Napoleon Solar Project

Brownfield

Henry, Ohio · PJM

DC Readiness
61.7
Good / 100

Napoleon Solar Project is a brownfield datacenter candidate site in Henry, Ohio, interconnecting through PJM. It screens at 61.7/100 DC Readiness with a catalogued 4 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN156616
Substation distance0.9 mi
Available capacity4 MW
LMP zonePJM_DAY
Wholesale LMP$33.80/MWh
Utility commercial rate0.13¢/kWh
UtilityTHE TOLEDO EDISON COinvestor ownedmoderate to large load · terms ≥ 25 MW

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth11
Avg queue wait3.8 yrs

Connectivity

Nearest IXPMicrotronix Datacenter Ottoville
IXP distance34.3 mi
Fiber providers13
Fiber coverage60.9%
Nearest cloud providerAWS
Nearest cloud regionus-east-2
Cloud region distance115.5 mi

Site characteristics

Site typeBrownfield
Acreage21 ac
Buildable load (est.)~821 MWland-based· grid headroom is tighter
Land owner typeprivate
Buildability75.0/100
Former uselandfill
Existing capacity4 MW
Cleanup statuscleanup_complete

Risk & environment

Environmental constraintLow (30/100)
Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteLOOKER S CORVETTES CLASSICS
Hazard sub-score60/100
Construction cost index93.2 (avg 100)

Location context

Nearest datacenterMeta Bowling Green Data Center
DC distance25.6 mi
Nearest rail0.2 mi
Nearest gas pipeline0.2 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.55¢/kWh
Industrial electricity8.11¢/kWh
Cooling degree days900
Heating degree days5,400
Land price / acre$7,859

Regulatory climate

Moderatestate posture · as of 2026-08

DC tax incentives paused for 2026; AEP Ohio large-load tariff in force.

DC tax incentiveNo / suspended
Large-load threshold≥ 25 MW

AEP Ohio tariff: ≥25 MW, 85% take-or-pay, on-site-gen curtailment sync.

Incentive detail: DC sales tax exemption on equipment and electricity (2022 law); JobsOhio grants.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Napoleon Solar Project

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
45
Speed to power20%
40
Fiber connectivity12%
67
Energy cost10%
91
Water risk7%
93
Natural hazard6%
60
Buildability7%
75
Labor market4%
50
DC cluster4%
65
Land / acreage3%
57
Construction cost3%
72
Gas pipeline2%
99
Tax incentive1%
100
Climate / cooling1%
80

Nearby comparable sites

Other scored datacenter candidate sites in Henry, ranked by DC Readiness.

Sites near Napoleon Solar Project
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN113650Substation-Adjacent345 kV600 MW3.8 yrs63.0
EC Near NapoleonGreenfield3.2 yrs58.7
EC Near NapoleonGreenfield3.2 yrs57.6
EC Near NapoleonGreenfield3.2 yrs57.5
EC Near NapoleonGreenfield3.2 yrs57.4
EC Near NapoleonGreenfield3.2 yrs57.2
EC Near NapoleonGreenfield3.2 yrs57.0
EC Near NapoleonGreenfield3.2 yrs57.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Napoleon Solar Project, Henry. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.