Datacenter Sites in LAFAYETTE, Mississippi

LAFAYETTE has 18 scored datacenter candidate sites averaging 54.5/100 DC Readiness, with a catalogued aggregate of 700 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

At a glance

LAFAYETTE, Mississippi has 18 scored datacenter candidate sites averaging 54.5/100 DC Readiness, roughly in line with the Mississippi average of 53.0. It ranks 52nd of 80 Mississippi counties by number of sites and 16th by average score. The top-scoring site is Substation-Adjacent site · b1468094 at 59.0/100.

18
Candidate sites
54.5/100
Avg DC Readiness
700 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 18 in LAFAYETTE

Site-selection context for LAFAYETTE

Yessales_tax_exemption
Datacenter tax incentive
10.91¢/kWh
Commercial electricity
6.97¢/kWh
Industrial electricity
7
Fiber providers
Low
Water stress
$3,239
Land price / acre
2,400
Cooling degree days
2,400
Heating degree days
64°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

How does LAFAYETTE compare with other counties in Mississippi?

By number of scored sites, LAFAYETTE ranks 52nd of the 80 Mississippi counties with a county page, holding 0.6% of the state's 3,104 sites. Its average DC Readiness of 54.5/100 ranks 16th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1835th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 7 score 55 or higher.

What types of datacenter sites are in LAFAYETTE?

Manufacturing sites are the most common (10, 56% of the county's inventory), followed by substation-adjacent (7) and federal excess (1). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in LAFAYETTE?

Industrial electricity averages 6.97¢/kWh and commercial 10.91¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (45). WRI water stress is low. 7 fiber providers report service in the county. The climate runs 2,400 cooling degree days a year with a mean temperature of 64°F. Land is valued around $3,239 an acre.

By site type

Top datacenter sites in LAFAYETTE

Top datacenter sites in LAFAYETTE
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN169463Substation-Adjacent161 kV100 MW3.9 yrs59.0
TAP149962Substation-Adjacent161 kV100 MW3.9 yrs58.9
UNKNOWN149985Substation-Adjacent161 kV100 MW3.9 yrs58.9
SE. OXFORDSubstation-Adjacent161 kV100 MW3.9 yrs58.8
OXFORDSubstation-Adjacent161 kV100 MW3.9 yrs58.8
TAP150101Substation-Adjacent161 kV100 MW3.9 yrs57.8
W. OXFORDSubstation-Adjacent161 kV100 MW4.3 yrs56.8
ROSEBURG FOREST PRODUCTS CO. (WOOD KITCHEN CABINET AND COUNTERTOP MANUFACTURING)Manufacturing——3.9 yrs52.5
CATERPILLAR, INC. (OTHER METAL VALVE AND PIPE FITTING MANUFACTURING)Manufacturing——3.9 yrs52.5
ABILITYWORKS OF OXFORD, INC. (PRINTED CIRCUIT ASSEMBLY (ELECTRONIC ASSEMBLY) MANUFACTURING)Manufacturing——3.9 yrs52.5
OXFORD EAGLE, INC. (OTHER COMMERCIAL PRINTING)Manufacturing——3.9 yrs52.3
UNIVERSITY PRINTING SERVICES (OTHER COMMERCIAL PRINTING)Manufacturing——3.9 yrs52.2
WHIRLPOOL CORP. (INDUSTRIAL PROCESS FURNACE AND OVEN MANUFACTURING)Manufacturing——3.9 yrs52.2
OXFORD WIRE & CABLE SERVICE, INC. (OTHER ELECTRONIC COMPONENT MANUFACTURING)Manufacturing——3.9 yrs52.1
OXFORD SAND, INC. (READY-MIX CONCRETE MANUFACTURING)Manufacturing——3.9 yrs51.9
MCGREGOR INDUSTRIAL STEEL FABRICATION (IRON AND STEEL MILLS)Manufacturing——3.9 yrs51.6
NORTH MISSISSIPPI CONVEYOR, INC. (CONVEYOR AND CONVEYING EQUIPMENT MANUFACTURING)Manufacturing——3.9 yrs51.5
FSL GULFPORTFederal Excess——3.9 yrs51.4

Every scored site in LAFAYETTE

All 18 sites, best first.

LAFAYETTE datacenter FAQ

How many datacenter sites are in LAFAYETTE?

18 scored datacenter candidate sites, averaging 54.5/100 DC Readiness. That is the 52nd-most of 80 Mississippi counties with five or more sites.

What is the highest-scoring datacenter site in LAFAYETTE?

Substation-Adjacent site · b1468094 scores 59.0/100 DC Readiness, the highest of the 18 scored sites in LAFAYETTE (a substation-adjacent site).

Does LAFAYETTE offer datacenter tax incentives?

Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

What is the natural-hazard risk in LAFAYETTE?

FEMA's National Risk Index rates LAFAYETTE as "Relatively High" (score 45).

What are industrial electricity rates in LAFAYETTE?

Average industrial electricity is 6.97¢/kWh and commercial is 10.91¢/kWh in LAFAYETTE.

More in Mississippi

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in LAFAYETTE, Mississippi”, https://gridcensus.com/datacenter-sites/mississippi/lafayette (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for LAFAYETTE, Mississippi is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.