Datacenter Sites in Prowers, Colorado
Prowers has 62 scored datacenter candidate sites averaging 50.1/100 DC Readiness, with a catalogued aggregate of 1,656 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.
At a glance
Prowers, Colorado has 62 scored datacenter candidate sites averaging 50.1/100 DC Readiness, roughly in line with the Colorado average of 50.6. It ranks 18th of 64 Colorado counties by number of sites and 32nd by average score. The top-scoring site is EC Near Lamar Plant · 0ac88c96 at 55.6/100.
Site-selection context for Prowers
Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.
How does Prowers compare with other counties in Colorado?
By number of scored sites, Prowers ranks 18th of the 64 Colorado counties with a county page, holding 1.8% of the state's 3,428 sites. Its average DC Readiness of 50.1/100 ranks 32nd in the state and is roughly in line with the national average of 53.0. Nationally it has the 597th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 4 score 55 or higher.
What types of datacenter sites are in Prowers?
Greenfield sites are the most common (23, 37% of the county's inventory), followed by substation-adjacent (15) and industrial (12). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.
What are power cost, hazard, water and fiber conditions in Prowers?
Industrial electricity averages 12.84¢/kWh and commercial 13.53¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (25). WRI water stress is high. 2 fiber providers report service in the county. The climate runs 700 cooling degree days a year with a mean temperature of 46°F. Land is valued around $1,393 an acre.
By site type
Top datacenter sites in Prowers
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| EC Near Lamar Plant | Greenfield | — | — | 4.3 yrs | 55.6 |
| EC Near Holly | Greenfield | — | — | 4.3 yrs | 55.5 |
| TAP205667 | Substation-Adjacent | 230 kV | 300 MW | 4.3 yrs | 55.2 |
| OZ Prowers | Greenfield | — | — | 4.3 yrs | 55.2 |
| EC Near Holly | Greenfield | — | — | 4.3 yrs | 54.7 |
| EC Near Holly | Greenfield | — | — | 4.3 yrs | 54.3 |
| EC Coal Prowers County | Greenfield | — | — | 4.3 yrs | 54.3 |
| EC Near Holly | Greenfield | — | — | 4.3 yrs | 54.2 |
| EC Near Lamar Plant | Greenfield | — | — | 4.3 yrs | 54.1 |
| EC Near Lamar Plant | Greenfield | — | — | 4.3 yrs | 53.9 |
| EC Near Holly | Greenfield | — | — | 4.3 yrs | 53.7 |
| EC Near Lamar Plant | Greenfield | — | — | 4.3 yrs | 53.7 |
| EC Near Lamar Plant | Greenfield | — | — | 4.3 yrs | 53.6 |
| EC Near Lamar Plant | Greenfield | — | — | 4.3 yrs | 53.2 |
| EC Near Holly | Greenfield | — | — | 4.3 yrs | 53.2 |
| EC Near Lamar Plant | Greenfield | — | — | 4.3 yrs | 53.2 |
| EC Coal Prowers County | Greenfield | — | — | 4.3 yrs | 53.0 |
| Lamar Plant | Brownfield | 115 kV | 56 MW | 4.3 yrs | 52.9 |
| EC Near Lamar Plant | Greenfield | — | — | 4.3 yrs | 52.7 |
| EC Near Lamar Plant | Greenfield | — | — | 4.3 yrs | 52.7 |
| EC Near Holly | Greenfield | — | — | 4.3 yrs | 52.6 |
| EC Near Lamar Plant | Greenfield | — | — | 4.3 yrs | 52.4 |
| TAP206905 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 52.4 |
| EC Near Holly | Greenfield | — | — | 4.3 yrs | 52.4 |
| UNKNOWN203943 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 52.4 |
Every scored site in Prowers
All 62 sites, best first.
