Mine Site

Former Mine

Grimes, Texas · ERCOT

DC Readiness
53.5
Fair / 100

Mine Site is a former mine datacenter candidate site in Grimes, Texas, interconnecting through ERCOT. It screens at 53.5/100 DC Readiness and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest grid bottleneck1715__B · 129 km (ERCOT)
UtilityENTERGY TEXAS INC.investor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookFavorable
≈ 1.7 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionERCOT
Queue depth1,198
Avg queue wait1.7 yrs

Connectivity

Nearest IXPCrosspoint Data College Station
IXP distance12.0 mi
Fiber providers7
Fiber coverage86.2%

Site characteristics

Site typeFormer Mine
Former useMining: Coal; Status: Abandoned
Cleanup statusAbandoned

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score45/100

Location context

Nearest datacenterCrosspoint Data College Station
DC distance12.0 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.87¢/kWh
Industrial electricity7.63¢/kWh
Cooling degree days2,600
Heating degree days1,800
Land price / acre$3,448

Regulatory climate

Favorablestate posture · as of 2026-08

No moratorium; fastest US interconnection (ERCOT). SB 6 adds large-load obligations above 75 MW.

DC tax incentiveYes
Large-load threshold≥ 75 MW

SB 6: loads ≥75 MW accept ERCOT emergency curtailment + contribute to interconnection cost.

Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Mine Site

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
66
Fiber connectivity12%
88
Energy cost10%
50
Water risk7%
44
Natural hazard6%
45
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Grimes, ranked by DC Readiness.

Sites near Mine Site
SiteTypeVoltageCapacityQueue waitScore
GIBBONS CREEKSubstation-Adjacent345 kV600 MW1.7 yrs65.8
EC Coal Grimes CountyGreenfield3.4 yrs65.6
SINGLETONSubstation-Adjacent345 kV600 MW1.7 yrs64.2
TENASKA FRONTIER STATIONSubstation-Adjacent345 kV600 MW1.7 yrs64.0
EC Coal Grimes CountyGreenfield3.4 yrs63.9
GRIMESSubstation-Adjacent345 kV600 MW1.7 yrs63.9
OZ GrimesGreenfield3.4 yrs63.6
EC FFE Grimes CountyGreenfield3.4 yrs62.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Mine Site, Grimes. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.