SHAWNEE NATIONAL FOREST

Federal Excess

Jackson, Illinois · MISO

DC Readiness
49.7
Fair / 100

SHAWNEE NATIONAL FOREST is a federal excess datacenter candidate site in Jackson, Illinois, interconnecting through MISO. It screens at 49.7/100 DC Readiness and a 4.8 yrs average interconnection-queue wait.

Power & interconnection

UtilityEGYPTIAN ELECTRIC COOP ASSNcooperativemoderate to large load · state default

Speed to power

Interconnection outlookConstrained
≈ 6.1 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionMISO
Queue depth277
Avg queue wait4.8 yrs
Recent queue wait6.1 yrs
Completion rate21%
Withdrawal rate79%

Connectivity

Nearest IXPQuad State Internet METRO1 Colocation
IXP distance54.2 mi
Fiber providers8
Fiber coverage57.8%
Max download57 Mbps

Site characteristics

Acreage5 ac
Buildable load (est.)~2–5 MWland-based
Former useOffice Building Locations

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score65/100

Location context

Nearest datacenterQuad State Internet METRO1 Colocation
DC distance54.2 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.00¢/kWh
Industrial electricity3.10¢/kWh
Cooling degree days1,100
Heating degree days5,600
Land price / acre$5,094

Regulatory climate

Restrictivestate posture · as of 2026-08

New-DC state tax exemptions suspended for 2 years (from Jul 2026).

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone sales tax exemption; High Impact Business designation for $12M+ DC investments.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track SHAWNEE NATIONAL FOREST

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
47
Fiber connectivity12%
66
Energy cost10%
50
Water risk7%
88
Natural hazard6%
65
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
27
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
70

Nearby comparable sites

Other scored datacenter candidate sites in Jackson, ranked by DC Readiness.

Sites near SHAWNEE NATIONAL FOREST
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN121881Substation-Adjacent138 kV100 MW4.8 yrs59.7
OZ JacksonGreenfield——4.8 yrs58.6
EC Coal Jackson CountyGreenfield——4.8 yrs57.7
EC Near Grand Tower Energy Center LLCGreenfield——4.8 yrs56.9
UNKNOWN122346Substation-Adjacent161 kV100 MW4.8 yrs56.7
EC Near Grand Tower Energy Center LLCGreenfield——4.8 yrs56.6
CARBONDALE NWSubstation-Adjacent138 kV100 MW4.8 yrs56.3
REEDSSubstation-Adjacent138 kV100 MW4.8 yrs56.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for SHAWNEE NATIONAL FOREST, Jackson is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.