Datacenter Sites in Rock, Minnesota

Rock has 31 scored datacenter candidate sites averaging 59.9/100 DC Readiness, with a catalogued aggregate of 650 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

Rock, Minnesota has 31 scored datacenter candidate sites averaging 59.9/100 DC Readiness, roughly in line with the Minnesota average of 56.0. It ranks 34th of 85 Minnesota counties by number of sites and 4th by average score. The top-scoring site is EC Near Hills · 8886286a at 62.7/100.

31
Candidate sites
59.9/100
Avg DC Readiness
650 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Rock

Site-selection context for Rock

Yessales_tax_exemption
Datacenter tax incentive
15.46¢/kWh
Commercial electricity
9.75¢/kWh
Industrial electricity
7
Fiber providers
Low
Water stress
$8,831
Land price / acre
600
Cooling degree days
7,700
Heating degree days
42°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment and electricity for qualified DCs.

How does Rock compare with other counties in Minnesota?

By number of scored sites, Rock ranks 34th of the 85 Minnesota counties with a county page, holding 1.0% of the state's 3,216 sites. Its average DC Readiness of 59.9/100 ranks 4th in the state and is about 13% above the national average of 53.0. Nationally it has the 1237th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 30 score 55 or higher.

What types of datacenter sites are in Rock?

Greenfield sites are the most common (20, 65% of the county's inventory), followed by substation-adjacent (10) and industrial (1). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Rock?

Industrial electricity averages 9.75¢/kWh and commercial 15.46¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (25). WRI water stress is low. 7 fiber providers report service in the county. The climate runs 600 cooling degree days a year with a mean temperature of 42°F. Land is valued around $8,831 an acre.

By site type

Top datacenter sites in Rock

Top datacenter sites in Rock
SiteTypeVoltageCapacityQueue waitScore
EC Near HillsGreenfield——4.3 yrs62.7
EC Near HillsGreenfield——4.3 yrs62.2
UNKNOWN132561Substation-Adjacent161 kV100 MW4.3 yrs62.0
EC Near HillsGreenfield——4.3 yrs62.0
EC Near HillsGreenfield——4.3 yrs61.7
EC Near HillsGreenfield——4.3 yrs61.3
EC Near LuverneGreenfield——4.3 yrs61.1
EC Near LuverneGreenfield——4.3 yrs61.0
EC Near LuverneGreenfield——4.3 yrs60.8
EC Near LuverneGreenfield——4.3 yrs60.7
EC Near HillsGreenfield——4.3 yrs60.7
EC Near LuverneGreenfield——4.3 yrs60.6
EC Near LuverneGreenfield——4.3 yrs60.6
EC Near LuverneGreenfield——4.3 yrs60.6
EC Near HillsGreenfield——4.3 yrs60.5
EC Near HillsGreenfield——4.3 yrs60.5
UNKNOWN144219Substation-Adjacent115 kV100 MW4.3 yrs60.3
EC Near LuverneGreenfield——4.3 yrs60.1
EC Near HillsGreenfield——4.3 yrs60.1
EC Near HillsGreenfield——4.3 yrs60.1
EC Near LuverneGreenfield——4.3 yrs60.0
UNKNOWN132573Substation-Adjacent161 kV100 MW4.3 yrs59.8
UNKNOWN130215Substation-Adjacent69 kV50 MW4.3 yrs59.0
TAP138032Substation-Adjacent69 kV50 MW4.3 yrs58.7
TAP138033Substation-Adjacent69 kV50 MW4.3 yrs58.2

Every scored site in Rock

All 31 sites, best first.

Rock datacenter FAQ

How many datacenter sites are in Rock?

31 scored datacenter candidate sites, averaging 59.9/100 DC Readiness. That is the 34th-most of 85 Minnesota counties with five or more sites.

What is the highest-scoring datacenter site in Rock?

EC Near Hills · 8886286a scores 62.7/100 DC Readiness, the highest of the 31 scored sites in Rock (a greenfield site).

Does Rock offer datacenter tax incentives?

Sales tax exemption on DC equipment and electricity for qualified DCs.

What is the natural-hazard risk in Rock?

FEMA's National Risk Index rates Rock as "Relatively Moderate" (score 25).

What are industrial electricity rates in Rock?

Average industrial electricity is 9.75¢/kWh and commercial is 15.46¢/kWh in Rock.

More in Minnesota

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Rock, Minnesota”, https://gridcensus.com/datacenter-sites/minnesota/rock (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Rock, Minnesota is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.