Lawrence has 13 scored datacenter candidate sites averaging 51.7/100 DC Readiness, with a catalogued aggregate of 600 MW. FEMA rates local natural-hazard risk as "Relatively High".

At a glance

Lawrence, Arkansas has 13 scored datacenter candidate sites averaging 51.7/100 DC Readiness, roughly in line with the Arkansas average of 53.6. It ranks 46th of 74 Arkansas counties by number of sites and 53rd by average score. The top-scoring site is Substation-Adjacent site · 97150477 at 55.8/100.

13
Candidate sites
51.7/100
Avg DC Readiness
600 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 13 in Lawrence

Site-selection context for Lawrence

No
Datacenter tax incentive
11.70¢/kWh
Commercial electricity
9.61¢/kWh
Industrial electricity
4
Fiber providers
Low
Water stress
$4,609
Land price / acre
1,900
Cooling degree days
3,400
Heating degree days
60°F
Mean annual temp

How does Lawrence compare with other counties in Arkansas?

By number of scored sites, Lawrence ranks 46th of the 74 Arkansas counties with a county page, holding 0.8% of the state's 1,651 sites. Its average DC Readiness of 51.7/100 ranks 53rd in the state and is roughly in line with the national average of 53.0. Nationally it has the 2184th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 4 score 55 or higher.

What types of datacenter sites are in Lawrence?

Greenfield sites are the most common (4, 31% of the county's inventory), followed by substation-adjacent (4) and industrial (3). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Lawrence?

Industrial electricity averages 9.61¢/kWh and commercial 11.70¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (38). WRI water stress is low. 4 fiber providers report service in the county. The climate runs 1,900 cooling degree days a year with a mean temperature of 60°F. Land is valued around $4,609 an acre.

By site type

Top datacenter sites in Lawrence

Top datacenter sites in Lawrence
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN121108Substation-Adjacent161 kV100 MW4.3 yrs55.8
JONESBORO SPASubstation-Adjacent161 kV100 MW4.3 yrs55.8
UNKNOWN121109Substation-Adjacent161 kV100 MW4.3 yrs55.7
UNKNOWN108089Substation-Adjacent161 kV100 MW4.3 yrs55.7
EC FFE Lawrence CountyGreenfield——4.3 yrs53.8
OZ LawrenceGreenfield——4.3 yrs50.9
Greenfield (UNKNOWN121108 - JONESBORO SPA)Greenfield161 kV100 MW4.3 yrs49.4
Greenfield (UNKNOWN107787 - JONESBORO SPA)Greenfield161 kV100 MW4.3 yrs49.4
WALNUT RIDGE, AR (REGNL)Federal Excess——4.3 yrs49.3
Walnut Ridge Regional AirportIndustrial——4.3 yrs49.1
WALNUT RIDGE, AR (REGNL)Federal Excess——4.3 yrs49.1
Undeveloped ParcelIndustrial——4.3 yrs49.1
Imboden PropeertyIndustrial——4.3 yrs49.0

Every scored site in Lawrence

All 13 sites, best first.

Lawrence datacenter FAQ

How many datacenter sites are in Lawrence?

13 scored datacenter candidate sites, averaging 51.7/100 DC Readiness. That is the 46th-most of 74 Arkansas counties with five or more sites.

What is the highest-scoring datacenter site in Lawrence?

Substation-Adjacent site · 97150477 scores 55.8/100 DC Readiness, the highest of the 13 scored sites in Lawrence (a substation-adjacent site).

Does Lawrence offer datacenter tax incentives?

No datacenter-specific tax incentive is on record for Lawrence in the GridCensus county dataset.

What is the natural-hazard risk in Lawrence?

FEMA's National Risk Index rates Lawrence as "Relatively High" (score 38).

What are industrial electricity rates in Lawrence?

Average industrial electricity is 9.61¢/kWh and commercial is 11.70¢/kWh in Lawrence.

More in Arkansas

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Lawrence, Arkansas”, https://gridcensus.com/datacenter-sites/arkansas/lawrence (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Lawrence, Arkansas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.