Datacenter Sites in Henry, Ohio

Henry has 16 scored datacenter candidate sites averaging 56.3/100 DC Readiness, with a catalogued aggregate of 709 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

Henry, Ohio has 16 scored datacenter candidate sites averaging 56.3/100 DC Readiness, roughly in line with the Ohio average of 53.2. It ranks 60th of 85 Ohio counties by number of sites and 10th by average score. The top-scoring site is Substation-Adjacent site · 33611f60 at 63.0/100.

16
Candidate sites
56.3/100
Avg DC Readiness
709 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 16 in Henry

Site-selection context for Henry

Yessales_tax_exemption
Datacenter tax incentive
12.55¢/kWh
Commercial electricity
8.11¢/kWh
Industrial electricity
13
Fiber providers
Low
Water stress
$7,859
Land price / acre
900
Cooling degree days
5,400
Heating degree days
51°F
Mean annual temp

Incentive detail: DC sales tax exemption on equipment and electricity (2022 law); JobsOhio grants.

How does Henry compare with other counties in Ohio?

By number of scored sites, Henry ranks 60th of the 85 Ohio counties with a county page, holding 0.4% of the state's 3,933 sites. Its average DC Readiness of 56.3/100 ranks 10th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1960th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 13 score 55 or higher.

What types of datacenter sites are in Henry?

Greenfield sites are the most common (12, 75% of the county's inventory), followed by brownfield (2) and substation-adjacent (1). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Henry?

Industrial electricity averages 8.11¢/kWh and commercial 12.55¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 13 fiber providers report service in the county. The climate runs 900 cooling degree days a year with a mean temperature of 51°F. Land is valued around $7,859 an acre.

By site type

Top datacenter sites in Henry

Top datacenter sites in Henry
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN113650Substation-Adjacent345 kV600 MW5.2 yrs63.0
Napoleon Solar ProjectBrownfield—4 MW5.2 yrs61.7
EC Near NapoleonGreenfield——5.2 yrs58.1
EC Near NapoleonGreenfield——5.2 yrs57.0
EC Near NapoleonGreenfield——5.2 yrs56.9
EC Near NapoleonGreenfield——5.2 yrs56.8
EC Near NapoleonGreenfield——5.2 yrs56.6
EC Near NapoleonGreenfield——5.2 yrs56.4
EC Near NapoleonGreenfield——5.2 yrs56.4
EC Near NapoleonGreenfield——5.2 yrs56.3
NapoleonBrownfield—5 MW5.2 yrs56.2
EC Near NapoleonGreenfield——5.2 yrs56.0
EC Near NapoleonGreenfield——5.2 yrs55.6
EC Near NapoleonGreenfield——5.2 yrs53.7
Former Ralph's GarageIndustrial——5.2 yrs50.4
Greenfield (UNKNOWN113650 - UNKNOWN137334)Greenfield138 kV100 MW5.2 yrs50.0

Every scored site in Henry

All 16 sites, best first.

Henry datacenter FAQ

How many datacenter sites are in Henry?

16 scored datacenter candidate sites, averaging 56.3/100 DC Readiness. That is the 60th-most of 85 Ohio counties with five or more sites.

What is the highest-scoring datacenter site in Henry?

Substation-Adjacent site · 33611f60 scores 63.0/100 DC Readiness, the highest of the 16 scored sites in Henry (a substation-adjacent site).

Does Henry offer datacenter tax incentives?

DC sales tax exemption on equipment and electricity (2022 law); JobsOhio grants.

What is the natural-hazard risk in Henry?

FEMA's National Risk Index rates Henry as "Relatively Moderate" (score 30).

What are industrial electricity rates in Henry?

Average industrial electricity is 8.11¢/kWh and commercial is 12.55¢/kWh in Henry.

More in Ohio

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Henry, Ohio”, https://gridcensus.com/datacenter-sites/ohio/henry (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Henry, Ohio is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.