Greenfield (UNKNOWN303962 - None)

Greenfield

Parker, California · ERCOT

DC Readiness
46.6
Fair / 100

At a glance

Greenfield (UNKNOWN303962 - None) is a greenfield datacenter candidate site in Parker, California, scoring 46.6/100 DC Readiness — 36th of 36 scored sites in the county. Its nearest substation is UNKNOWN303962. It sits in the ERCOT grid region, where interconnection has averaged 7.6 years from request to operation. GridCensus catalogs 100 MW of candidate capacity here.

Power & interconnection

Nearest substationUNKNOWN303962
Substation voltage138 kV
Available capacity100 MW

Speed to power

Texas note: Since August 3, 2026, ERCOT has paused approvals to energize new datacenter and crypto-mining loads of 75 MW or more until a verification audit and a community impact review are complete; both reports are due to the Public Utility Commission of Texas by December 10, 2026. ERCOT speed-to-power scores here were set before the pause and do not reflect it. ERCOT board update.

Interconnection outlookConstrained
≈ 8.3 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionERCOT
Queue depth227
Avg queue wait7.6 yrs
Recent queue wait8.3 yrs
Completion rate11%
Withdrawal rate89%

Connectivity

Nearest IXPAlpheus Fort Worth (307 W 7th St)
IXP distance33.5 mi
Fiber providers10
Fiber coverage50.9%

Site characteristics

Site typeGreenfield

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score45/100

Location context

Nearest datacenterMeta Fort Worth
DC distance33.4 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.63¢/kWh
Industrial electricity12.22¢/kWh
Cooling degree days2,600
Heating degree days1,800
Land price / acre$6,899

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Greenfield (UNKNOWN303962 - None)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Greenfield (UNKNOWN303962 - None) compare with other sites in Parker?

Greenfield (UNKNOWN303962 - None) ranks 36th of 36 scored candidate sites in Parker. Its 46.6/100 is about 19% below the county average of 57.4. It is roughly in line with the California average of 45.4 and about 12% below the national average of 53.2.

Against the California average, its strongest sub-score is water (44 vs 27) and its weakest is fiber connectivity (57 vs 66). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Greenfield (UNKNOWN303962 - None) to power, fiber and other datacenters?

The nearest mapped substation, UNKNOWN303962, is the closest grid connection point on record and operates at 138 kV. For connectivity, the nearest internet exchange facility is Alpheus Fort Worth (307 W 7th St) at 33.5 miles. 10 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Meta Fort Worth, 33.4 miles away.

What are the flood, water and hazard risks at Greenfield (UNKNOWN303962 - None)?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk). At the county level, FEMA's National Risk Index rates Parker "Very High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
58
Fiber connectivity12%
57
Energy cost10%
50
Water risk7%
44
Natural hazard6%
45
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Parker, ranked by DC Readiness.

Sites near Greenfield (UNKNOWN303962 - None)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN306159Substation-Adjacent345 kV600 MW3.5 yrs65.7
PARKERSubstation-Adjacent345 kV600 MW3.5 yrs64.9
UNKNOWN304939Substation-Adjacent345 kV600 MW3.5 yrs64.9
UNKNOWN301910Substation-Adjacent345 kV600 MW3.5 yrs64.8
EC Near Westside Landfill Gas RecoveryGreenfield——3.5 yrs63.4
EC Near Westside Landfill Gas RecoveryGreenfield——3.5 yrs62.0
EC Near Westside Landfill Gas RecoveryGreenfield——3.5 yrs60.7
EC Near Westside Landfill Gas RecoveryGreenfield——3.5 yrs60.5

Greenfield (UNKNOWN303962 - None): common questions

What is the DC Readiness score of Greenfield (UNKNOWN303962 - None)?

Greenfield (UNKNOWN303962 - None) scores 46.6/100 on the GridCensus DC Readiness scale, rated fair. It ranks 36th of 36 scored sites in Parker. The Parker average is 57.4 and the California average is 45.4.

What is the nearest substation to Greenfield (UNKNOWN303962 - None)?

The nearest mapped substation is UNKNOWN303962, at 138 kV. GridCensus catalogs 100 MW of candidate capacity for the site.

What grid region is Greenfield (UNKNOWN303962 - None) in?

Greenfield (UNKNOWN303962 - None) is in the ERCOT region. Projects interconnecting there have averaged a 7.6-year wait from queue request to operation.

Is Greenfield (UNKNOWN303962 - None) in a flood zone?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk).

How far is Greenfield (UNKNOWN303962 - None) from an internet exchange?

The nearest internet exchange facility is Alpheus Fort Worth (307 W 7th St), about 33.5 miles away; 10 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Greenfield (UNKNOWN303962 - None), Parker, CA”, https://gridcensus.com/datacenter-sites/california/parker/greenfield-unknown303962-none-0be61699 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Greenfield (UNKNOWN303962 - None), Parker is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.