Skip to content
Gridcensus

Datacenter Sites in Sierra, New Mexico

Sierra has 106 scored datacenter candidate sites averaging 46.2/100 DC Readiness, with a catalogued aggregate of 300 MW. FEMA rates local natural-hazard risk as "Relatively Low".

106
Candidate sites
46.2/100
Avg DC Readiness
300 MW
Catalogued capacity
theoretical aggregate
Relatively Low
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Sierra

Site-selection context for Sierra

No
Datacenter tax incentive
9.87¢/kWh
Commercial electricity
5.79¢/kWh
Industrial electricity
3
Fiber providers
Extremely High
Water stress
$406
Land price / acre
1,400
Cooling degree days
4,000
Heating degree days
53°F
Mean annual temp

By site type

Top datacenter sites in Sierra

Top datacenter sites in Sierra
SiteTypeVoltageCapacityQueue waitScore
OZ SierraGreenfield3.5 yrs55.8
CABALLOSubstation-Adjacent115 kV100 MW3.3 yrs52.7
EC FFE Sierra CountyGreenfield3.5 yrs52.0
ELEPHANT BUTTESubstation-Adjacent115 kV100 MW3.3 yrs51.2
OZ SierraGreenfield3.5 yrs51.1
CUCHILLO TAPSubstation-Adjacent115 kV100 MW3.3 yrs51.0
EC Coal Sierra CountyGreenfield3.5 yrs50.8
RIO GRANDEFederal Excess3.3 yrs47.2
RIO GRANDEFederal Excess3.3 yrs47.2
RIO GRANDEFederal Excess3.3 yrs47.1
RIO GRANDEFederal Excess3.3 yrs47.0
RIO GRANDEFederal Excess3.3 yrs47.0
RIO GRANDEFederal Excess3.3 yrs47.0
RIO GRANDEFederal Excess3.3 yrs46.8
RIO GRANDEFederal Excess3.3 yrs46.7
RIO GRANDEFederal Excess3.3 yrs46.7
RIO GRANDEFederal Excess3.3 yrs46.7
RIO GRANDEFederal Excess3.3 yrs46.6
RIO GRANDEFederal Excess3.3 yrs46.5
RIO GRANDEFederal Excess3.3 yrs46.4
RIO GRANDEFederal Excess3.3 yrs46.1
RIO GRANDEFederal Excess3.3 yrs46.1
RIO GRANDEFederal Excess3.3 yrs46.0
RIO GRANDEFederal Excess3.3 yrs46.0
RIO GRANDEFederal Excess3.3 yrs46.0

Sierra datacenter FAQ

How many datacenter sites are in Sierra?
106 scored datacenter candidate sites, averaging 46.2/100 DC Readiness.
Does Sierra offer datacenter tax incentives?
No datacenter-specific tax incentive is on record for Sierra in our dataset.
What is the natural-hazard risk in Sierra?
FEMA's National Risk Index rates Sierra as "Relatively Low" (score 15).
What are industrial electricity rates in Sierra?
Average industrial electricity is 5.79¢/kWh and commercial is 9.87¢/kWh in Sierra.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Sierra, New Mexico. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.