SC 1 Data Center, Phase 2

Brownfield

Santa Clara, Santa Clara, California · Xeres Ventures LLC

Legacy capacity
2
MW

SC 1 Data Center, Phase 2 is a oil plant in Santa Clara, Santa Clara, California, retired 2020-04-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 2 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useoil plant
Site typeretired_plant
Existing capacity2 MW
Retirement date2020-04-01
EIA plant ID#59074

Grid hookup & remediation

Nearest substation0.1 mi
Operator address555 Reed Street, Santa Clara, CA, 95050
Why this site is datacenter-attractive: a oil plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Santa Clara County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)1,025,254
IT / tech employment13,228
Construction employment51,935
Land value$13,303/acre

Power economics & interconnection

Commercial power rate28.22¢/kWh
Industrial power rate21.85¢/kWh
Load growth (FERC-714)1.3%

Water & cooling

Water stressHigh
Public water supply194.6 MGD
Industrial water use12.5 MGD
Cooling degree days1,000
Mean annual temp59°F

Hazard, flood & connectivity

FEMA risk index48.0 · Relatively High
Fiber providers18 · 49% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Nearby brownfield & retired-generation sites

A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near SC 1 Data Center, Phase 2 — the environmental neighborhood, ranked by legacy grid capacity.

SiteFormer useLegacy MWDistanceCleanup status
TESLA Power Projectnatural gas plant1,32232.5 mi—
SJ/SC WPCPnatural gas plant125.0 mi—
Santa Clara Cogennatural gas plant80.2 mi—
Waste Management Tri-Cities LFGTEnatural gas plant59.7 mi—
City of Palo Altonatural gas plant410.5 mi—
Lawrence Livermore National Laboratoryformer superfund site324.6 micleanup_complete
University of California Santa Cruznatural gas plant325.8 mi—
Altamont Gas Recoverynatural gas plant331.2 mi—

Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.

Get alerts

Track SC 1 Data Center, Phase 2

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near SC 1 Data Center, Phase 2, ranked by DC Readiness.

Candidate sites near SC 1 Data Center, Phase 2
SiteTypeStateCountyVoltageCapacityQueue waitScore
TESLA Power ProjectBrownfieldCAAlameda County500 kV1,322 MW5.7 yrs66.5
METCALF 1Substation-AdjacentCASanta Clara County500 kV1,000 MW8.2 yrs61.9
NEWARK DISTRIBUTIONSubstation-AdjacentCAAlameda County230 kV300 MW8.2 yrs58.9
TESLASubstation-AdjacentCAAlameda County500 kV1,000 MW8.2 yrs58.6
S.L.A.C.Substation-AdjacentCASan Mateo County230 kV300 MW8.2 yrs58.2
Juniper Networks SunnyvaleBrownfieldCAAlameda County115 kV1 MW5.7 yrs58.1
EASTSHORESubstation-AdjacentCAAlameda County230 kV300 MW8.2 yrs58.1
LOS ESTEROSSubstation-AdjacentCAAlameda County230 kV300 MW8.2 yrs58.0

Nearby internet exchanges

See all datacenter sites in California →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for SC 1 Data Center, Phase 2, Santa Clara, Santa Clara, California. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.