At a glance

SALINAS is a 115 kV electric substation in California on PACIFIC GAS & ELECTRIC COMPANY's transmission network, recorded in the HIFLD transmission dataset. 6 transmission lines connect to it. 428 of California's 3,003 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is MOSS LANDING in Santa Cruz County, with a DC Readiness score of 62/100.

SALINAS is an electric transmission substation in California, on PACIFIC GAS & ELECTRIC COMPANY's transmission network. It is classified as sub-transmission (115 kv) and connects 6 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage60 kV
Voltage classSub-transmission (115 kV)
Connected lines6

Ownership

Line owner (most lines)PACIFIC GAS & ELECTRIC COMPANY
Coordinates36.6820, -121.6514

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#303545115 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE15.7 mi
#307562115 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE12.1 mi
#30329660 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE1.3 mi
#30435060 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE3.1 mi
#30509860 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE2.4 mi
#31051860 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE4.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of SALINAS, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near SALINAS substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MOSS LANDINGSubstation-AdjacentCASanta Cruz County500 kV1,000 MW7.6 yrs62.3
Fort OrdBrownfieldCASanta Cruz115 kV—7.6 yrs52.6
EC Near Dynegy Moss Landing Power Plant HybridGreenfieldCAMonterey——7.6 yrs50.5
EC Near University of California Santa CruzGreenfieldCASanta Cruz——7.6 yrs50.5
LLAGASSubstation-AdjacentCASanta Clara County115 kV100 MW7.6 yrs50.3
GILROY FOODSubstation-AdjacentCASanta Clara County115 kV100 MW7.6 yrs50.2
ROB ROYSubstation-AdjacentCASanta Cruz County115 kV100 MW7.6 yrs50.0
CAMP EVERSSubstation-AdjacentCASanta Cruz County115 kV100 MW7.6 yrs49.9

How does SALINAS compare with other substations in California?

California has 4,260 substation records in HIFLD, of which 3,003 carry a station name; the rest are unnamed tap points, risers and line ends. 697 named substations in the state are in SALINAS's 115–229 kV band (23% of named stations). 428 sit in a higher band. 44 named substations in California operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 69 kV.

Who owns the transmission lines at SALINAS?

The 6 connected lines listed above are owned by PACIFIC GAS & ELECTRIC COMPANY. Line voltages range from 60 kV to 115 kV. Their combined recorded length is about 38.7 miles.

How do candidate sites near SALINAS score?

The 8 highest-scoring candidate sites within about 25 miles range from 50 to 62 on the 0–100 DC Readiness scale. They fall in Santa Cruz County, Santa Cruz, Monterey, Santa Clara County. The California average across 8,490 scored sites is 45.4. 1,573 of those California sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is SALINAS substation?

SALINAS has a maximum voltage of 115 kV and a minimum of 60 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so SALINAS is at the national midpoint.

How many transmission lines connect to SALINAS substation?

6 transmission lines terminate at or pass through SALINAS in the HIFLD line data. The connected lines listed here run at 115 kV, 60 kV. Together the listed lines cover about 38.7 miles.

Who owns SALINAS substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at SALINAS belong to PACIFIC GAS & ELECTRIC COMPANY. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is SALINAS substation located?

SALINAS is in California at 36.6820, -121.6514. The datacenter candidate sites closest to it are in Santa Cruz County, Santa Cruz, Monterey.

Are there datacenter candidate sites near SALINAS substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of SALINAS. The highest-scoring is MOSS LANDING at 62/100. Across California, the average DC Readiness score is 45.4.

Other 115 kV substations in California

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “SALINAS substation, California”, https://gridcensus.com/substations/california/salinas-0e08ec4e (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for SALINAS substation, California is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.