Datacenter Sites in Jackson, Illinois
Jackson has 34 scored datacenter candidate sites averaging 53.6/100 DC Readiness, with a catalogued aggregate of 500 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.
At a glance
Jackson, Illinois has 34 scored datacenter candidate sites averaging 53.6/100 DC Readiness, roughly in line with the Illinois average of 53.6. It ranks 28th of 101 Illinois counties by number of sites and 63rd by average score. The top-scoring site is Substation-Adjacent site · 1c72360b at 59.7/100.
Site-selection context for Jackson
Incentive detail: Enterprise Zone sales tax exemption; High Impact Business designation for $12M+ DC investments.
How does Jackson compare with other counties in Illinois?
By number of scored sites, Jackson ranks 28th of the 101 Illinois counties with a county page, holding 0.9% of the state's 3,641 sites. Its average DC Readiness of 53.6/100 ranks 63rd in the state and is roughly in line with the national average of 53.0. Nationally it has the 1141st-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 16 score 55 or higher.
What types of datacenter sites are in Jackson?
Greenfield sites are the most common (18, 53% of the county's inventory), followed by former mine (8) and substation-adjacent (5). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.
What are power cost, hazard, water and fiber conditions in Jackson?
Industrial electricity averages 3.10¢/kWh and commercial 10.00¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (35). WRI water stress is low. 8 fiber providers report service in the county. The climate runs 1,100 cooling degree days a year with a mean temperature of 52°F. Land is valued around $5,094 an acre.
By site type
Top datacenter sites in Jackson
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| UNKNOWN121881 | Substation-Adjacent | 138 kV | 100 MW | 4.8 yrs | 59.7 |
| OZ Jackson | Greenfield | — | — | 4.8 yrs | 58.6 |
| EC Coal Jackson County | Greenfield | — | — | 4.8 yrs | 57.7 |
| EC Near Grand Tower Energy Center LLC | Greenfield | — | — | 4.8 yrs | 56.9 |
| UNKNOWN122346 | Substation-Adjacent | 161 kV | 100 MW | 4.8 yrs | 56.7 |
| EC Near Grand Tower Energy Center LLC | Greenfield | — | — | 4.8 yrs | 56.6 |
| CARBONDALE NW | Substation-Adjacent | 138 kV | 100 MW | 4.8 yrs | 56.3 |
| REEDS | Substation-Adjacent | 138 kV | 100 MW | 4.8 yrs | 56.3 |
| EC Coal Jackson County | Greenfield | — | — | 4.8 yrs | 56.3 |
| EC Coal Jackson County | Greenfield | — | — | 4.8 yrs | 56.2 |
| TAP153316 | Substation-Adjacent | 138 kV | 100 MW | 4.8 yrs | 56.2 |
| EC Near Grand Tower Energy Center LLC | Greenfield | — | — | 4.8 yrs | 56.2 |
| EC Coal Jackson County | Greenfield | — | — | 4.8 yrs | 55.8 |
| EC Near Grand Tower Energy Center LLC | Greenfield | — | — | 4.8 yrs | 55.6 |
| EC Near Grand Tower Energy Center LLC | Greenfield | — | — | 4.8 yrs | 55.5 |
| EC Near Grand Tower Energy Center LLC | Greenfield | — | — | 4.8 yrs | 55.1 |
| EC Near Grand Tower Energy Center LLC | Greenfield | — | — | 4.8 yrs | 54.9 |
| EC Near Grand Tower Energy Center LLC | Greenfield | — | — | 4.8 yrs | 54.8 |
| EC Near Grand Tower Energy Center LLC | Greenfield | — | — | 4.8 yrs | 53.9 |
| EC FFE Jackson County | Greenfield | — | — | 4.8 yrs | 52.4 |
| OZ Jackson | Greenfield | — | — | 4.8 yrs | 52.4 |
| EC Near Grand Tower Energy Center LLC | Greenfield | — | — | 4.8 yrs | 51.8 |
| Mine Site | Former Mine | — | — | 4.8 yrs | 50.1 |
| Curwood Incoporated | Industrial | — | — | 4.8 yrs | 50.1 |
| Mine Site | Former Mine | — | — | 4.8 yrs | 50.0 |
Every scored site in Jackson
All 34 sites, best first.
