Datacenter Sites in Boone County, Illinois
Boone County has 21 scored datacenter candidate sites averaging 52.6/100 DC Readiness, with a catalogued aggregate of 2,200 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.
At a glance
Boone County, Illinois has 21 scored datacenter candidate sites averaging 52.6/100 DC Readiness, roughly in line with the Illinois average of 53.6. It ranks 39th of 101 Illinois counties by number of sites and 81st by average score. The top-scoring site is CHERRY VALLEY at 62.1/100.
Site-selection context for Boone County
Incentive detail: Enterprise Zone sales tax exemption; High Impact Business designation for $12M+ DC investments.
How does Boone County compare with other counties in Illinois?
By number of scored sites, Boone County ranks 39th of the 101 Illinois counties with a county page, holding 0.6% of the state's 3,641 sites. Its average DC Readiness of 52.6/100 ranks 81st in the state and is roughly in line with the national average of 53.0. Nationally it has the 1665th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 6 score 55 or higher.
What types of datacenter sites are in Boone County?
Substation-Adjacent sites are the most common (8, 38% of the county's inventory), followed by industrial (8) and former mine (5). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.
What are power cost, hazard, water and fiber conditions in Boone County?
Industrial electricity averages 6.20¢/kWh and commercial 9.35¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (35). WRI water stress is low. 8 fiber providers report service in the county. The climate runs 1,100 cooling degree days a year with a mean temperature of 52°F. Land is valued around $9,226 an acre.
By site type
Top datacenter sites in Boone County
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| CHERRY VALLEY | Substation-Adjacent | 345 kV | 600 MW | 4.8 yrs | 62.1 |
| TAP137873 | Substation-Adjacent | 345 kV | 600 MW | 4.8 yrs | 61.4 |
| UNKNOWN122295 | Substation-Adjacent | 345 kV | 600 MW | 4.8 yrs | 61.4 |
| TAP137871 | Substation-Adjacent | 138 kV | 100 MW | 4.8 yrs | 55.8 |
| UNKNOWN122296 | Substation-Adjacent | 138 kV | 100 MW | 4.8 yrs | 55.8 |
| UNKNOWN121926 | Substation-Adjacent | 138 kV | 100 MW | 4.8 yrs | 55.1 |
| SHARON | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 54.6 |
| TIGER | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 54.5 |
| Mine Site | Former Mine | — | — | 4.8 yrs | 50.1 |
| Silver Salvage I | Industrial | — | — | 4.8 yrs | 49.6 |
| K-B Farms | Industrial | — | — | 4.8 yrs | 49.6 |
| Mine Site | Former Mine | — | — | 4.8 yrs | 49.6 |
| Riverside FS | Industrial | — | — | 4.8 yrs | 49.5 |
| Silver Salvage II | Industrial | — | — | 4.8 yrs | 49.5 |
| ASB Property | Industrial | — | — | 4.8 yrs | 49.5 |
| Mine Site | Former Mine | — | — | 4.8 yrs | 49.5 |
| Leath Furniture-Former | Industrial | — | — | 4.8 yrs | 49.5 |
| American Small Business | Industrial | — | — | 4.8 yrs | 49.5 |
| Belvidere Construction Company | Industrial | — | — | 4.8 yrs | 49.5 |
| Mine Site | Former Mine | — | — | 4.8 yrs | 49.4 |
| Mine Site | Former Mine | — | — | 4.8 yrs | 49.3 |
Every scored site in Boone County
All 21 sites, best first.
- CHERRY VALLEY · 62.1
- Substation-Adjacent site · e1e55194 · 61.4
- Substation-Adjacent site · 9853b49e · 61.4
- Substation-Adjacent site · bbd89283 · 55.8
- Substation-Adjacent site · dbef4ba4 · 55.8
- Substation-Adjacent site · ae970536 · 55.1
- SHARON · 54.6
- TIGER · 54.5
- Mine Site · 603b28ff · 50.1
- Silver Salvage I · 49.6
- K-B Farms · 49.6
- Mine Site · 8cb507df · 49.6
- Riverside FS · 49.5
- Silver Salvage II · 49.5
- ASB Property · 49.5
- Mine Site · 4a6ebff7 · 49.5
- Leath Furniture-Former · 49.5
- American Small Business · 49.5
- Belvidere Construction Company · 49.5
- Mine Site · 2db755cc · 49.4
- Mine Site · d9ccf112 · 49.3
Boone County datacenter FAQ
How many datacenter sites are in Boone County?
21 scored datacenter candidate sites, averaging 52.6/100 DC Readiness. That is the 39th-most of 101 Illinois counties with five or more sites.
What is the highest-scoring datacenter site in Boone County?
CHERRY VALLEY scores 62.1/100 DC Readiness, the highest of the 21 scored sites in Boone County (a substation-adjacent site).
Does Boone County offer datacenter tax incentives?
Enterprise Zone sales tax exemption; High Impact Business designation for $12M+ DC investments.
What is the natural-hazard risk in Boone County?
FEMA's National Risk Index rates Boone County as "Relatively High" (score 35).
What are industrial electricity rates in Boone County?
Average industrial electricity is 6.20¢/kWh and commercial is 9.35¢/kWh in Boone County.
More in Illinois
- All datacenter sites in Illinois· 3,641 sites
- Operating datacenters in Illinois
- Electric substations in Illinois
- Cook County· 745 sites · avg 53.1
- Winnebago County· 193 sites · avg 51.1
- Stephenson County· 127 sites · avg 47.8
- Madison County· 112 sites · avg 55.9
- St. Clair County· 100 sites · avg 54.4
- Lake· 89 sites · avg 54.8
- Substation-Adjacent sites in Illinois
- Industrial sites in Illinois
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Datacenter candidate sites in Boone County, Illinois”, https://gridcensus.com/datacenter-sites/illinois/boone-county (data as of November 12, 2026).
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
Every site and score for Boone County, Illinois is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.