Skip to content
Gridcensus

Datacenter Sites in Queens, New York

Queens has 53 scored datacenter candidate sites averaging 56.8/100 DC Readiness, with a catalogued aggregate of 500 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

At a glance

Queens, New York has 53 scored datacenter candidate sites averaging 56.8/100 DC Readiness, roughly in line with the New York average of 54.0. It ranks 18th of 61 New York counties by number of sites and 8th by average score. The top-scoring site is OZ Queens · c9953edf at 61.1/100.

53
Candidate sites
56.8/100
Avg DC Readiness
500 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Queens

Site-selection context for Queens

Yessales_tax_exemption
Datacenter tax incentive
19.14¢/kWh
Commercial electricity
27.43¢/kWh
Industrial electricity
12
Fiber providers
Low
Water stress
$113,746
Land price / acre
700
Cooling degree days
6,100
Heating degree days
46°F
Mean annual temp

Incentive detail: Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.

How does Queens compare with other counties in New York?

By number of scored sites, Queens ranks 18th of the 61 New York counties with a county page, holding 1.8% of the state's 2,980 sites. Its average DC Readiness of 56.8/100 ranks 8th in the state and is roughly in line with the national average of 53.0. Nationally it has the 710th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 33 score 55 or higher.

What types of datacenter sites are in Queens?

Greenfield sites are the most common (34, 64% of the county's inventory), followed by industrial (9) and substation-adjacent (7). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Queens?

Industrial electricity averages 27.43¢/kWh and commercial 19.14¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (35). WRI water stress is low. 12 fiber providers report service in the county. The climate runs 700 cooling degree days a year with a mean temperature of 46°F. Land is valued around $113,746 an acre.

By site type

Top datacenter sites in Queens

Top datacenter sites in Queens
SiteTypeVoltageCapacityQueue waitScore
OZ QueensGreenfield——4.3 yrs61.1
OZ QueensGreenfield——4.3 yrs60.9
EC Near Charles PolettiGreenfield——4.3 yrs60.9
OZ QueensGreenfield——4.3 yrs60.8
EC Near Charles PolettiGreenfield——4.3 yrs60.8
EC Near Kennedy International Airport CogenGreenfield——4.3 yrs60.6
OZ QueensGreenfield——4.3 yrs60.6
EC Near Kennedy International Airport CogenGreenfield——4.3 yrs60.4
CORONASubstation-Adjacent138 kV100 MW4.3 yrs60.3
Kennedy International Airport CogenBrownfield—50 MW4.3 yrs60.1
JAMAICASubstation-Adjacent138 kV100 MW4.3 yrs60.1
EC Near Far RockawayGreenfield——4.3 yrs60.0
OZ QueensGreenfield——4.3 yrs59.9
EC Near Charles PolettiGreenfield——4.3 yrs59.8
OZ QueensGreenfield——4.3 yrs59.8
EC Near Far RockawayGreenfield——4.3 yrs59.8
EC Near RavenswoodGreenfield——4.3 yrs59.5
FAR ROCKAWAYSubstation-Adjacent69 kV50 MW4.3 yrs59.3
EC Near RavenswoodGreenfield——4.3 yrs59.1
EC Near RavenswoodGreenfield——4.3 yrs59.0
OZ QueensGreenfield——4.3 yrs58.9
EC Near Charles PolettiGreenfield——4.3 yrs58.6
EC Near Charles PolettiGreenfield——4.3 yrs58.3
OZ QueensGreenfield——4.3 yrs58.2
TAP135493Substation-Adjacent69 kV50 MW4.3 yrs58.1

Every scored site in Queens

All 53 sites, best first.

Queens datacenter FAQ

How many datacenter sites are in Queens?

53 scored datacenter candidate sites, averaging 56.8/100 DC Readiness. That is the 18th-most of 61 New York counties with five or more sites.

What is the highest-scoring datacenter site in Queens?

OZ Queens · c9953edf scores 61.1/100 DC Readiness, the highest of the 53 scored sites in Queens (a greenfield site).

Does Queens offer datacenter tax incentives?

Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.

What is the natural-hazard risk in Queens?

FEMA's National Risk Index rates Queens as "Relatively High" (score 35).

What are industrial electricity rates in Queens?

Average industrial electricity is 27.43¢/kWh and commercial is 19.14¢/kWh in Queens.

More in New York

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 13, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Queens, New York”, https://gridcensus.com/datacenter-sites/new-york/queens (data as of November 13, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Queens, New York is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.