Skip to content
Gridcensus

Datacenter Sites in Las Animas, Colorado

Las Animas has 42 scored datacenter candidate sites averaging 49.8/100 DC Readiness, with a catalogued aggregate of 700 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

Las Animas, Colorado has 42 scored datacenter candidate sites averaging 49.8/100 DC Readiness, roughly in line with the Colorado average of 50.6. It ranks 24th of 64 Colorado counties by number of sites and 36th by average score. The top-scoring site is EC Coal Las Animas County · 5c4ba850 at 55.9/100.

42
Candidate sites
49.8/100
Avg DC Readiness
700 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Las Animas

Site-selection context for Las Animas

Yessales_tax_exemption
Datacenter tax incentive
15.09¢/kWh
Commercial electricity
8.65¢/kWh
Industrial electricity
1
Fiber providers
High
Water stress
$1,005
Land price / acre
700
Cooling degree days
6,200
Heating degree days
46°F
Mean annual temp

Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.

How does Las Animas compare with other counties in Colorado?

By number of scored sites, Las Animas ranks 24th of the 64 Colorado counties with a county page, holding 1.2% of the state's 3,428 sites. Its average DC Readiness of 49.8/100 ranks 36th in the state and is roughly in line with the national average of 53.0. Nationally it has the 913th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 2 score 55 or higher.

What types of datacenter sites are in Las Animas?

Greenfield sites are the most common (16, 38% of the county's inventory), followed by industrial (11) and substation-adjacent (9). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Las Animas?

Industrial electricity averages 8.65¢/kWh and commercial 15.09¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (25). WRI water stress is high. 1 fiber providers report service in the county. The climate runs 700 cooling degree days a year with a mean temperature of 46°F. Land is valued around $1,005 an acre.

By site type

Top datacenter sites in Las Animas

Top datacenter sites in Las Animas
SiteTypeVoltageCapacityQueue waitScore
EC Coal Las Animas CountyGreenfield——4.3 yrs55.9
EC Near Trinidad (CO)Greenfield——4.3 yrs55.7
EC Near Trinidad (CO)Greenfield——4.3 yrs54.9
OZ Las AnimasGreenfield——4.3 yrs54.4
OZ Las AnimasGreenfield——4.3 yrs53.6
EC Near Trinidad (CO)Greenfield——4.3 yrs53.3
TAP208068Substation-Adjacent138 kV100 MW4.3 yrs52.8
OZ Las AnimasGreenfield——4.3 yrs52.6
EC Near Trinidad (CO)Greenfield——4.3 yrs52.5
EC Near Trinidad (CO)Greenfield——4.3 yrs52.5
EC Near Trinidad (CO)Greenfield——4.3 yrs52.4
UNKNOWN202883Substation-Adjacent115 kV100 MW4.3 yrs52.4
EC Near Trinidad (CO)Greenfield——4.3 yrs52.3
TAP203993Substation-Adjacent115 kV100 MW4.3 yrs52.3
TAP204043Substation-Adjacent115 kV100 MW4.3 yrs52.2
UNKNOWN204044Substation-Adjacent115 kV100 MW4.3 yrs52.2
EC Near Trinidad (CO)Greenfield——4.3 yrs52.2
EC Near Trinidad (CO)Greenfield——4.3 yrs52.0
EC Near Trinidad (CO)Greenfield——4.3 yrs52.0
EC Near Trinidad (CO)Greenfield——4.3 yrs51.0
DEAD HEADSubstation-Adjacent69 kV50 MW4.3 yrs50.4
TAP204045Substation-Adjacent69 kV50 MW4.3 yrs50.3
EL MOROSubstation-Adjacent69 kV50 MW4.3 yrs50.3
TAP206909Substation-Adjacent69 kV50 MW4.3 yrs50.0
EC Coal Las Animas CountyGreenfield——4.3 yrs49.7

Every scored site in Las Animas

All 42 sites, best first.

Las Animas datacenter FAQ

How many datacenter sites are in Las Animas?

42 scored datacenter candidate sites, averaging 49.8/100 DC Readiness. That is the 24th-most of 64 Colorado counties with five or more sites.

What is the highest-scoring datacenter site in Las Animas?

EC Coal Las Animas County · 5c4ba850 scores 55.9/100 DC Readiness, the highest of the 42 scored sites in Las Animas (a greenfield site).

Does Las Animas offer datacenter tax incentives?

Enterprise Zone sales tax exemptions; broadband equipment tax credit.

What is the natural-hazard risk in Las Animas?

FEMA's National Risk Index rates Las Animas as "Relatively Moderate" (score 25).

What are industrial electricity rates in Las Animas?

Average industrial electricity is 8.65¢/kWh and commercial is 15.09¢/kWh in Las Animas.

More in Colorado

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Las Animas, Colorado”, https://gridcensus.com/datacenter-sites/colorado/las-animas (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Las Animas, Colorado is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.