Skip to content
Gridcensus

CALECTRIC

Substation

California · AZUSA LIGHT & POWER

Max voltage
115
kV

At a glance

CALECTRIC is a 115 kV electric substation in California on AZUSA LIGHT & POWER's transmission network, recorded in the HIFLD transmission dataset. 8 transmission lines connect to it. 428 of California's 3,003 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is VALLEY in Orange County, with a DC Readiness score of 62/100.

CALECTRIC is an electric transmission substation in California, on AZUSA LIGHT & POWER's transmission network. It is classified as sub-transmission (115 kv) and connects 8 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage66 kV
Voltage classSub-transmission (115 kV)
Connected lines8

Ownership

Line owner (most lines)AZUSA LIGHT & POWER
Coordinates34.0934, -117.3172

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#313813115 kVSOUTHERN CALIFORNIA EDISONIN SERVICE5.6 mi
#302438115 kVAZUSA LIGHT & POWERIN SERVICE2.6 mi
#307624115 kV—IN SERVICE5.1 mi
#310553115 kV—IN SERVICE8.0 mi
#311879115 kV—IN SERVICE3.0 mi
#301899115 kV—IN SERVICE8.0 mi
#313810115 kVSOUTHERN CALIFORNIA EDISONIN SERVICE16.9 mi
#31188666 kVAZUSA LIGHT & POWERIN SERVICE3.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of CALECTRIC, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near CALECTRIC substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
VALLEYSubstation-AdjacentCAOrange County500 kV1,000 MW7.6 yrs62.3
INLAND EMPIRESubstation-AdjacentCAOrange County500 kV1,000 MW7.6 yrs62.3
SAN BERNARDINOSubstation-AdjacentCAOrange County500 kV1,000 MW7.6 yrs60.2
MIRA LOMASubstation-AdjacentCAOrange County500 kV1,000 MW7.6 yrs59.2
LINDESubstation-AdjacentCAOrange County500 kV1,000 MW7.6 yrs58.9
RANCHO VISTASubstation-AdjacentCAOrange County500 kV1,000 MW7.6 yrs58.8
LUGOSubstation-AdjacentCALos Angeles County500 kV1,000 MW7.6 yrs57.6
Amazon San BernardinoBrownfieldCAOrange County500 kV1 MW7.6 yrs57.2

How does CALECTRIC compare with other substations in California?

California has 4,260 substation records in HIFLD, of which 3,003 carry a station name; the rest are unnamed tap points, risers and line ends. 697 named substations in the state are in CALECTRIC's 115–229 kV band (23% of named stations). 428 sit in a higher band. 44 named substations in California operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 69 kV.

Who owns the transmission lines at CALECTRIC?

The 8 connected lines listed above are owned by SOUTHERN CALIFORNIA EDISON, AZUSA LIGHT & POWER. Line voltages range from 66 kV to 115 kV. Their combined recorded length is about 52.3 miles.

How do candidate sites near CALECTRIC score?

The 8 highest-scoring candidate sites within about 25 miles range from 57 to 62 on the 0–100 DC Readiness scale. They fall in Orange County, Los Angeles County. The California average across 8,490 scored sites is 45.4. 1,573 of those California sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is CALECTRIC substation?

CALECTRIC has a maximum voltage of 115 kV and a minimum of 66 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so CALECTRIC is at the national midpoint.

How many transmission lines connect to CALECTRIC substation?

8 transmission lines terminate at or pass through CALECTRIC in the HIFLD line data. The connected lines listed here run at 115 kV, 66 kV. Together the listed lines cover about 52.3 miles.

Who owns CALECTRIC substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at CALECTRIC belong to AZUSA LIGHT & POWER, and others to SOUTHERN CALIFORNIA EDISON. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is CALECTRIC substation located?

CALECTRIC is in California at 34.0934, -117.3172. The datacenter candidate sites closest to it are in Orange County, Los Angeles County.

Are there datacenter candidate sites near CALECTRIC substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of CALECTRIC. The highest-scoring is VALLEY at 62/100. Across California, the average DC Readiness score is 45.4.

Other 115 kV substations in California

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “CALECTRIC substation, California”, https://gridcensus.com/substations/california/calectric-287cb153 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for CALECTRIC substation, California is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.