Skip to content
Gridcensus

Datacenter Sites in CASS, Indiana

CASS has 74 scored datacenter candidate sites averaging 50.7/100 DC Readiness, with a catalogued aggregate of 900 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

74
Candidate sites
50.7/100
Avg DC Readiness
900 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in CASS

Site-selection context for CASS

Yessales_tax_exemption
Datacenter tax incentive
11.23¢/kWh
Commercial electricity
7.64¢/kWh
Industrial electricity
7
Fiber providers
Low
Water stress
$8,138
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

By site type

Top datacenter sites in CASS

Top datacenter sites in CASS
SiteTypeVoltageCapacityQueue waitScore
WALTONSubstation-Adjacent345 kV600 MW3.8 yrs60.7
UNKNOWN123991Substation-Adjacent230 kV300 MW3.8 yrs58.8
EC Coal Cass CountyGreenfield——3.0 yrs56.4
EC Coal Cass CountyGreenfield——3.0 yrs55.4
EC Coal Cass CountyGreenfield——3.0 yrs53.9
EC Coal Cass CountyGreenfield——3.0 yrs52.5
EC Coal Cass CountyGreenfield——3.0 yrs52.3
MATTHEW WARREN, DIVISION OF MW IND. (SPRING (HEAVY GAUGE) MANUFACTURING)Manufacturing——3.5 yrs51.3
TYSON FRESH MEATS, INC. (MEAT PROCESSED FROM CARCASSES)Manufacturing——3.5 yrs51.3
HOPPER DEVELOPMENT, INC. (INDUSTRIAL MOLD MANUFACTURING)Manufacturing——3.5 yrs51.3
COLE HARDWOOD, INC. (SAWMILLS)Manufacturing——3.5 yrs51.3
MYERS SPRING CO., INC. (SPRING (HEAVY GAUGE) MANUFACTURING)Manufacturing——3.5 yrs51.3
CO-TRONICS, INC. (ALL OTHER PLASTICS PRODUCT MANUFACTURING)Manufacturing——3.5 yrs51.3
VALLEY TOOL & DIE STAMPING, INC. (METAL STAMPING)Manufacturing——3.5 yrs51.3
SUMMIT EMS (BARE PRINTED CIRCUIT BOARD MANUFACTURING)Manufacturing——3.5 yrs51.3
ENGINEERING & INDUSTRIAL SERVICE (ALL OTHER MISCELLANEOUS FABRICATED METAL PRODUCT MANUFACTURING)Manufacturing——3.5 yrs51.3
CARLISLE INDUSTRIAL FRICTION (ALL OTHER MISCELLANEOUS CHEMICAL PRODUCT AND PREPARATION MANUFACTURING)Manufacturing——3.5 yrs51.3
KAUFFMAN ENGINEERING, INC. (OTHER ELECTRONIC COMPONENT MANUFACTURING)Manufacturing——3.5 yrs51.3
LOGAN STAMPINGS, INC. (METAL STAMPING)Manufacturing——3.5 yrs51.3
PEAK COMMUNITY SERVICES (ALL OTHER PLASTICS PRODUCT MANUFACTURING)Manufacturing——3.5 yrs51.3
LOGANSPORT MATSUMOTO CO., INC. (CUTTING TOOL AND MACHINE TOOL ACCESSORY MANUFACTURING)Manufacturing——3.5 yrs51.3
ANDERSONS, INC., THE (FERTILIZER (MIXING ONLY) MANUFACTURING)Manufacturing——3.5 yrs51.3
HERD SEEDER CO., INC. (FARM MACHINERY AND EQUIPMENT MANUFACTURING)Manufacturing——3.5 yrs51.3
MODINE MFG. CO. (ALL OTHER MOTOR VEHICLE PARTS MANUFACTURING)Manufacturing——3.5 yrs51.3
EIS FIBERCOATING, INC. (ALL OTHER PLASTICS PRODUCT MANUFACTURING)Manufacturing——3.5 yrs51.3

CASS datacenter FAQ

How many datacenter sites are in CASS?
74 scored datacenter candidate sites, averaging 50.7/100 DC Readiness.
Does CASS offer datacenter tax incentives?
Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
What is the natural-hazard risk in CASS?
FEMA's National Risk Index rates CASS as "Relatively Moderate" (score 32).
What are industrial electricity rates in CASS?
Average industrial electricity is 7.64¢/kWh and commercial is 11.23¢/kWh in CASS.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for CASS, Indiana. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.