- EC Near Lamar Plant · 0ac88c96 · 55.6
- EC Near Holly · 5472d860 · 55.5
- OZ Prowers · 55.2
- Substation-Adjacent site · 83b3f420 · 55.2
- EC Near Holly · 95d4b7f4 · 54.7
- EC Coal Prowers County · 6c15cd72 · 54.3
- EC Near Holly · 4b9ce212 · 54.3
- EC Near Holly · 823888b3 · 54.2
- EC Near Lamar Plant · fe0f2460 · 54.1
- EC Near Lamar Plant · ca2e70d9 · 53.9
- EC Near Holly · b5aa6fa8 · 53.7
- EC Near Lamar Plant · f6bfd5b9 · 53.7
- EC Near Lamar Plant · 6994e758 · 53.6
- EC Near Holly · f2cd0f81 · 53.2
- EC Near Lamar Plant · ac00af6d · 53.2
- EC Near Lamar Plant · 83e5f563 · 53.2
- EC Coal Prowers County · 3261cea0 · 53.0
- Lamar Plant · 52.9
- EC Near Lamar Plant · 0fddce2f · 52.7
- EC Near Lamar Plant · 57c684f5 · 52.7
- EC Near Holly · 271275d5 · 52.6
- EC Near Holly · f6336470 · 52.4
- Substation-Adjacent site · 8822ea6c · 52.4
- Substation-Adjacent site · 81acdb38 · 52.4
- EC Near Lamar Plant · 02be5ec3 · 52.4
- Substation-Adjacent site · f4581cf5 · 52.3
- Substation-Adjacent site · d9a8d28d · 52.3
- EC Near Holly · e460d258 · 52.2
- Substation-Adjacent site · 212a7a5c · 52.2
- Substation-Adjacent site · 1fa2140a · 52.1
- Substation-Adjacent site · 49bbd032 · 52.0
- Substation-Adjacent site · 02e4fe83 · 51.5
- Substation-Adjacent site · 98ab4a92 · 51.4
- Substation-Adjacent site · d72af845 · 51.3
- Substation-Adjacent site · aadb7268 · 51.1
- Substation-Adjacent site · 09171ddc · 51.0
- Substation-Adjacent site · bd81c101 · 50.3
- EC Near Holly · 7ef48fc0 · 49.4
- Substation-Adjacent site · f7c8ea49 · 49.2
- Mine Site · 78e9a6ff · 46.7
- Halliburton Property · 46.5
- Mine Site · 3d53cf64 · 46.4
- Mine Site · db03de1f · 46.4
- Mine Site · 628324a4 · 45.9
- Meat Processing Plant · 45.4
- Central Alignment Property · 45.4
- Eagles Lodge · 45.4
- Quiznos · 45.4
- Gadash Property · 45.4
- Main Cafe · 45.4
- Mine Site · 39eb2d4c · 45.4
- JC Penney · 45.4
- McKibbon House · 45.4
- Troy Manor Motel · 45.3
- Kemp Property · 45.3
- River City Auto · 45.3
- Mine Site · aa2f2bd7 · 44.9
- Mine Site · f9377cb9 · 44.9
- Mine Site · e3edddcf · 44.9
- Mine Site · dc5fbeaa · 44.9
- Mine Site · 02dbd025 · 44.9
- Mine Site · eb08b17c · 44.9
Prowers datacenter FAQ
How many datacenter sites are in Prowers?
62 scored datacenter candidate sites, averaging 50.1/100 DC Readiness. That is the 18th-most of 64 Colorado counties with five or more sites.
What is the highest-scoring datacenter site in Prowers?
EC Near Lamar Plant · 0ac88c96 scores 55.6/100 DC Readiness, the highest of the 62 scored sites in Prowers (a greenfield site).
Does Prowers offer datacenter tax incentives?
Enterprise Zone sales tax exemptions; broadband equipment tax credit.
What is the natural-hazard risk in Prowers?
FEMA's National Risk Index rates Prowers as "Relatively Moderate" (score 25).
What are industrial electricity rates in Prowers?
Average industrial electricity is 12.84¢/kWh and commercial is 13.53¢/kWh in Prowers.
More in Colorado
- All datacenter sites in Colorado· 3,428 sites
- Operating datacenters in Colorado
- Electric substations in Colorado
- Ouray County· 272 sites · avg 47.7
- Montezuma County· 211 sites · avg 47.5
- Denver County· 180 sites · avg 56.9
- Montrose County· 157 sites · avg 49.1
- Pueblo County· 148 sites · avg 52.0
- Larimer County· 139 sites · avg 51.1
- Greenfield sites in Colorado
- Substation-Adjacent sites in Colorado
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Datacenter candidate sites in Prowers, Colorado”, https://gridcensus.com/datacenter-sites/colorado/prowers (data as of November 12, 2026).
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
Every site and score for Prowers, Colorado is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.