SC 1 Data Center, Phase 2

Brownfield

Santa Clara, Santa Clara, California · Xeres Ventures LLC

Legacy capacity
2
MW

SC 1 Data Center, Phase 2 is a oil plant in Santa Clara, Santa Clara, California, retired 2020-04-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 2 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useoil plant
Site typeretired_plant
Existing capacity2 MW
Retirement date2020-04-01
EIA plant ID#59074

Grid hookup & remediation

Nearest substation0.1 mi
Operator address555 Reed Street, Santa Clara, CA, 95050
Why this site is datacenter-attractive: a oil plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Santa Clara County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)1,025,254
IT / tech employment13,228
Construction employment51,935
Land value$13,303/acre

Power economics & interconnection

Commercial power rate28.22¢/kWh
Industrial power rate21.85¢/kWh
Load growth (FERC-714)1.3%

Water & cooling

Water stressHigh
Public water supply194.6 MGD
Industrial water use12.5 MGD
Cooling degree days1,000
Mean annual temp59°F

Hazard, flood & connectivity

FEMA risk index48.0 · Relatively High
Fiber providers18 · 49% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Nearby brownfield & retired-generation sites

A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near SC 1 Data Center, Phase 2 — the environmental neighborhood, ranked by legacy grid capacity.

SiteFormer useLegacy MWDistanceCleanup status
TESLA Power Projectnatural gas plant1,32232.5 mi—
SJ/SC WPCPnatural gas plant125.0 mi—
Santa Clara Cogennatural gas plant80.2 mi—
Waste Management Tri-Cities LFGTEnatural gas plant59.7 mi—
City of Palo Altonatural gas plant410.5 mi—
Lawrence Livermore National Laboratoryformer superfund site324.6 micleanup_complete
University of California Santa Cruznatural gas plant325.8 mi—
Altamont Gas Recoverynatural gas plant331.2 mi—

Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.

Get alerts

Track SC 1 Data Center, Phase 2

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near SC 1 Data Center, Phase 2, ranked by DC Readiness.

Candidate sites near SC 1 Data Center, Phase 2
SiteTypeStateCountyVoltageCapacityQueue waitScore
TESLA Power ProjectBrownfieldCAAlameda County500 kV1,322 MW5.7 yrs64.1
METCALF 1Substation-AdjacentCASanta Clara County500 kV1,000 MW8.2 yrs59.6
NEWARK DISTRIBUTIONSubstation-AdjacentCAAlameda County230 kV300 MW8.2 yrs57.4
Juniper Networks SunnyvaleBrownfieldCAAlameda County115 kV1 MW5.7 yrs56.7
TESLASubstation-AdjacentCAAlameda County500 kV1,000 MW8.2 yrs56.4
S.L.A.C.Substation-AdjacentCASan Mateo County230 kV300 MW8.2 yrs56.0
Extreme San IgnacioBrownfieldCASanta Clara County115 kV1 MW5.7 yrs55.9
SC 1 Data Center, Phase 2BrownfieldCASanta Clara County60 kV2 MW5.7 yrs55.9

Nearby internet exchanges

See all datacenter sites in California →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

Every site and score for SC 1 Data Center, Phase 2, Santa Clara, Santa Clara, California is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.