RIO GRANDE is a federal excess datacenter candidate site in Sierra, New Mexico, interconnecting through WECC. It screens at 44.1/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

UtilitySIERRA ELECTRIC COOP, INCnot available

Speed to power

Interconnection outlookConstrained
≈ 5.5 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth32
Avg queue wait3.5 yrs
Recent queue wait5.5 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPServerCondo-219 Albuquerque
IXP distance117.6 mi
Fiber providers3
Fiber coverage31.8%

Site characteristics

Acreage62 ac
Buildable load (est.)~25–62 MWland-based
Former useReclamation and Irrigation

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Extremely High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score85/100

Location context

Nearest datacenterCenturyLink DC
DC distance81.9 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveNo
Commercial electricity9.87¢/kWh
Industrial electricity5.79¢/kWh
Cooling degree days1,400
Heating degree days4,000
Land price / acre$406

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track RIO GRANDE

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
50
Fiber connectivity12%
53
Energy cost10%
50
Water risk7%
20
Natural hazard6%
85
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
58
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
0
Climate / cooling1%
55

Nearby comparable sites

Other scored datacenter candidate sites in Sierra, ranked by DC Readiness.

Sites near RIO GRANDE
SiteTypeVoltageCapacityQueue waitScore
OZ SierraGreenfield——3.5 yrs53.9
CABALLOSubstation-Adjacent115 kV100 MW3.5 yrs51.3
EC FFE Sierra CountyGreenfield——3.5 yrs50.1
ELEPHANT BUTTESubstation-Adjacent115 kV100 MW3.5 yrs49.8
CUCHILLO TAPSubstation-Adjacent115 kV100 MW3.5 yrs49.6
OZ SierraGreenfield——3.5 yrs49.2
EC Coal Sierra CountyGreenfield——3.5 yrs48.9
RIO GRANDEFederal Excess——3.5 yrs45.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for RIO GRANDE, Sierra is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.