Datacenter Sites in Swift, Minnesota

Swift has 17 scored datacenter candidate sites averaging 55.7/100 DC Readiness, with a catalogued aggregate of 300 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

17
Candidate sites
55.7/100
Avg DC Readiness
300 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 17 in Swift

Site-selection context for Swift

Yessales_tax_exemption
Datacenter tax incentive
10.58¢/kWh
Commercial electricity
8.14¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$6,379
Land price / acre
600
Cooling degree days
7,700
Heating degree days
42°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment and electricity for qualified DCs.

By site type

Top datacenter sites in Swift

Top datacenter sites in Swift
SiteTypeVoltageCapacityQueue waitScore
EC Near Benson City ofGreenfield1.4 yrs59.8
EC Near Benson City ofGreenfield1.4 yrs58.5
EC Near Benson City ofGreenfield1.4 yrs58.2
EC Near Benson City ofGreenfield1.4 yrs58.0
EC Near Benson City ofGreenfield1.4 yrs57.9
EC Near Benson City ofGreenfield1.4 yrs57.6
EC Near Benson City ofGreenfield1.4 yrs57.5
EC Near Benson City ofGreenfield1.4 yrs57.4
UNKNOWN129795Substation-Adjacent115 kV100 MW2.8 yrs56.8
UNKNOWN133254Substation-Adjacent115 kV100 MW2.8 yrs56.4
TAP135049Substation-Adjacent115 kV100 MW2.8 yrs56.3
OZ SwiftGreenfield1.4 yrs56.2
EC Near Benson City ofGreenfield1.4 yrs54.2
EC Near Benson City ofGreenfield1.4 yrs54.2
Mine SiteFormer Mine2.8 yrs49.8
Mine SiteFormer Mine2.8 yrs49.8
Mine SiteFormer Mine2.8 yrs48.3

Swift datacenter FAQ

How many datacenter sites are in Swift?
17 scored datacenter candidate sites, averaging 55.7/100 DC Readiness.
Does Swift offer datacenter tax incentives?
Sales tax exemption on DC equipment and electricity for qualified DCs.
What is the natural-hazard risk in Swift?
FEMA's National Risk Index rates Swift as "Relatively Moderate" (score 25).
What are industrial electricity rates in Swift?
Average industrial electricity is 8.14¢/kWh and commercial is 10.58¢/kWh in Swift.

Dataset updated . Screening estimates derived from public data sources.