Datacenter Sites in Jefferson County, Florida

Jefferson County has 14 scored datacenter candidate sites averaging 55.1/100 DC Readiness, with a catalogued aggregate of 950 MW. FEMA rates local natural-hazard risk as "Very High". The county has a datacenter tax incentive on record.

At a glance

Jefferson County, Florida has 14 scored datacenter candidate sites averaging 55.1/100 DC Readiness, roughly in line with the Florida average of 56.0. It ranks 53rd of 66 Florida counties by number of sites and 27th by average score. The top-scoring site is Substation-Adjacent site · 85b4ce24 at 58.2/100.

14
Candidate sites
55.1/100
Avg DC Readiness
950 MW
Catalogued capacity
theoretical aggregate
Very High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 14 in Jefferson County

Site-selection context for Jefferson County

Yessales_tax_exemption
Datacenter tax incentive
14.14¢/kWh
Commercial electricity
8.57¢/kWh
Industrial electricity
4
Fiber providers
Low-Medium
Water stress
$5,049
Land price / acre
3,500
Cooling degree days
700
Heating degree days
72°F
Mean annual temp

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

How does Jefferson County compare with other counties in Florida?

By number of scored sites, Jefferson County ranks 53rd of the 66 Florida counties with a county page, holding 0.3% of the state's 4,344 sites. Its average DC Readiness of 55.1/100 ranks 27th in the state and is roughly in line with the national average of 53.0. Nationally it has the 2089th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 10 score 55 or higher.

What types of datacenter sites are in Jefferson County?

Substation-Adjacent sites are the most common (10, 71% of the county's inventory), followed by federal excess (3) and former mine (1). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Jefferson County?

Industrial electricity averages 8.57¢/kWh and commercial 14.14¢/kWh. FEMA's National Risk Index rates the county "Very High" (55). WRI water stress is low-medium. 4 fiber providers report service in the county. The climate runs 3,500 cooling degree days a year with a mean temperature of 72°F. Land is valued around $5,049 an acre.

By site type

Top datacenter sites in Jefferson County

Top datacenter sites in Jefferson County
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN121064Substation-Adjacent115 kV100 MW3.7 yrs58.2
UNKNOWN121039Substation-Adjacent115 kV100 MW3.7 yrs58.0
UNKNOWN108203Substation-Adjacent115 kV100 MW3.7 yrs57.9
TAP143117Substation-Adjacent115 kV100 MW3.7 yrs57.6
TAP143308Substation-Adjacent115 kV100 MW3.7 yrs57.5
DRIFTONSubstation-Adjacent115 kV100 MW3.7 yrs57.4
TAP143116Substation-Adjacent115 kV100 MW3.7 yrs56.5
UNKNOWN121087Substation-Adjacent115 kV100 MW3.7 yrs56.2
ERIDUSubstation-Adjacent115 kV100 MW3.7 yrs56.0
UNKNOWN108214Substation-Adjacent69 kV50 MW3.7 yrs55.1
GREENVILLE FLFederal Excess——3.7 yrs50.6
GREENVILLE FLFederal Excess——3.7 yrs50.1
Mine SiteFormer Mine——3.7 yrs50.1
GREENVILLE FLFederal Excess——3.7 yrs50.1

Every scored site in Jefferson County

All 14 sites, best first.

Jefferson County datacenter FAQ

How many datacenter sites are in Jefferson County?

14 scored datacenter candidate sites, averaging 55.1/100 DC Readiness. That is the 53rd-most of 66 Florida counties with five or more sites.

What is the highest-scoring datacenter site in Jefferson County?

Substation-Adjacent site · 85b4ce24 scores 58.2/100 DC Readiness, the highest of the 14 scored sites in Jefferson County (a substation-adjacent site).

Does Jefferson County offer datacenter tax incentives?

Sales tax exemption on manufacturing machinery including servers; no state income tax.

What is the natural-hazard risk in Jefferson County?

FEMA's National Risk Index rates Jefferson County as "Very High" (score 55).

What are industrial electricity rates in Jefferson County?

Average industrial electricity is 8.57¢/kWh and commercial is 14.14¢/kWh in Jefferson County.

More in Florida

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Jefferson County, Florida”, https://gridcensus.com/datacenter-sites/florida/jefferson-county (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Jefferson County, Florida is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.