Grimes has 23 scored datacenter candidate sites averaging 58.5/100 DC Readiness, with a catalogued aggregate of 3,600 MW. FEMA rates local natural-hazard risk as "Very High". The county has a datacenter tax incentive on record.

At a glance

Grimes, Texas has 23 scored datacenter candidate sites averaging 58.5/100 DC Readiness, roughly in line with the Texas average of 56.4. It ranks 82nd of 234 Texas counties by number of sites and 28th by average score. The top-scoring site is GIBBONS CREEK at 64.3/100.

23
Candidate sites
58.5/100
Avg DC Readiness
3,600 MW
Catalogued capacity
theoretical aggregate
Very High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 23 in Grimes

Site-selection context for Grimes

Yessales_tax_exemption
Datacenter tax incentive
11.87¢/kWh
Commercial electricity
7.63¢/kWh
Industrial electricity
7
Fiber providers
Medium-High
Water stress
$3,448
Land price / acre
2,600
Cooling degree days
1,800
Heating degree days
65°F
Mean annual temp

Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.

How does Grimes compare with other counties in Texas?

By number of scored sites, Grimes ranks 82nd of the 234 Texas counties with a county page, holding 0.3% of the state's 6,839 sites. Its average DC Readiness of 58.5/100 ranks 28th in the state and is about 10% above the national average of 53.0. Nationally it has the 1558th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 22 score 55 or higher.

What types of datacenter sites are in Grimes?

Substation-Adjacent sites are the most common (16, 70% of the county's inventory), followed by greenfield (6) and former mine (1). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Grimes?

Industrial electricity averages 7.63¢/kWh and commercial 11.87¢/kWh. FEMA's National Risk Index rates the county "Very High" (55). WRI water stress is medium-high. 7 fiber providers report service in the county. The climate runs 2,600 cooling degree days a year with a mean temperature of 65°F. Land is valued around $3,448 an acre.

By site type

Top datacenter sites in Grimes

Top datacenter sites in Grimes
SiteTypeVoltageCapacityQueue waitScore
GIBBONS CREEKSubstation-Adjacent345 kV600 MW3.5 yrs64.3
SINGLETONSubstation-Adjacent345 kV600 MW3.5 yrs62.8
GRIMESSubstation-Adjacent345 kV600 MW3.5 yrs62.5
TENASKA FRONTIER STATIONSubstation-Adjacent345 kV600 MW3.5 yrs62.5
EC Coal Grimes CountyGreenfield——3.5 yrs61.7
EC Coal Grimes CountyGreenfield——3.5 yrs60.0
OZ GrimesGreenfield——3.5 yrs59.7
UNKNOWN307165Substation-Adjacent138 kV100 MW3.5 yrs58.7
EC FFE Grimes CountyGreenfield——3.5 yrs58.7
UNKNOWN308800Substation-Adjacent138 kV100 MW3.5 yrs58.4
UNKNOWN304483Substation-Adjacent138 kV100 MW3.5 yrs58.4
UNKNOWN306287Substation-Adjacent138 kV100 MW3.5 yrs58.4
UNKNOWN308731Substation-Adjacent138 kV100 MW3.5 yrs58.3
UNKNOWN309131Substation-Adjacent138 kV100 MW3.5 yrs57.2
UNKNOWN304942Substation-Adjacent138 kV100 MW3.5 yrs57.0
EC Coal Grimes CountyGreenfield——3.5 yrs57.0
UNKNOWN307363Substation-Adjacent138 kV100 MW3.5 yrs57.0
UNKNOWN304830Substation-Adjacent138 kV100 MW3.5 yrs56.9
UNKNOWN303433Substation-Adjacent138 kV100 MW3.5 yrs56.7
UNKNOWN305919Substation-Adjacent138 kV100 MW3.5 yrs56.6
UNKNOWN303394Substation-Adjacent138 kV100 MW3.5 yrs56.4
EC Coal Grimes CountyGreenfield——3.5 yrs55.2
Mine SiteFormer Mine——3.5 yrs52.1

Every scored site in Grimes

All 23 sites, best first.

Grimes datacenter FAQ

How many datacenter sites are in Grimes?

23 scored datacenter candidate sites, averaging 58.5/100 DC Readiness. That is the 82nd-most of 234 Texas counties with five or more sites.

What is the highest-scoring datacenter site in Grimes?

GIBBONS CREEK scores 64.3/100 DC Readiness, the highest of the 23 scored sites in Grimes (a substation-adjacent site).

Does Grimes offer datacenter tax incentives?

Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.

What is the natural-hazard risk in Grimes?

FEMA's National Risk Index rates Grimes as "Very High" (score 55).

What are industrial electricity rates in Grimes?

Average industrial electricity is 7.63¢/kWh and commercial is 11.87¢/kWh in Grimes.

More in Texas

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Grimes, Texas”, https://gridcensus.com/datacenter-sites/texas/grimes (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Grimes, Texas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.