Datacenter Sites in Rice, Minnesota
Rice has 22 scored datacenter candidate sites averaging 62.2/100 DC Readiness, with a catalogued aggregate of 649 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.
22
Candidate sites
62.2/100
Avg DC Readiness
649 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
Site-selection context for Rice
Yessales_tax_exemption
Datacenter tax incentive
12.19¢/kWh
Commercial electricity
10.39¢/kWh
Industrial electricity
12
Fiber providers
Low
Water stress
$8,330
Land price / acre
600
Cooling degree days
7,700
Heating degree days
42°F
Mean annual temp
Incentive detail: Sales tax exemption on DC equipment and electricity for qualified DCs.
By site type
Top datacenter sites in Rice
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| EC Near West Fairbault | Greenfield | — | — | 1.4 yrs | 67.2 |
| EC Near West Fairbault | Greenfield | — | — | 1.4 yrs | 66.5 |
| EC Near West Fairbault | Greenfield | — | — | 1.4 yrs | 65.8 |
| EC Near West Fairbault | Greenfield | — | — | 1.4 yrs | 65.7 |
| EC Near West Fairbault | Greenfield | — | — | 1.4 yrs | 65.3 |
| EC Near West Fairbault | Greenfield | — | — | 1.4 yrs | 65.2 |
| EC Near West Fairbault | Greenfield | — | — | 1.4 yrs | 65.0 |
| UNKNOWN129409 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 63.2 |
| EC Near West Fairbault | Greenfield | — | — | 1.4 yrs | 62.6 |
| EC Near West Fairbault | Greenfield | — | — | 1.4 yrs | 61.9 |
| UNKNOWN129433 | Substation-Adjacent | 69 kV | 50 MW | 2.8 yrs | 60.9 |
| TAP138587 | Substation-Adjacent | 69 kV | 50 MW | 2.8 yrs | 60.8 |
| TAP138580 | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 60.6 |
| UNKNOWN129406 | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 60.6 |
| TAP138578 | Substation-Adjacent | 69 kV | 50 MW | 2.8 yrs | 60.6 |
| UNKNOWN129411 | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 60.5 |
| TAP138579 | Substation-Adjacent | 69 kV | 50 MW | 2.8 yrs | 60.0 |
| UNKNOWN129424 | Substation-Adjacent | 69 kV | 50 MW | 2.8 yrs | 60.0 |
| UNKNOWN129417 | Substation-Adjacent | 69 kV | 50 MW | 2.8 yrs | 58.9 |
| UNKNOWN133159 | Substation-Adjacent | 69 kV | 50 MW | 2.8 yrs | 58.5 |
| TAP170789 | Substation-Adjacent | 69 kV | 50 MW | 2.8 yrs | 58.4 |
| UNKNOWN133158 | Substation-Adjacent | 69 kV | 50 MW | 2.8 yrs | 58.2 |
| EC Near West Fairbault | Greenfield | — | — | 1.4 yrs | 58.1 |
| TAP138589 | Substation-Adjacent | 69 kV | 50 MW | 2.8 yrs | 58.0 |
| TAP138597 | Substation-Adjacent | 69 kV | 50 MW | 2.8 yrs | 57.9 |
Rice datacenter FAQ
- How many datacenter sites are in Rice?
- 22 scored datacenter candidate sites, averaging 62.2/100 DC Readiness.
- Does Rice offer datacenter tax incentives?
- Sales tax exemption on DC equipment and electricity for qualified DCs.
- What is the natural-hazard risk in Rice?
- FEMA's National Risk Index rates Rice as "Relatively Moderate" (score 25).
- What are industrial electricity rates in Rice?
- Average industrial electricity is 10.39¢/kWh and commercial is 12.19¢/kWh in Rice.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Rice, Minnesota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.