Datacenter Sites in Mason, Illinois

Mason has 19 scored datacenter candidate sites averaging 55.4/100 DC Readiness, with a catalogued aggregate of 300 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

At a glance

Mason, Illinois has 19 scored datacenter candidate sites averaging 55.4/100 DC Readiness, roughly in line with the Illinois average of 53.6. It ranks 44th of 101 Illinois counties by number of sites and 27th by average score. The top-scoring site is HAVANA at 61.1/100.

19
Candidate sites
55.4/100
Avg DC Readiness
300 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 19 in Mason

Site-selection context for Mason

Yessales_tax_exemption
Datacenter tax incentive
10.88¢/kWh
Commercial electricity
8.62¢/kWh
Industrial electricity
3
Fiber providers
Low
Water stress
$8,722
Land price / acre
1,100
Cooling degree days
5,600
Heating degree days
52°F
Mean annual temp

Incentive detail: Enterprise Zone sales tax exemption; High Impact Business designation for $12M+ DC investments.

How does Mason compare with other counties in Illinois?

By number of scored sites, Mason ranks 44th of the 101 Illinois counties with a county page, holding 0.5% of the state's 3,641 sites. Its average DC Readiness of 55.4/100 ranks 27th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1783rd-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 14 score 55 or higher.

What types of datacenter sites are in Mason?

Greenfield sites are the most common (14, 74% of the county's inventory), followed by substation-adjacent (3) and industrial (2). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Mason?

Industrial electricity averages 8.62¢/kWh and commercial 10.88¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (35). WRI water stress is low. 3 fiber providers report service in the county. The climate runs 1,100 cooling degree days a year with a mean temperature of 52°F. Land is valued around $8,722 an acre.

By site type

Top datacenter sites in Mason

Top datacenter sites in Mason
SiteTypeVoltageCapacityQueue waitScore
HAVANASubstation-Adjacent138 kV100 MW4.8 yrs61.1
EC Coal Mason CountyGreenfield——4.8 yrs57.8
EC Coal Mason CountyGreenfield——4.8 yrs57.5
HAVANA SSubstation-Adjacent138 kV100 MW4.8 yrs56.8
EC FFE Mason CountyGreenfield——4.8 yrs56.7
EC Near HavanaGreenfield——4.8 yrs56.7
EC Coal Mason CountyGreenfield——4.8 yrs56.4
MASON CITY WESTSubstation-Adjacent138 kV100 MW4.8 yrs56.4
EC Near HavanaGreenfield——4.8 yrs56.4
EC Near HavanaGreenfield——4.8 yrs55.9
EC Near HavanaGreenfield——4.8 yrs55.9
EC Near HavanaGreenfield——4.8 yrs55.4
EC Near HavanaGreenfield——4.8 yrs55.1
EC Near HavanaGreenfield——4.8 yrs55.0
EC Near HavanaGreenfield——4.8 yrs52.9
EC Near HavanaGreenfield——4.8 yrs52.8
EC Near HavanaGreenfield——4.8 yrs51.7
Forest City High SchoolIndustrial——4.8 yrs51.4
Former Prairieland SteelIndustrial——4.8 yrs50.5

Every scored site in Mason

All 19 sites, best first.

Mason datacenter FAQ

How many datacenter sites are in Mason?

19 scored datacenter candidate sites, averaging 55.4/100 DC Readiness. That is the 44th-most of 101 Illinois counties with five or more sites.

What is the highest-scoring datacenter site in Mason?

HAVANA scores 61.1/100 DC Readiness, the highest of the 19 scored sites in Mason (a substation-adjacent site).

Does Mason offer datacenter tax incentives?

Enterprise Zone sales tax exemption; High Impact Business designation for $12M+ DC investments.

What is the natural-hazard risk in Mason?

FEMA's National Risk Index rates Mason as "Relatively High" (score 35).

What are industrial electricity rates in Mason?

Average industrial electricity is 8.62¢/kWh and commercial is 10.88¢/kWh in Mason.

More in Illinois

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Mason, Illinois”, https://gridcensus.com/datacenter-sites/illinois/mason (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Mason, Illinois is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.