Skip to content
Gridcensus

Datacenter Sites in Nevada, California

Nevada has 73 scored datacenter candidate sites averaging 42.3/100 DC Readiness, with a catalogued aggregate of 500 MW. FEMA rates local natural-hazard risk as "Relatively High".

At a glance

Nevada, California has 73 scored datacenter candidate sites averaging 42.3/100 DC Readiness, roughly in line with the California average of 45.4. It ranks 32nd of 58 California counties by number of sites and 48th by average score. The top-scoring site is BONNIE NOOK at 47.9/100.

73
Candidate sites
42.3/100
Avg DC Readiness
500 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Nevada

Site-selection context for Nevada

No
Datacenter tax incentive
29.25¢/kWh
Commercial electricity
22.93¢/kWh
Industrial electricity
6
Fiber providers
High
Water stress
$8,650
Land price / acre
1,000
Cooling degree days
2,500
Heating degree days
59°F
Mean annual temp

How does Nevada compare with other counties in California?

By number of scored sites, Nevada ranks 32nd of the 58 California counties with a county page, holding 0.9% of the state's 8,490 sites. Its average DC Readiness of 42.3/100 ranks 48th in the state and is about 20% below the national average of 53.0. Nationally it has the 494th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 0 score 55 or higher.

What types of datacenter sites are in Nevada?

Industrial sites are the most common (45, 62% of the county's inventory), followed by federal excess (12) and substation-adjacent (8). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Nevada?

Industrial electricity averages 22.93¢/kWh and commercial 29.25¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (48). WRI water stress is high. 6 fiber providers report service in the county. The climate runs 1,000 cooling degree days a year with a mean temperature of 59°F. Land is valued around $8,650 an acre.

By site type

Top datacenter sites in Nevada

Top datacenter sites in Nevada
SiteTypeVoltageCapacityQueue waitScore
BONNIE NOOKSubstation-Adjacent115 kV100 MW7.6 yrs47.9
DRUMSubstation-Adjacent115 kV100 MW7.6 yrs47.3
UNKNOWN300195Substation-Adjacent69 kV50 MW7.6 yrs45.4
TAMARACKSubstation-Adjacent69 kV50 MW7.6 yrs45.4
CISCO GROVESubstation-Adjacent69 kV50 MW7.6 yrs45.4
BRUNSWICKSubstation-Adjacent69 kV50 MW7.6 yrs45.3
PIKE CITYSubstation-Adjacent69 kV50 MW7.6 yrs45.1
ALLEGHANYSubstation-Adjacent69 kV50 MW7.6 yrs44.8
EC FFE Nevada CountyGreenfield——7.6 yrs43.8
Washoe ProjectFederal Excess——7.6 yrs43.7
Washoe ProjectFederal Excess——7.6 yrs43.7
Truckee Storage ProjectFederal Excess——7.6 yrs43.7
Washoe ProjectFederal Excess——7.6 yrs43.7
Truckee Storage ProjectFederal Excess——7.6 yrs43.6
Washoe ProjectFederal Excess——7.6 yrs43.5
Washoe ProjectFederal Excess——7.6 yrs43.5
Washoe ProjectFederal Excess——7.6 yrs43.4
Mine SiteFormer Mine——7.6 yrs43.3
Washoe ProjectFederal Excess——7.6 yrs43.1
Truckee Storage ProjectFederal Excess——7.6 yrs42.8
OZ NevadaGreenfield——7.6 yrs42.6
Washoe ProjectFederal Excess——7.6 yrs42.6
Mine SiteFormer Mine——7.6 yrs42.4
Washoe ProjectFederal Excess——7.6 yrs42.1
Former Bear River Mill, EastIndustrial——7.6 yrs42.1

Every scored site in Nevada

All 73 sites, best first.

Nevada datacenter FAQ

How many datacenter sites are in Nevada?

73 scored datacenter candidate sites, averaging 42.3/100 DC Readiness. That is the 32nd-most of 58 California counties with five or more sites.

What is the highest-scoring datacenter site in Nevada?

BONNIE NOOK scores 47.9/100 DC Readiness, the highest of the 73 scored sites in Nevada (a substation-adjacent site).

Does Nevada offer datacenter tax incentives?

No datacenter-specific tax incentive is on record for Nevada in the GridCensus county dataset.

What is the natural-hazard risk in Nevada?

FEMA's National Risk Index rates Nevada as "Relatively High" (score 48).

What are industrial electricity rates in Nevada?

Average industrial electricity is 22.93¢/kWh and commercial is 29.25¢/kWh in Nevada.

More in California

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 13, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Nevada, California”, https://gridcensus.com/datacenter-sites/california/nevada (data as of November 13, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Nevada, California is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.