Skip to content
Gridcensus

Fort Ord

Brownfield

Santa Cruz, California · CAISO

DC Readiness
51.5
Fair / 100

Fort Ord is a brownfield datacenter candidate site in Santa Cruz, California, interconnecting through CAISO. It screens at 51.5/100 DC Readiness and a 8.2 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationSALINAS
Substation distance1.2 mi
Substation voltage115 kV
Utility commercial rate0.30¢/kWh

Speed to power

ISO / RTO regionCAISO
Queue depth480
Avg queue wait8.2 yrs

Connectivity

Nearest IXPEquinix SV1/SV5/SV10 - Silicon Valley, San Jose
IXP distance39.1 mi
Fiber providers10
Fiber coverage33.7%
Nearest cloud providerOracle
Nearest cloud regionus-sanjose-1
Cloud region distance47.1 mi

Site characteristics

Site typeBrownfield
Acreage27,828 ac
Land contactState Environmental Cleanup Program
Land owner typeprivate
Buildability75.0/100
Former usesuperfund
Cleanup statuscleanup_complete

Risk & environment

Flood zoneZone X
Water stress (WRI)3.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteHIGASHI FARMS INC
Hazard sub-score42/100
Construction cost index94.9 (avg 100)

Location context

Nearest datacenterEquinix SV10
DC distance39.1 mi
Nearest rail1.3 mi
Nearest gas pipeline0.8 mi
County hazard (FEMA NRI)Relatively High (48)
DC tax incentiveNo
Commercial electricity29.59¢/kWh
Industrial electricity22.82¢/kWh
Cooling degree days1,000
Heating degree days2,500
Land price / acre$38,401

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
44
Speed to power15%
35
Fiber connectivity12%
60
Energy cost10%
63
Water risk8%
53
Natural hazard8%
42
Buildability7%
75
Labor market4%
50
DC cluster4%
50
Land / acreage3%
58
Construction cost3%
71
Gas pipeline2%
97
Tax incentive2%
0
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in Santa Cruz, ranked by DC Readiness.

Sites near Fort Ord
SiteTypeVoltageCapacityQueue waitScore
MOSS LANDINGSubstation-Adjacent500 kV1,000 MW8.2 yrs55.6
EC Near University of California Santa CruzGreenfield5.7 yrs49.8
EC Near University of California Santa CruzGreenfield5.7 yrs48.9
EC Near University of California Santa CruzGreenfield5.7 yrs48.9
Marina Landfill GasBrownfield115 kV3 MW5.7 yrs48.0
EC Near University of California Santa CruzGreenfield5.7 yrs47.8
EC Near University of California Santa CruzGreenfield5.7 yrs47.2
University of California Santa CruzBrownfield60 kV3 MW5.7 yrs47.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Fort Ord, Santa Cruz. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.