Skip to content
Gridcensus

MASON CITY WEST

Substation-Adjacent

Mason, Illinois · PJM

DC Readiness
58.3
Good / 100

MASON CITY WEST is a substation-adjacent datacenter candidate site in Mason, Illinois, interconnecting through PJM. It screens at 58.3/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationMASON CITY WEST
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
UtilityMENARD ELECTRIC COOPcooperativemoderate to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth393
Avg queue wait3.8 yrs

Connectivity

Nearest IXPSFN IL-Peoria
IXP distance37.8 mi
Fiber providers3
Fiber coverage74.5%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score65/100

Location context

Nearest datacenterSFN IL-Peoria
DC distance37.8 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.88¢/kWh
Industrial electricity8.62¢/kWh
Cooling degree days1,100
Heating degree days5,600
Land price / acre$8,722

Regulatory climate

Restrictivestate posture · as of 2026-08

New-DC state tax exemptions suspended for 2 years (from Jul 2026).

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone sales tax exemption; High Impact Business designation for $12M+ DC investments.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track MASON CITY WEST

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power20%
49
Fiber connectivity12%
67
Energy cost10%
50
Water risk7%
88
Natural hazard6%
65
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
40
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
70

Nearby comparable sites

Other scored datacenter candidate sites in Mason, ranked by DC Readiness.

Sites near MASON CITY WEST
SiteTypeVoltageCapacityQueue waitScore
HAVANASubstation-Adjacent138 kV100 MW3.8 yrs61.8
EC Coal Mason CountyGreenfield——4.6 yrs59.1
EC Coal Mason CountyGreenfield——4.6 yrs58.8
HAVANA SSubstation-Adjacent138 kV100 MW3.8 yrs58.7
EC FFE Mason CountyGreenfield——4.6 yrs58.1
EC Near HavanaGreenfield——4.6 yrs58.0
EC Coal Mason CountyGreenfield——4.6 yrs57.7
EC Near HavanaGreenfield——4.6 yrs57.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for MASON CITY WEST, Mason is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.