Datacenter Sites in Prowers, Colorado
Prowers has 79 scored datacenter candidate sites averaging 49.1/100 DC Readiness, with a catalogued aggregate of 5,756 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.
79
Candidate sites
49.1/100
Avg DC Readiness
5,756 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
Site-selection context for Prowers
Yessales_tax_exemption
Datacenter tax incentive
13.53¢/kWh
Commercial electricity
12.84¢/kWh
Industrial electricity
3
Fiber providers
High
Water stress
$1,393
Land price / acre
700
Cooling degree days
6,200
Heating degree days
46°F
Mean annual temp
Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.
By site type
Top datacenter sites in Prowers
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| COLORADO GREEN | Substation-Adjacent | 230 kV | 300 MW | 1.7 yrs | 62.6 |
| COLORADO GREEN HOLDINGS LLC | Substation-Adjacent | 230 kV | 300 MW | 1.7 yrs | 62.5 |
| UNKNOWN208110 | Substation-Adjacent | 115 kV | 100 MW | 1.7 yrs | 58.8 |
| UNKNOWN203940 | Substation-Adjacent | 115 kV | 100 MW | 1.7 yrs | 58.4 |
| TAP208106 | Substation-Adjacent | 115 kV | 100 MW | 1.7 yrs | 58.2 |
| TAP208107 | Substation-Adjacent | 115 kV | 100 MW | 1.7 yrs | 58.1 |
| TAP206905 | Substation-Adjacent | 115 kV | 100 MW | 1.7 yrs | 58.1 |
| UNKNOWN201313 | Substation-Adjacent | 115 kV | 100 MW | 1.7 yrs | 57.9 |
| UNKNOWN203943 | Substation-Adjacent | 115 kV | 100 MW | 1.7 yrs | 57.8 |
| TAP203938 | Substation-Adjacent | 115 kV | 100 MW | 1.7 yrs | 57.6 |
| TAP205664 | Substation-Adjacent | 115 kV | 100 MW | 1.7 yrs | 57.3 |
| Greenfield (LAMAR HVDC TIE - UNKNOWN209699) | Greenfield | 345 kV | 600 MW | 1.7 yrs | 57.3 |
| UNKNOWN203933 | Substation-Adjacent | 115 kV | 100 MW | 1.7 yrs | 57.1 |
| Greenfield (UNKNOWN202172 - UNKNOWN201396) | Greenfield | 230 kV | 300 MW | 1.7 yrs | 56.9 |
| Greenfield (LAMAR HVDC TIE - UNKNOWN209699) | Greenfield | 345 kV | 600 MW | 1.7 yrs | 56.4 |
| Greenfield (LAMAR HVDC TIE - UNKNOWN209699) | Greenfield | 345 kV | 600 MW | 1.7 yrs | 56.1 |
| Greenfield (LAMAR HVDC TIE - TAP205667) | Greenfield | 230 kV | 300 MW | 1.7 yrs | 56.1 |
| Greenfield (LAMAR HVDC TIE - TAP205667) | Greenfield | 230 kV | 300 MW | 1.7 yrs | 55.7 |
| EC Near Lamar Plant | Greenfield | — | — | 1.7 yrs | 55.1 |
| EC Near Holly | Greenfield | — | — | 1.7 yrs | 55.0 |
| TAP203939 | Substation-Adjacent | 115 kV | 100 MW | 1.7 yrs | 54.6 |
| EC Near Holly | Greenfield | — | — | 1.7 yrs | 54.2 |
| EC Near Holly | Greenfield | — | — | 1.7 yrs | 53.7 |
| Greenfield (VILAS - LAMAR) | Greenfield | 115 kV | 100 MW | 1.7 yrs | 53.6 |
| OZ Prowers | Greenfield | — | — | 1.7 yrs | 53.6 |
Prowers datacenter FAQ
- How many datacenter sites are in Prowers?
- 79 scored datacenter candidate sites, averaging 49.1/100 DC Readiness.
- Does Prowers offer datacenter tax incentives?
- Enterprise Zone sales tax exemptions; broadband equipment tax credit.
- What is the natural-hazard risk in Prowers?
- FEMA's National Risk Index rates Prowers as "Relatively Moderate" (score 25).
- What are industrial electricity rates in Prowers?
- Average industrial electricity is 12.84¢/kWh and commercial is 13.53¢/kWh in Prowers.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Prowers, Colorado. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.