Skip to content
Gridcensus

OZ Lawrence

Greenfield

Lawrence, Arkansas · MISO

DC Readiness
51.5
Fair / 100

OZ Lawrence is a greenfield datacenter candidate site in Lawrence, Arkansas, interconnecting through MISO. It screens at 51.5/100 DC Readiness and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

LMP zoneMISO_ARKANSAS
Wholesale LMP$30.14/MWh
Utility commercial rate0.12¢/kWh
UtilityENTERGY ARKANSAS LLCinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookFavorable
≈ 1.4 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth136
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPARE-ON Forrest City
IXP distance73.3 mi
Fiber providers4
Fiber coverage89.1%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance405.8 mi

Site characteristics

Site typeGreenfield
Land contactLawrence County Assessor
Land owner typeprivate
Buildability65.0/100
Land cover (NLCD)Cultivated Crops

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)0.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score62/100
Construction cost index104.6 (avg 100)

Location context

Nearest datacenterARE-ON Forrest City
DC distance73.3 mi
Nearest rail0.8 mi
Nearest gas pipeline1.9 mi
Nearest fiber route228.5 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveNo
Commercial electricity11.70¢/kWh
Industrial electricity9.61¢/kWh
Cooling degree days1,900
Heating degree days3,400
Land price / acre$4,609

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track OZ Lawrence

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
52
Fiber connectivity12%
30
Energy cost10%
89
Water risk7%
86
Natural hazard6%
62
Buildability7%
65
Labor market4%
50
DC cluster4%
20
Land / acreage3%
49
Construction cost3%
63
Gas pipeline2%
94
Tax incentive1%
0
Climate / cooling1%
30

Nearby comparable sites

Other scored datacenter candidate sites in Lawrence, ranked by DC Readiness.

Sites near OZ Lawrence
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN121108Substation-Adjacent161 kV100 MW2.8 yrs55.1
JONESBORO SPASubstation-Adjacent161 kV100 MW2.8 yrs55.1
UNKNOWN121109Substation-Adjacent161 kV100 MW2.8 yrs55.1
UNKNOWN108089Substation-Adjacent161 kV100 MW2.8 yrs55.0
EC FFE Lawrence CountyGreenfield1.4 yrs54.4
Greenfield (UNKNOWN107787 - JONESBORO SPA)Greenfield161 kV100 MW2.8 yrs48.7
Greenfield (UNKNOWN121108 - JONESBORO SPA)Greenfield161 kV100 MW2.8 yrs48.7
WALNUT RIDGE, AR (REGNL)Federal Excess2.8 yrs48.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for OZ Lawrence, Lawrence. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.