TESLA Power Project
BrownfieldNot yet established, Alameda, California · Pacific Gas & Electric Co.
TESLA Power Project is a natural gas plant in Not yet established, Alameda, California. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 1,322 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby datacenter candidate sites
Scored candidate sites near TESLA Power Project, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| TESLA Power Project | Brownfield | CA | Alameda County | 500 kV | 1,322 MW | 5.7 yrs | 64.6 |
| SC 1 Data Center, Phase 2 | Brownfield | CA | Santa Clara County | 60 kV | 2 MW | 5.7 yrs | 56.5 |
| LOS ESTEROS | Substation-Adjacent | CA | Alameda County | 230 kV | 300 MW | 8.2 yrs | 56.2 |
| FREMONT | Substation-Adjacent | CA | Alameda County | 230 kV | 300 MW | 8.2 yrs | 55.9 |
| COUNTRY CLUB | Substation-Adjacent | CA | San Joaquin County | 230 kV | 300 MW | 8.2 yrs | 54.8 |
| TESLA | Substation-Adjacent | CA | Alameda County | 500 kV | 1,000 MW | 8.2 yrs | 54.1 |
| STAGG | Substation-Adjacent | CA | San Joaquin County | 230 kV | 300 MW | 8.2 yrs | 53.7 |
| TRACY | Substation-Adjacent | CA | San Joaquin County | 500 kV | 1,000 MW | 8.2 yrs | 53.6 |
Nearby internet exchanges
- Hurricane Electric Fremont 2Fremont, CA · 304 networks
- Equinix SV1/SV5/SV10 - Silicon Valley, San JoseSan Jose, CA · 280 networks
- Equinix SV8 - Silicon Valley, Palo AltoPalo Alto, CA · 68 networks
- CoreSite - San Jose (SV1)San Jose, CA · 56 networks
See all datacenter sites in California →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TESLA Power Project, Not yet established, Alameda, California. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.