Datacenter Sites in Chippewa, Minnesota

Chippewa has 19 scored datacenter candidate sites averaging 54.8/100 DC Readiness, with a catalogued aggregate of 1,100 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

19
Candidate sites
54.8/100
Avg DC Readiness
1,100 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 19 in Chippewa

Site-selection context for Chippewa

Yessales_tax_exemption
Datacenter tax incentive
11.29¢/kWh
Commercial electricity
8.15¢/kWh
Industrial electricity
9
Fiber providers
Low
Water stress
$7,742
Land price / acre
600
Cooling degree days
7,700
Heating degree days
42°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment and electricity for qualified DCs.

By site type

Top datacenter sites in Chippewa

Top datacenter sites in Chippewa
SiteTypeVoltageCapacityQueue waitScore
MINN VALLEYSubstation-Adjacent345 kV600 MW2.8 yrs62.5
GRANITE FALLSSubstation-Adjacent230 kV300 MW2.8 yrs59.9
EC Near Minnesota ValleyGreenfield1.4 yrs57.8
EC Near Minnesota ValleyGreenfield1.4 yrs57.5
EC Near Minnesota ValleyGreenfield1.4 yrs57.4
EC Near Minnesota ValleyGreenfield1.4 yrs57.2
EC Near Minnesota ValleyGreenfield1.4 yrs57.0
EC Near Minnesota ValleyGreenfield1.4 yrs56.9
EC Near Minnesota ValleyGreenfield1.4 yrs56.8
EC Near Minnesota ValleyGreenfield1.4 yrs56.4
UNKNOWN131974Substation-Adjacent115 kV100 MW2.8 yrs55.3
TAP138555Substation-Adjacent115 kV100 MW2.8 yrs55.2
EC Near Minnesota ValleyGreenfield1.4 yrs54.0
EC Near Minnesota ValleyGreenfield1.4 yrs51.9
Mine SiteFormer Mine2.8 yrs49.6
Mine SiteFormer Mine2.8 yrs49.6
Mine SiteFormer Mine2.8 yrs49.6
Mine SiteFormer Mine2.8 yrs49.6
EC Near Minnesota ValleyGreenfield1.4 yrs47.8

Chippewa datacenter FAQ

How many datacenter sites are in Chippewa?
19 scored datacenter candidate sites, averaging 54.8/100 DC Readiness.
Does Chippewa offer datacenter tax incentives?
Sales tax exemption on DC equipment and electricity for qualified DCs.
What is the natural-hazard risk in Chippewa?
FEMA's National Risk Index rates Chippewa as "Relatively Moderate" (score 25).
What are industrial electricity rates in Chippewa?
Average industrial electricity is 8.15¢/kWh and commercial is 11.29¢/kWh in Chippewa.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Chippewa, Minnesota. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.