Tobe at 37.259, -103.600

Federal Excess

Las Animas, Colorado · SPP

DC Readiness
44.9
Fair / 100

At a glance

Tobe at 37.259, -103.600 is a federal excess datacenter candidate site in Las Animas, Colorado, scoring 44.9/100 DC Readiness — 41st of 42 scored sites in the county. It sits in the SPP grid region and the SAN ISABEL ELECTRIC ASSN, INC service territory, where interconnection has averaged 4.3 years from request to operation.

Power & interconnection

UtilitySAN ISABEL ELECTRIC ASSN, INCcooperativemoderate to large load · state default

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth33
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate16%
Withdrawal rate84%

Connectivity

Nearest IXPT5@Colorado Springs
IXP distance123.8 mi
Fiber providers1
Fiber coverage1.0%

Site characteristics

Acreage104 ac
Buildable load (est.)~42–104 MWland-based
Former useNavigation and Traffic Aids

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

Nearest datacenterDatacenter 00476609221
DC distance117.9 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity15.09¢/kWh
Industrial electricity8.65¢/kWh
Cooling degree days700
Heating degree days6,200
Land price / acre$1,005

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track TOBE

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Tobe at 37.259, -103.600 compare with other sites in Las Animas?

Tobe at 37.259, -103.600 ranks 41st of 42 scored candidate sites in Las Animas. Its 44.9/100 is roughly in line with the county average of 49.8. It is about 11% below the Colorado average of 50.6 and about 16% below the national average of 53.2.

Against the Colorado average, its strongest sub-score is speed to power (56 vs 53) and its weakest is fiber connectivity (32 vs 62). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Tobe at 37.259, -103.600 to power, fiber and other datacenters?

For connectivity, the nearest internet exchange facility is T5@Colorado Springs at 123.8 miles. 1 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Datacenter 00476609221, 117.9 miles away.

What are the flood, water and hazard risks at Tobe at 37.259, -103.600?

At the county level, FEMA's National Risk Index rates Las Animas "Relatively Moderate".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
56
Fiber connectivity12%
32
Energy cost10%
50
Water risk7%
36
Natural hazard6%
75
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
67
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Las Animas, ranked by DC Readiness.

Sites near Tobe at 37.259, -103.600
SiteTypeVoltageCapacityQueue waitScore
EC Coal Las Animas CountyGreenfield——4.3 yrs55.9
EC Near Trinidad (CO)Greenfield——4.3 yrs55.7
EC Near Trinidad (CO)Greenfield——4.3 yrs54.9
OZ Las AnimasGreenfield——4.3 yrs54.4
OZ Las AnimasGreenfield——4.3 yrs53.6
EC Near Trinidad (CO)Greenfield——4.3 yrs53.3
TAP208068Substation-Adjacent138 kV100 MW4.3 yrs52.8
OZ Las AnimasGreenfield——4.3 yrs52.6

Tobe at 37.259, -103.600: common questions

What is the DC Readiness score of Tobe at 37.259, -103.600?

Tobe at 37.259, -103.600 scores 44.9/100 on the GridCensus DC Readiness scale, rated fair. It ranks 41st of 42 scored sites in Las Animas. The Las Animas average is 49.8 and the Colorado average is 50.6.

Which electric utility serves Tobe at 37.259, -103.600?

SAN ISABEL ELECTRIC ASSN, INC (cooperative) holds the retail service territory that contains the site.

What grid region is Tobe at 37.259, -103.600 in?

Tobe at 37.259, -103.600 is in the SPP region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.

How far is Tobe at 37.259, -103.600 from an internet exchange?

The nearest internet exchange facility is T5@Colorado Springs, about 123.8 miles away; 1 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Tobe at 37.259, -103.600, Las Animas, CO”, https://gridcensus.com/datacenter-sites/colorado/las-animas/tobe-f6ffe834 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Tobe at 37.259, -103.600, Las Animas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.