Datacenter Sites in Steele, Minnesota
Steele has 40 scored datacenter candidate sites averaging 58.9/100 DC Readiness, with a catalogued aggregate of 527 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.
40
Candidate sites
58.9/100
Avg DC Readiness
527 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
Site-selection context for Steele
Yessales_tax_exemption
Datacenter tax incentive
13.07¢/kWh
Commercial electricity
9.62¢/kWh
Industrial electricity
7
Fiber providers
Low
Water stress
$9,183
Land price / acre
600
Cooling degree days
7,700
Heating degree days
42°F
Mean annual temp
Incentive detail: Sales tax exemption on DC equipment and electricity for qualified DCs.
By site type
Top datacenter sites in Steele
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| UNKNOWN129409 | Substation-Adjacent | 161 kV | 100 MW | 1.4 yrs | 70.3 |
| UNKNOWN129603 | Substation-Adjacent | 161 kV | 100 MW | 1.4 yrs | 68.5 |
| UNKNOWN129423 | Substation-Adjacent | 161 kV | 100 MW | 1.4 yrs | 67.7 |
| UNKNOWN129302 | Substation-Adjacent | 161 kV | 100 MW | 1.4 yrs | 67.3 |
| EC Near Owatonna | Greenfield | — | — | 1.4 yrs | 66.2 |
| EC Near Owatonna | Greenfield | — | — | 1.4 yrs | 65.1 |
| EC Near Owatonna | Greenfield | — | — | 1.4 yrs | 65.1 |
| EC Near Blooming Prairie | Greenfield | — | — | 1.4 yrs | 64.7 |
| EC Near Owatonna | Greenfield | — | — | 1.4 yrs | 64.1 |
| Greenfield (UNKNOWN129423 - UNKNOWN129603) | Greenfield | 161 kV | 100 MW | 1.4 yrs | 63.9 |
| EC Near Blooming Prairie | Greenfield | — | — | 1.4 yrs | 63.7 |
| EC Near Blooming Prairie | Greenfield | — | — | 1.4 yrs | 63.0 |
| EC Near Owatonna | Greenfield | — | — | 1.4 yrs | 62.9 |
| EC Near Owatonna | Greenfield | — | — | 1.4 yrs | 62.8 |
| EC Near Blooming Prairie | Greenfield | — | — | 1.4 yrs | 62.8 |
| EC Near Blooming Prairie | Greenfield | — | — | 1.4 yrs | 62.7 |
| EC Near Blooming Prairie | Greenfield | — | — | 1.4 yrs | 62.2 |
| EC Near Owatonna | Greenfield | — | — | 1.4 yrs | 62.1 |
| EC Near Blooming Prairie | Greenfield | — | — | 1.4 yrs | 62.0 |
| EC Near Owatonna | Greenfield | — | — | 1.4 yrs | 62.0 |
| Blooming Prairie | Brownfield | — | 1 MW | 1.4 yrs | 61.9 |
| EC Near Owatonna | Greenfield | — | — | 1.4 yrs | 61.9 |
| EC Near Blooming Prairie | Greenfield | — | — | 1.4 yrs | 61.8 |
| EC Near Owatonna | Greenfield | — | — | 1.4 yrs | 61.8 |
| Owatonna | Brownfield | — | 26 MW | 1.4 yrs | 61.8 |
Steele datacenter FAQ
- How many datacenter sites are in Steele?
- 40 scored datacenter candidate sites, averaging 58.9/100 DC Readiness.
- Does Steele offer datacenter tax incentives?
- Sales tax exemption on DC equipment and electricity for qualified DCs.
- What is the natural-hazard risk in Steele?
- FEMA's National Risk Index rates Steele as "Relatively Moderate" (score 25).
- What are industrial electricity rates in Steele?
- Average industrial electricity is 9.62¢/kWh and commercial is 13.07¢/kWh in Steele.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Steele, Minnesota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.