Skip to content
Gridcensus

Datacenter Sites in Swift, Minnesota

Swift has 17 scored datacenter candidate sites averaging 55.8/100 DC Readiness, with a catalogued aggregate of 300 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

Swift, Minnesota has 17 scored datacenter candidate sites averaging 55.8/100 DC Readiness, roughly in line with the Minnesota average of 56.0. It ranks 55th of 85 Minnesota counties by number of sites and 38th by average score. The top-scoring site is EC Near Benson City of · aab17753 at 59.5/100.

17
Candidate sites
55.8/100
Avg DC Readiness
300 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 17 in Swift

Site-selection context for Swift

Yessales_tax_exemption
Datacenter tax incentive
10.58¢/kWh
Commercial electricity
8.14¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$6,379
Land price / acre
600
Cooling degree days
7,700
Heating degree days
42°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment and electricity for qualified DCs.

How does Swift compare with other counties in Minnesota?

By number of scored sites, Swift ranks 55th of the 85 Minnesota counties with a county page, holding 0.5% of the state's 3,216 sites. Its average DC Readiness of 55.8/100 ranks 38th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1896th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 12 score 55 or higher.

What types of datacenter sites are in Swift?

Greenfield sites are the most common (11, 65% of the county's inventory), followed by substation-adjacent (3) and former mine (3). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Swift?

Industrial electricity averages 8.14¢/kWh and commercial 10.58¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (25). WRI water stress is low. 5 fiber providers report service in the county. The climate runs 600 cooling degree days a year with a mean temperature of 42°F. Land is valued around $6,379 an acre.

By site type

Top datacenter sites in Swift

Top datacenter sites in Swift
SiteTypeVoltageCapacityQueue waitScore
EC Near Benson City ofGreenfield——4.3 yrs59.5
EC Near Benson City ofGreenfield——4.3 yrs58.2
EC Near Benson City ofGreenfield——4.3 yrs57.9
EC Near Benson City ofGreenfield——4.3 yrs57.7
EC Near Benson City ofGreenfield——4.3 yrs57.6
EC Near Benson City ofGreenfield——4.3 yrs57.4
UNKNOWN129795Substation-Adjacent115 kV100 MW4.3 yrs57.4
UNKNOWN133254Substation-Adjacent115 kV100 MW4.3 yrs57.4
EC Near Benson City ofGreenfield——4.3 yrs57.3
TAP135049Substation-Adjacent115 kV100 MW4.3 yrs57.3
EC Near Benson City ofGreenfield——4.3 yrs57.1
OZ SwiftGreenfield——4.3 yrs55.9
EC Near Benson City ofGreenfield——4.3 yrs53.9
EC Near Benson City ofGreenfield——4.3 yrs53.9
Mine SiteFormer Mine——4.3 yrs50.8
Mine SiteFormer Mine——4.3 yrs50.8
Mine SiteFormer Mine——4.3 yrs49.3

Every scored site in Swift

All 17 sites, best first.

Swift datacenter FAQ

How many datacenter sites are in Swift?

17 scored datacenter candidate sites, averaging 55.8/100 DC Readiness. That is the 55th-most of 85 Minnesota counties with five or more sites.

What is the highest-scoring datacenter site in Swift?

EC Near Benson City of · aab17753 scores 59.5/100 DC Readiness, the highest of the 17 scored sites in Swift (a greenfield site).

Does Swift offer datacenter tax incentives?

Sales tax exemption on DC equipment and electricity for qualified DCs.

What is the natural-hazard risk in Swift?

FEMA's National Risk Index rates Swift as "Relatively Moderate" (score 25).

What are industrial electricity rates in Swift?

Average industrial electricity is 8.14¢/kWh and commercial is 10.58¢/kWh in Swift.

More in Minnesota

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Swift, Minnesota”, https://gridcensus.com/datacenter-sites/minnesota/swift (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Swift, Minnesota is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.