Datacenter Sites in Parker, Texas
Parker has 36 scored datacenter candidate sites averaging 57.4/100 DC Readiness, with a catalogued aggregate of 6,000 MW. FEMA rates local natural-hazard risk as "Very High". The county has a datacenter tax incentive on record.
At a glance
Parker, Texas has 36 scored datacenter candidate sites averaging 57.4/100 DC Readiness, roughly in line with the Texas average of 56.4. It ranks 45th of 234 Texas counties by number of sites and 46th by average score. The top-scoring site is Substation-Adjacent site · 321f1a2c at 65.7/100.
Site-selection context for Parker
Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.
How does Parker compare with other counties in Texas?
By number of scored sites, Parker ranks 45th of the 234 Texas counties with a county page, holding 0.5% of the state's 6,839 sites. Its average DC Readiness of 57.4/100 ranks 46th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1072nd-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 26 score 55 or higher.
What types of datacenter sites are in Parker?
Substation-Adjacent sites are the most common (19, 53% of the county's inventory), followed by greenfield (12) and former mine (4). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.
What are power cost, hazard, water and fiber conditions in Parker?
Industrial electricity averages 12.22¢/kWh and commercial 11.63¢/kWh. FEMA's National Risk Index rates the county "Very High" (55). WRI water stress is medium-high. 10 fiber providers report service in the county. The climate runs 2,600 cooling degree days a year with a mean temperature of 65°F. Land is valued around $6,899 an acre.
By site type
Top datacenter sites in Parker
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| UNKNOWN306159 | Substation-Adjacent | 345 kV | 600 MW | 3.5 yrs | 65.7 |
| UNKNOWN304939 | Substation-Adjacent | 345 kV | 600 MW | 3.5 yrs | 64.9 |
| PARKER | Substation-Adjacent | 345 kV | 600 MW | 3.5 yrs | 64.9 |
| UNKNOWN301910 | Substation-Adjacent | 345 kV | 600 MW | 3.5 yrs | 64.8 |
| EC Near Westside Landfill Gas Recovery | Greenfield | — | — | 3.5 yrs | 63.4 |
| EC Near Westside Landfill Gas Recovery | Greenfield | — | — | 3.5 yrs | 62.0 |
| EC Near Westside Landfill Gas Recovery | Greenfield | — | — | 3.5 yrs | 60.7 |
| EC Near Westside Landfill Gas Recovery | Greenfield | — | — | 3.5 yrs | 60.5 |
| CENTERPOINT | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 59.4 |
| UNKNOWN304078 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 59.2 |
| UNKNOWN306400 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 58.9 |
| UNKNOWN301321 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 58.9 |
| UNKNOWN308296 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 58.7 |
| UNKNOWN306345 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 58.4 |
| UNKNOWN303077 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 58.4 |
| UNKNOWN310324 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 58.2 |
| Greenfield (UNKNOWN302829 - None) | Greenfield | 345 kV | 600 MW | 3.5 yrs | 58.2 |
| UNKNOWN308853 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 58.0 |
| EC Near Westside Landfill Gas Recovery | Greenfield | — | — | 3.5 yrs | 58.0 |
| UNKNOWN304740 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 58.0 |
| UNKNOWN309234 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 57.9 |
| UNKNOWN300656 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 57.8 |
| UNKNOWN309887 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 57.7 |
| Greenfield (UNKNOWN302829 - None) | Greenfield | 345 kV | 600 MW | 3.5 yrs | 56.4 |
| Greenfield (UNKNOWN300996 - None) | Greenfield | 345 kV | 600 MW | 3.5 yrs | 56.2 |
Every scored site in Parker
All 36 sites, best first.
- Substation-Adjacent site · 321f1a2c · 65.7
- Substation-Adjacent site · c6b6e398 · 64.9
- PARKER · 64.9
- Substation-Adjacent site · 626f6902 · 64.8
- EC Near Westside Landfill Gas Recovery · 5eb92474 · 63.4
- EC Near Westside Landfill Gas Recovery · 95eedd7c · 62.0
- EC Near Westside Landfill Gas Recovery · 3ceb33fb · 60.7
- EC Near Westside Landfill Gas Recovery · 07595d1d · 60.5
- CENTERPOINT · 59.4
- Substation-Adjacent site · b5586e05 · 59.2
- Substation-Adjacent site · 17e4eb79 · 58.9
- Substation-Adjacent site · 8aad0b3f · 58.9
- Substation-Adjacent site · 5c3a13bf · 58.7
- Substation-Adjacent site · fd6a4951 · 58.4
- Substation-Adjacent site · a7df28b1 · 58.4
- Substation-Adjacent site · eb4a57ef · 58.2
- Greenfield (UNKNOWN302829 - None) · ff639bfa · 58.2
- Substation-Adjacent site · 96cc241c · 58.0
- EC Near Westside Landfill Gas Recovery · 52b7cb16 · 58.0
- Substation-Adjacent site · ce0e6122 · 58.0
- Substation-Adjacent site · e93b399f · 57.9
- Substation-Adjacent site · 1c6d9a3d · 57.8
- Substation-Adjacent site · 30b315fc · 57.7
- Greenfield (UNKNOWN302829 - None) · cc74d1af · 56.4
- Greenfield (UNKNOWN300996 - None) · 56.2
- Substation-Adjacent site · 3bbc0361 · 55.9
- Substation-Adjacent site · 75310f6f · 54.6
- Mine Site · 92edcf01 · 52.8
- Greenfield (None - None) · 548e58bc · 52.2
- Mine Site · 665131b4 · 51.9
- Mine Site · 1bd1d90d · 51.9
- Mine Site · 2873dd2b · 51.9
- Fort Wolters Criminal Justice · 50.9
- Greenfield (UNKNOWN309758 - None) · 50.7
- Greenfield (None - None) · 4266b788 · 50.7
- Greenfield (UNKNOWN303962 - None) · 46.6
Parker datacenter FAQ
How many datacenter sites are in Parker?
36 scored datacenter candidate sites, averaging 57.4/100 DC Readiness. That is the 45th-most of 234 Texas counties with five or more sites.
What is the highest-scoring datacenter site in Parker?
Substation-Adjacent site · 321f1a2c scores 65.7/100 DC Readiness, the highest of the 36 scored sites in Parker (a substation-adjacent site).
Does Parker offer datacenter tax incentives?
Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.
What is the natural-hazard risk in Parker?
FEMA's National Risk Index rates Parker as "Very High" (score 55).
What are industrial electricity rates in Parker?
Average industrial electricity is 12.22¢/kWh and commercial is 11.63¢/kWh in Parker.
More in Texas
- All datacenter sites in Texas· 6,839 sites
- Operating datacenters in Texas
- Electric substations in Texas
- Harris County· 348 sites · avg 57.3
- Dallas County· 308 sites · avg 61.3
- Tarrant County· 289 sites · avg 59.4
- Travis County· 203 sites · avg 59.8
- El Paso County· 172 sites · avg 54.5
- Bexar County· 166 sites · avg 61.7
- Substation-Adjacent sites in Texas
- Greenfield sites in Texas
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Datacenter candidate sites in Parker, Texas”, https://gridcensus.com/datacenter-sites/texas/parker (data as of November 12, 2026).
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
Every site and score for Parker, Texas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.