Santa Rita Jail Hybrid

Brownfield

Dublin, Alameda, California · County of Alameda GSA

Legacy capacity
1
MW

Santa Rita Jail Hybrid is a natural gas plant in Dublin, Alameda, California, retired 2013-12-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 1 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity1 MW
Retirement date2013-12-01
EIA plant ID#58625

Grid hookup & remediation

Nearest substation2.4 mi
OperatorCounty of Alameda GSA
Operator address5325 Broder Blvd, Dublin, CA, 94568
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Santa Rita Jail Hybrid, ranked by DC Readiness.

Candidate sites near Santa Rita Jail Hybrid
SiteTypeStateCountyVoltageCapacityQueue waitScore
TESLA Power ProjectBrownfieldCAAlameda County500 kV1,322 MW5.7 yrs64.5
LOS ESTEROSSubstation-AdjacentCAAlameda County230 kV300 MW5.7 yrs64.1
LAS POSITASSubstation-AdjacentCAAlameda County230 kV300 MW5.7 yrs62.8
ROSSMOORSubstation-AdjacentCAContra Costa County230 kV300 MW5.7 yrs62.7
CASTRO VALLEYSubstation-AdjacentCAAlameda County230 kV300 MW5.7 yrs62.4
VINEYARDSubstation-AdjacentCAAlameda County230 kV300 MW5.7 yrs62.2
S.L.A.C.Substation-AdjacentCASan Mateo County230 kV300 MW5.7 yrs62.0
NEWARKSubstation-AdjacentCAAlameda County230 kV300 MW5.7 yrs61.8

Nearby internet exchanges

See all datacenter sites in California

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Santa Rita Jail Hybrid, Dublin, Alameda, California. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.