreekGreenfield——3.0 yrs59.7
EC Near Tanners CreekGreenfield——3.0 yrs59.6
TAP137561Substation-Adjacent138 kV100 MW3.0 yrs59.6
EC Near Tanners CreekGreenfield——3.0 yrs59.6
EC Near Tanners CreekGreenfield——3.0 yrs59.4
UNKNOWN113754Substation-Adjacent138 kV100 MW5.2 yrs59.2
EC Coal Dearborn CountyGreenfield——3.0 yrs58.9
UNKNOWN173565Substation-Adjacent138 kV100 MW3.0 yrs58.8
HUBBELLSubstation-Adjacent138 kV100 MW3.0 yrs58.8
EC Coal Dearborn CountyGreenfield——3.0 yrs58.1
EC Near Tanners CreekGreenfield——3.0 yrs57.4
TAP137562Substation-Adjacent69 kV50 MW3.0 yrs55.4
Maple StreetIndustrial——3.0 yrs54.8
Durbin PlazaIndustrial——3.0 yrs54.8
Durbin PlazaIndustrial——3.0 yrs54.8
REGISTER PUBLICATIONS (OTHER COMMERCIAL PRINTING)Manufacturing——3.0 yrs54.8
BATESVILLE PRODUCTS, INC. (ALUMINUM FOUNDRIES (EXCEPT DIE-CASTING))Manufacturing——3.0 yrs54.8
Former Service StationIndustrial——3.0 yrs54.7
PERNOD RICARD U.S.A. (ETHYL ALCOHOL MANUFACTURING)Manufacturing——3.0 yrs54.7

Every scored site in DEARBORN

All 48 sites, best first.

DEARBORN datacenter FAQ

How many datacenter sites are in DEARBORN?

48 scored datacenter candidate sites, averaging 56.2/100 DC Readiness. That is the 56th-most of 91 Indiana counties with five or more sites.

What is the highest-scoring datacenter site in DEARBORN?

Substation-Adjacent site · 9ddda36b scores 71.1/100 DC Readiness, the highest of the 48 scored sites in DEARBORN (a substation-adjacent site).

Does DEARBORN offer datacenter tax incentives?

Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

What is the natural-hazard risk in DEARBORN?

FEMA's National Risk Index rates DEARBORN as "Relatively Moderate" (score 32).

What are industrial electricity rates in DEARBORN?

Average industrial electricity is 8.31¢/kWh and commercial is 12.03¢/kWh in DEARBORN.

More in Indiana

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in DEARBORN, Indiana”, https://gridcensus.com/datacenter-sites/indiana/dearborn (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for DEARBORN, Indiana is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.