Substation-Adjacent site at 38.071, -102.616

Substation-Adjacent

Prowers, Colorado · WECC

DC Readiness
49.2
Fair / 100

At a glance

Substation-Adjacent site at 38.071, -102.616 is a substation-adjacent datacenter candidate site in Prowers, Colorado, scoring 49.2/100 DC Readiness — 39th of 62 scored sites in the county. Its nearest substation is UNKNOWN206904 (0 mi, 69 kV). It sits in the WECC grid region and the CITY OF LAMAR - (CO) service territory, where interconnection has averaged 3.5 years from request to operation. GridCensus catalogs 50 MW of candidate capacity here.

Power & interconnection

Nearest substationUNKNOWN206904
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityCITY OF LAMAR - (CO)not available

Speed to power

Interconnection outlookConstrained
≈ 5.5 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth34
Avg queue wait3.5 yrs
Recent queue wait5.5 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPT5@Colorado Springs
IXP distance127.5 mi
Fiber providers2
Fiber coverage0.5%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

Nearest datacenterDatacenter 00476609221
DC distance114.9 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.53¢/kWh
Industrial electricity12.84¢/kWh
Cooling degree days700
Heating degree days6,200
Land price / acre$1,393

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN206904

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Substation-Adjacent site at 38.071, -102.616 compare with other sites in Prowers?

Substation-Adjacent site at 38.071, -102.616 ranks 39th of 62 scored candidate sites in Prowers. Its 49.2/100 is roughly in line with the county average of 50.1. It is roughly in line with the Colorado average of 50.6 and roughly in line with the national average of 53.2.

Against the Colorado average, its strongest sub-score is power availability (46 vs 38) and its weakest is fiber connectivity (48 vs 62). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Substation-Adjacent site at 38.071, -102.616 to power, fiber and other datacenters?

The nearest mapped substation, UNKNOWN206904, is about 0 miles away and operates at 69 kV. For connectivity, the nearest internet exchange facility is T5@Colorado Springs at 127.5 miles. 2 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Datacenter 00476609221, 114.9 miles away.

What are the flood, water and hazard risks at Substation-Adjacent site at 38.071, -102.616?

At the county level, FEMA's National Risk Index rates Prowers "Relatively Moderate".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
50
Fiber connectivity12%
48
Energy cost10%
50
Water risk7%
36
Natural hazard6%
75
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Prowers, ranked by DC Readiness.

Sites near Substation-Adjacent site at 38.071, -102.616
SiteTypeVoltageCapacityQueue waitScore
EC Near Lamar PlantGreenfield——4.3 yrs55.6
EC Near HollyGreenfield——4.3 yrs55.5
OZ ProwersGreenfield——4.3 yrs55.2
TAP205667Substation-Adjacent230 kV300 MW4.3 yrs55.2
EC Near HollyGreenfield——4.3 yrs54.7
EC Coal Prowers CountyGreenfield——4.3 yrs54.3
EC Near HollyGreenfield——4.3 yrs54.3
EC Near HollyGreenfield——4.3 yrs54.2

Substation-Adjacent site at 38.071, -102.616: common questions

What is the DC Readiness score of Substation-Adjacent site at 38.071, -102.616?

Substation-Adjacent site at 38.071, -102.616 scores 49.2/100 on the GridCensus DC Readiness scale, rated fair. It ranks 39th of 62 scored sites in Prowers. The Prowers average is 50.1 and the Colorado average is 50.6.

What is the nearest substation to Substation-Adjacent site at 38.071, -102.616?

The nearest mapped substation is UNKNOWN206904, about 0 miles away, at 69 kV. GridCensus catalogs 50 MW of candidate capacity for the site.

Which electric utility serves Substation-Adjacent site at 38.071, -102.616?

CITY OF LAMAR - (CO) (not available) holds the retail service territory that contains the site; its holding company is CITY OF LAMAR (CO).

What grid region is Substation-Adjacent site at 38.071, -102.616 in?

Substation-Adjacent site at 38.071, -102.616 is in the WECC region. Projects interconnecting there have averaged a 3.5-year wait from queue request to operation.

How far is Substation-Adjacent site at 38.071, -102.616 from an internet exchange?

The nearest internet exchange facility is T5@Colorado Springs, about 127.5 miles away; 2 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Substation-Adjacent site at 38.071, -102.616, Prowers, CO”, https://gridcensus.com/datacenter-sites/colorado/prowers/unknown206904-f7c8ea49 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Substation-Adjacent site at 38.071, -102.616, Prowers is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.