Boone County, Wisconsin · MISO

DC Readiness
53.8
Fair / 100

TIGER is a substation-adjacent datacenter candidate site in Boone County, Wisconsin, interconnecting through MISO. It screens at 53.8/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTIGER
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityROCK ENERGY COOPERATIVEcooperativefavorable to large load · state default

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth133
Avg queue wait2.8 yrs

Connectivity

Nearest IXPRochelle Technology Center
IXP distance41.2 mi
Fiber providers8
Fiber coverage41.5%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score65/100

Location context

Nearest datacenterCentral Office
DC distance22.4 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.35¢/kWh
Industrial electricity6.20¢/kWh
Cooling degree days1,100
Heating degree days5,600
Land price / acre$9,226

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone sales tax exemption; High Impact Business designation for $12M+ DC investments.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track TIGER

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
45
Fiber connectivity12%
61
Energy cost10%
50
Water risk7%
88
Natural hazard6%
65
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
40
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
70

Nearby comparable sites

Other scored datacenter candidate sites in Boone County, ranked by DC Readiness.

Sites near TIGER
SiteTypeVoltageCapacityQueue waitScore
CHERRY VALLEYSubstation-Adjacent345 kV600 MW3.8 yrs64.0
TAP137873Substation-Adjacent345 kV600 MW3.8 yrs63.3
UNKNOWN122295Substation-Adjacent345 kV600 MW3.8 yrs63.3
UNKNOWN122296Substation-Adjacent138 kV100 MW3.8 yrs57.7
TAP137871Substation-Adjacent138 kV100 MW3.8 yrs57.7
UNKNOWN121926Substation-Adjacent138 kV100 MW3.8 yrs57.0
SHARONSubstation-Adjacent69 kV50 MW2.8 yrs53.9
Mine SiteFormer Mine——3.8 yrs52.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.