- Substation-Adjacent site · 1c72360b · 59.7
- OZ Jackson · 9ce81de5 · 58.6
- EC Coal Jackson County · cbacaf5e · 57.7
- EC Near Grand Tower Energy Center LLC · 76ea0cc5 · 56.9
- Substation-Adjacent site · 93eb82e0 · 56.7
- EC Near Grand Tower Energy Center LLC · cdd3bb27 · 56.6
- CARBONDALE NW · 56.3
- REEDS · 56.3
- EC Coal Jackson County · 66abf51c · 56.3
- EC Coal Jackson County · e5aa1fed · 56.2
- Substation-Adjacent site · 593202b0 · 56.2
- EC Near Grand Tower Energy Center LLC · f978602c · 56.2
- EC Coal Jackson County · ac330f05 · 55.8
- EC Near Grand Tower Energy Center LLC · ab5609f1 · 55.6
- EC Near Grand Tower Energy Center LLC · 142d5f04 · 55.5
- EC Near Grand Tower Energy Center LLC · 92c5cf15 · 55.1
- EC Near Grand Tower Energy Center LLC · 07ed4282 · 54.9
- EC Near Grand Tower Energy Center LLC · abdb2fa9 · 54.8
- EC Near Grand Tower Energy Center LLC · f0293f5e · 53.9
- EC FFE Jackson County · 52.4
- OZ Jackson · 44086b37 · 52.4
- EC Near Grand Tower Energy Center LLC · 0f17c6ef · 51.8
- Mine Site · 8ecc0b4d · 50.1
- Curwood Incoporated · 50.1
- Mine Site · bddfa896 · 50.0
- Mine Site · c7ff9e4b · 50.0
- Mine Site · bb1b276b · 50.0
- Mine Site · 9d2da9e7 · 49.9
- Mine Site · 4722b663 · 49.9
- EC Near Grand Tower Energy Center LLC · c44291ec · 49.7
- SHAWNEE NATIONAL FOREST · 65479957 · 49.7
- SOUTHERN ILLINOIS AIRPORT · 5d3e47ec · 49.6
- Mine Site · 34fd78da · 49.3
- Mine Site · c6105a1a · 48.5
Jackson datacenter FAQ
How many datacenter sites are in Jackson?
34 scored datacenter candidate sites, averaging 53.6/100 DC Readiness. That is the 28th-most of 101 Illinois counties with five or more sites.
What is the highest-scoring datacenter site in Jackson?
Substation-Adjacent site · 1c72360b scores 59.7/100 DC Readiness, the highest of the 34 scored sites in Jackson (a substation-adjacent site).
Does Jackson offer datacenter tax incentives?
Enterprise Zone sales tax exemption; High Impact Business designation for $12M+ DC investments.
What is the natural-hazard risk in Jackson?
FEMA's National Risk Index rates Jackson as "Relatively High" (score 35).
What are industrial electricity rates in Jackson?
Average industrial electricity is 3.10¢/kWh and commercial is 10.00¢/kWh in Jackson.
More in Illinois
- All datacenter sites in Illinois· 3,641 sites
- Operating datacenters in Illinois
- Electric substations in Illinois
- Cook County· 745 sites · avg 53.1
- Winnebago County· 193 sites · avg 51.1
- Stephenson County· 127 sites · avg 47.8
- Madison County· 112 sites · avg 55.9
- St. Clair County· 100 sites · avg 54.4
- Lake· 89 sites · avg 54.8
- Greenfield sites in Illinois
- Former Mine sites in Illinois
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Datacenter candidate sites in Jackson, Illinois”, https://gridcensus.com/datacenter-sites/illinois/jackson (data as of November 12, 2026).
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
Every site and score for Jackson, Illinois is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.